ARCHITECTURE DEPARTMENT
Thesis Adviser
Presented by :
BEGHANILUM, JAE-M MANALO
2015-100500
Rizal Technological University
College of Engineering & Industrial Technology
Department of Architecture
ABSTRACT
This proposal gives an opportunity to modernize
and improve the transportation systems on mountain
ranges of the Philippines through the use of Cable-
Propelled Transit Systems (CPT-System) specifically
aerial tramways and/or gondolas.
Our current modes of transportation are greatly
affecting our environment in terms of gas emissions
coming from it. CPT-Systems doesn’t emit huge
amounts of gases since it is electrically-powered and
motor-less.
rejuvenation after the trip. Amenities will also be strategically-located throughout the site
like power substations, material recovery, waste handling facilities and open spaces that is
required by the Code.
PINNACLE: A Mixed-Use Cable-Propelled Transit Terminal Complex, is
compliant to the agendas of the Build Build Build Infrastructure Program of the current
administration. The Department of Transportation with its Secretary currently conducts a
feasibility study funded by France with €450,000 (roughly 27 Million Pesos) budget.
They see a big potential in our country adapting to CPT-Systems, let us grab that
opportunity to have this technological advancement in our time.
Upon approval, the researcher will proceed to further studies and will conform to
specific dates of submission. Your favor upon the research is highly appreciated.
Rizal Technological University
College of Engineering & Industrial Technology
Department of Architecture
S.W.O.T ANALYSIS
STRENGTHS
Innovation in the current transportation systems.
Brings scenic views during the trip.
A new concept in the infrastructure development.
It will enhance the socio-economic profile of Baguio and La Union.
It will attract more tourists and investors in the said locations.
Return of Investment is assured because of commercial establishments and rentals.
More cost-efficient than constructing new railways and bridges in terms of construc-
tion, maintenance and operational costs.
WEAKNESSES
The issue of “air rights” must be properly observed.
The exact topography and contour maps of the mountain ranges should be supplied so
that the established route will be planned properly.
The concerns of people in CPT-Systems in terms of safety must be addressed.
Data limitation since it is a prototype project.
Expensive.
OPPORTUNITIES
Businesses will occupy the stalls inside the terminal, creating revenues.
This project will be a center of activity. Thus, the surrounding areas will have an im-
proved land values. Other businessmen will build their establishments around it.
Tourism sector in the future years to come will improve.
THREATS
Meteorological phenomenas that will stop the operations of the project.
Trees, especially pine trees, will be an obstruction and needs relocation.
The aircrafts that rover around must be given great amount of consideration.