DS-QMS-16 R1 Contingency Plan
DS-QMS-16 R1 Contingency Plan
All Dept is not accesible/ not able to continue Alternate Label manufacturing facility are Auto customers orders for a day were not Alernate supplier for label
with production identified for emergencies. produced inside the plant, it was distributed manufactruing are having a
2 Jun-19 Fire* All Dept 1. Vision Labels located in Konankunte among 2 alternate label manufacturer who are good facility, with 3 printing
cross, in contract with our organisation in case of machine and 4 punching
2. JMS Technologies located in Electronic emergenicies. Mahindra Reva 000-03-93, SFL- machines, which are not
City 5924 parts were prodcued in pressence of our fully utilised. Hence, in case
All Dept is not accesible/ not able to continue quality person Venkatesh at their premises. and of any fire or natural
with production could dispatch the materials next day itself. 2.7.2019 2.7.2019 disaster contigency can be
met.
3 Jun-19 Recurring Natural All Dept
Disasters*
Punching M/c 7
Screen
5 Aug-19 Tooling Damages
Die
Power Supply Outages of Power DG set is available
6 Sep-19 Utilitiy Interuptions
Compressed Air Breakdown of compressor 3 sets are available
10 Jan-19 Transportation* Courier Service Emergency Alternate Courier services are available
Document No: DS-QMS-16 R2
Printing Absentism 3
Punching Absentism 1
Can meet
2 Process Equipments Printing Cylindrical M/C Breakdown 3 contingency
Punching M/c 7
Screen can be
Screen made within 3 hrs
3 Tooling Damages
dies can be
Die rebladed within 6
hrs
can meet
6 Bending Machine Router Emergency Subcon Jeyess undustries
contingency
DS-QMS-16 R0