You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS
OFFICE OF THE BUILDING OFFICIAL
ARCHITECTURAL
PERSPECTIVE
A-1 SITE DEVELOPMENT PLAN PARAÑAQUE CITY
VICINITY MAP
CITY /DISTRICT / MUNICIPALITY
GROUND FLOOR PLAN
A-2 SECOND FLOOR PLAN
ROOF DECK PLAN
ROOF PLAN
GROUND FLOOR REFLECTED CEILING PLAN
A-3
SECOND FLOOR REFLECTED CEILING PLAN
ROOF DECK REFLECTED CEILING PLAN
FRONT ELEVATION
LAND USE AND ZONING
LEFT SIDE ELEVATION
RIGHT SIDE ELEVATION
A-4
REAR ELEVATION
SECTION THRU A
SECTION THRU B
A-5 DOOR AND WINDOWS SCHEDULE

LINE AND AND GRADE


STRUCTURAL
STRUCTURAL NOTES
S-1 TABLE OF LAP AND SPLICE AND ANCHORAGE LENGTH
STRUCTURAL DETAILS
FOUNDATION PLAN
S-2 SECOND FLOOR FRAMING PLAN
ROOF DECK FRAMING PLAN ARCHITECTURAL
ROOF FRAMING PLAN
SLAB DETAIL
S-3
TRUSS DETAILS
COLUMN AND BEAM SCHEDULE

STRUCTURAL

ELECTRICAL
GENERAL NOTES
LEGEND AND SYMBOLS

F B

3 175
C

1 950
D
13 125

2 225
E

2 250
E'

3 525
F
THE SITE E-1
LOCATION MAP
CATV RISER DIAGRAM
CCTV RISER DIAGRAM
TELEPHONE RISER DIAGRAM ELECTRICAL
63 GOLD ST. R. MEDINA SUBD. BRGY. LAN/FIBER RISER DIAGRAM
GROUND FLOOR LIGHTING LAYOUT
SAN DIONISIO PARAÑAQUE CITY SECOND FLOOR LIGHTING LAYOUT
ROOF DECK LIGHTING LAYOUT
E-2
6 WATER TANK GROUND FLOOR POWER LAYOUT
2 437

BASE
SECOND FLOOR POWER LAYOUT
ROOF DECK POWER LAYOUT
5 SANITARY

AH
LOAD COMPUTATION
E-3
1 900

-26
SINGLE LINE DIAGRAM
4 200

RD PLUMBING
A
3 100

STORAGE GROUND FLOOR WATERLINE LAYOUT


A5
4
13 634

METROBANK Es
cu SECOND FLOOR WATERLINE LAYOUT
ROOF DECK do
Ln ROOF DECK WATERLINE LAYOUT
P-1 PLUMBING
2 548

Lir GROUND FLOOR SANITARY LAYOUT


T&B e
DN PUREGOLD JUNIOR SUPERMARKET Ln SECOND FLOOR SANITARY LAYOUT
3 ROOF DECK SANITARY LAYOUT
4 450

PUREGOLD JUNIOR SUPERMARKET GENERAL NOTES


2 702

LEGEND AND SYMBOLS


WATERLINE ISOMETRIC DIAGRAM

Do
P-2
2

lla
BUREAU OF INTERNAL REVENUE DISTRICT OFFICE SANITARY ISOMETRIC DIAGRAM
600 500

rL
n
1 748

SEPTIC TANK DETAILS MECHANICAL


CATCH BASIN DETAILS
1 UNIVERSAL COLLEGE
EVACOM PLAZA
GENERAL NOTES :

1. CONTRACTOR MUST CHECK ALL DIMENSIONS AT SITE.


ANY DISCREPANCIES MUST BE REPORTED IMMEDIATELY
A4
A

TO ARCHITECT BEFORE PROCEEDING TO WORK. ELECTRONICS


2. ARCHITECTURAL FLOOR AND CEILING LAYOUTS
SHALL ALWAYS GOVERN IN CASE OF DISCREPANCIES
WITH ENGINEERING DRAWINGS.
3. CONTRACTOR/ SUPPLIER SHOULD INSPECT
ACTUAL SITE CONDITIONS BEFORE ANY
FABRICATION AND INSTALLATION.
4. ALL COLORS OF PAINT ARE SUBJECT FOR ARCHITECT'S
AND OWNERS APPROVAL GEODETIC
R.A. 9266 ARCHITECT: PROJECT TITLE : OWNER : SHEET CONTENT : REVISIONS PROJECT NO. : - SHEET NO.

JP JP ARCHITECTS
Drawings, specifications and other MARK DATE
contract documents, as instruments of PROPOSED TWO STOREY RESIDENCE MRS. EMILLAIDE AND MR. REMART MEDALLA
DRAWN BY : JHP
service, are intellectual property and
documents of the ARCHITECT. It shall be
unlawful for person to duplicate or to
IAPOA NO:
WITH ROOF DECK CHECKED BY : ARJAPS A-1
LOCATION:
A-5
make copies of said documents whether
executed partly or in whole, without the PTR NO: DATE: 63 GOLD ST. R. MEDINA SUBD. BRGY. OWNERS APPROVAL : DATE :
written consent of the ARCHITECT or
PRC REG.NO: TIN NO:
AUTHOR of said documents. SAN DIONISIO PARAÑAQUE CITY APPROVED BY:

You might also like