After Activity Report Re Inspection Molave 2017
After Activity Report Re Inspection Molave 2017
MEMORANDUM
-----------------------------------------------------------
1. Please be informed that OOA 14 1100H October 2014
BJMP Logistics Officers ,Regional Office conduct inspection. On
the site and it was Pound out that The Construction Temporarily
stop due to the following Reason
2. That main Road way Leads to the site area is not easily
transport the Materials to utilize on the construction.
RANK/NAME DESIGNATION
UNIT ASSIGNMENT
J/SUPT WENEFREDO P ABORDO Logistic Division
BJMP-NHQ
J/SINSP ALBERTO M MARIANO Logistic Division
BJMP-NHQ
J/INSP SALIDIN L SAIPUDIN Regional Logistics
BJMP RO-IX
(Sgd.)ROBERT V ACEVEDO, JR
Senior Jail Officer III
Officer-In-Charge, DCJ
(Top) Jail Facility Inspection. During the surprise visit of J/SUPT WENEFREDO P ABORDO, C ,
Logistic Division, BJMP-NHQ together with Regional Logistic Division Chief, J/INSP SALIDIN L
SAIPUDIN. (Bottom) while SINSP ALBERTO P MARIANO, takes a photo specimen for the
inspection, as OIC-DCJ, SJO3 Robert V Acevedo, looks on.