BARANGAY SOUTH SIGNAL HALL BLOTTER AND CURFEW SYSTEM

Implementation Phase
1 Checking of the system Requirements
1.1Hardware Requirements
1.2 System Requirements

1.2.1 Determining which past data is


acquired.
2 Testing
2.1 Unit Testing
2.1.1 Module evaluation
2.1.2 Module Improvement

2.2 User testing


2.2.1 user test review
2.3 System Testing
3. Training of end users
4. Implementation Notice
4.1 User Acceptance
5. Installation
5.1 conversion of the project
5.2 Evaluation of project
6. System Documentation
6.1 SDD
6.2 User’s Manual

Applicable System implementation tasks to the project:

 Provide appropriate training for personnel


 Provide team/members on the implementation site
 Ensure that the software is compatible on the hardware and software requirements
 Test the system before implementation
 Perform conversion before the implementation
 Prepare or notice the site for implementation
 Provide Planning and coordination for implementation
 Provide needed back-ups/software installers needed for the implementation
 Provide user guides/manuals