You are on page 1of 8

`

Ericsson Internal
2G MODERIZATION 1 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

2GCluster J5 Modernization Performance Report

CLUSTER JABO 26

Abstract
This document is to provide report for XL Axiata as KPI acceptance.
`
Ericsson Internal
2G MODERIZATION 2 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

Contents
1 Introduction...........................................................................................3
1.1 Measurement Methodology.......................................................3
1.1.1 Drive Test Measurement............................................................3
1.2 General Cluster Information.......................................................4
2 Result.....................................................................................................5
2.1 Drive Test Result.......................................................................5
2.1.1 Idle mode...................................................................................6
2.1.1.1 Rx Level....................................................................................6
2.1.2 Active mode...............................................................................6
2.1.2.1 Rx Qual.....................................................................................6
2.2.2.1 SQI............................................................................................7
3 CONCLUSION........................................................................................8
`
Ericsson Internal
2G MODERIZATION 3 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

1 Introduction
Site KPI report is provided to XL Axiata as part of KPI 2G/3G enhancement
(RUS modernization).

1.1 Measurement Methodology

RF Tuning Final reports consist of 2 measurement Statistic and Drive test


measurement. Where, each measurement have target to be achieved.

1.1.1 Drive Test Measurement

Drivetest for final report will show Rx Level and Rx Qual plot. During test
measurement, Drivetest will use K800 phone to measure Rx Level and Rx
Qual each cluster.
`
Ericsson Internal
2G MODERIZATION 4 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

General Cluster Information

RF Team :
DT Team : Kurniadi Putra

Table 1. List Site 2G MODERIZATION.

This site is located in Cluster 26 as shown in above picture. The cluster has
22 of 24 sites (92%).
`
Ericsson Internal
2G MODERIZATION 5 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

2 Result

Drive Test Result

Drive Test Drive Test


Not Mode KPI Remarks
Before After
1 IdleMode RxLevIdle >=-85 dBm 99.73% 99.60% MAINTAINED
2 RxQualSub <= 4 dB 81.92% 83.97% PASSED
3 SQI >= 18 77.56% 84.29% PASSED
Active
4 CSSR 98.15% 99.51% PASSED
Mode
5 DCR 2.42% 0.00% PASSED
6 HOSR 94.51% 98.30% PASSED

Idle

Rx Level Plot
BEFORE AFTER
`
Ericsson Internal
2G MODERIZATION 6 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

Measurement Date: (11/11/2016) Measurement Date: (07/03/2017)

RxLevIdle >=-85 dBm : 99.73% RxLevIdle >=-85 dBm : 99.60%

Active mode

Rx Quality
BEFORE AFTER

Measurement Date: (11/11/2016) Measurement Date: (07/03/2017)

RxQualSub <= 4 dB : 81.92% RxQualSub <= 4 dB : 83.97%

SQI
BEFORE AFTER
`
Ericsson Internal
2G MODERIZATION 7 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

Measurement Date: (11/11/2016) Measurement Date: (07/03/2017)

SQI >= 18 : 77.56% SQI >= 18 : 84.29%


`
Ericsson Internal
2G MODERIZATION 8 (8)
Prepared (also subject responsible if other) No.

Cluster Owner
Approved Checked Date Rev Reference

EID/Hartis 07-03-2017

3 CONCLUSION
Based on monitoring, there after this site will be declared as ACCEPTED