CDO NEW BUILDING To : DCCD From : BROSCO CONSTRUCTION & DEVELOPMENT CORP.
Attention : P.O. No.
Thru : NOEL A. MACASOJOT Work Scope : CONDESER DRAIN LAYOUT
Date of Submittal: 26-Sep-18 SLTE-SRF No. : ME-103 ACTION TYPE QTY UNIT DESCRIPTION CODE DATE Remarks 1 PAGE PROPOSED CONDENSER DRAIN PIPE SHOP LAYOUT AS PER ACTUAL CONDITION DRAWING
Having reviewed this submittal, we certify that it conforms
PM's Comments: to the contract conditions in all respect
ENGR. CESAR VILLAGOMEZA
BROSCO CONST. & DEV'T CORP. ACTION CODE: A - Approved Signed by: B - Approved with Comments C - Revise and Re-submit, (Work may NOT PROCEED) D - Disapproved, (Work may NOT PROCEED) (Signature over Printed Name) ENGINEER's / ARCHITECT's Comments: OWNER's Comments;
Signed by : Signed by :
(Signature over Printed Name) (Signature over Printed Name)