Professional Documents
Culture Documents
Ericsson Internal
2G MODERIZATION 1 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
CLUSTER JABO 26
Abstract
This document is to provide report for XL Axiata as KPI acceptance.
`
Ericsson Internal
2G MODERIZATION 2 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
Contents
1 Introduction...........................................................................................3
1.1 Measurement Methodology.......................................................3
1.1.1 Drive Test Measurement............................................................3
1.2 General Cluster Information.......................................................4
2 Result.....................................................................................................5
2.1 Drive Test Result.......................................................................5
2.1.1 Idle mode...................................................................................6
2.1.1.1 Rx Level....................................................................................6
2.1.2 Active mode...............................................................................6
2.1.2.1 Rx Qual.....................................................................................6
2.2.2.1 SQI............................................................................................7
3 CONCLUSION........................................................................................8
`
Ericsson Internal
2G MODERIZATION 3 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
1 Introduction
Site KPI report is provided to XL Axiata as part of KPI 2G/3G enhancement
(RUS modernization).
Drivetest for final report will show Rx Level and Rx Qual plot. During test
measurement, Drivetest will use K800 phone to measure Rx Level and Rx
Qual each cluster.
`
Ericsson Internal
2G MODERIZATION 4 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
RF Team :
DT Team : Kurniadi Putra
This site is located in Cluster 26 as shown in above picture. The cluster has
22 of 24 sites (92%).
`
Ericsson Internal
2G MODERIZATION 5 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
2 Result
Idle
Rx Level Plot
BEFORE AFTER
`
Ericsson Internal
2G MODERIZATION 6 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
Active mode
Rx Quality
BEFORE AFTER
SQI
BEFORE AFTER
`
Ericsson Internal
2G MODERIZATION 7 (8)
Prepared (also subject responsible if other) No.
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
Cluster Owner
Approved Checked Date Rev Reference
EID/Hartis 07-03-2017
3 CONCLUSION
Based on monitoring, there after this site will be declared as ACCEPTED