5) Roof Beams
Cross Beams 8 32.93 0.23 0.38
Long Beams 12 50.88 0.23 0.38
6) Roof Slab 1 32.93 50.88 0.12
CUM -
1) Lift 1
Internal & external 2 10.26 - 2.25
Lift 2
Internal & external 2 9.44 2.25
2) Columns Up to Roof Level
(a) 9"X18" 2 1.36 2.25
(b) 9"X24" 38 1.66 2.25
(C ) 12"X24" 50 1.8 2.25
STILT FLOOR
1) Lift 1
Internal & external 2 10.06 - 2.95
Lift 2
Internal Plastering
Flat No - 1
Living 1 24.28 - 2.68
Dining 1 17.92 - 2.68
Kitchen 1 16.56 - 2.68
Bed Room - 01 1 23.14 - 2.68
Dress Room 1 7.1 2.68
Toilet 1 9.42 - 2.68
Bed Room - 02 1 20.58 - 2.68
Dress Room 1 6.02 2.68
Toilet 1 8.34 - 2.68
Bed Room - 03 1 19.4 - 2.68
Measurment (m)
SI.NO DESCRIPTION OF ITEM NO'S PER AMOUNT
L B D/H
Measurment (m)
SI.NO DESCRIPTION OF ITEM NO'S PER AMOUNT
L B D/H
Flat No - 5
Living 1 21.64 - 2.68
Dining 1 24.04 - 2.68
Kitchen 1 17.3 - 2.68
Bed Room - 01 1 20 - 2.68
Dress Room 1 7.92 - 2.68
Toilet 1 9.9 - 2.68
Bed Room - 02 1 16.72 - 2.68
Dress Room 1 7.92 - 2.68
Toilet 1 9.3 - 2.68
Bed Room - 03 1 15.76 - 2.68
Toilet 1 11.14 - 2.68
Puja 1 7.1 - 2.68
Balcony 2 15.66 - 2.68
Flat No - 6
Living 1 30.26 2.68
Dining 1 11.1 2.68
Kitchen 1 16.46 2.68
Bed Room - 01 1 21.92 2.68
Dress Room 1 7.1 2.68
Toilet 1 9.42 2.68
Bed Room - 02 1 18.42 2.68
Dress Room 1 6.48 2.68
Toilet 1 9.08 2.68
Bed Room - 03 1 17.3 2.68
Dress Room 1 7.22 2.68
Toilet 1 7.86 2.68
Bed Room - 04 1 19.62 2.68
Dress Room 1 7.71 2.68
Toilet 1 9.02 2.68
Puja 1 7.06 2.68
Passage-1 1 6.86 2.68
Balcony 2 13.26 2.68
Utility 1 9.54 2.68
Dedcutions
D 6 1.06 0.23 2.1
Cost of Staircase
providing quality Handrails, 2
13) L.S 100,000.00
including material and
labour charges
11,911,410.08
Electrification including
15) fixtures and labours 10% 1,191,141.01
chargesetc.
7,950,000.00
ABSTRACT
Total Amount
(or
say)
19,77,62,000.00