Job #: 1040-25 Submittal #: 230000-11.

0
Date: 07/09/2019 Reviewed By: JR/HDCCO
This submittal has been reviewed in general
conformance with the Plans and Specifications.
Quantities and dimensions are the responsibility of
the Subcontractor and their agents.

Corporate Headquarters
1601 Las Plumas Avenue, San Jose, CA 95133, phone 408 347 3400, fax 408 347 3418

July 8, 2019

Submittal No. 078 REV.0


Project: MyoKardia TI
Project Address: 1000 Sierra Point Parkway Roel Jonson 07/15/2019
18347
Brisbane, CA 94005

Project Contract: BASE BUILD


Therma Job No. 358901

System: Stainless Steel Capture Hoods


Spec:
Tag: N/A

Submitting Contractor General Contractor

Therma Corporation Hathaway Dinwiddie Construction Company


1601 Las Plumas Avenue 275 Battery St., Suite 300
San Jose, CA 95133 San Francisco, CA 94111

Contact: Stefan Weiss Contact: Michael Niemi


Phone: (408) 315-7709 Phone: 408-221-0399
Email: sweiss@therma.com Email: niemim@hdcco.com

Consulting Engineering Vendor

Meyers+ Engineers Therma Shop


98 Battery Street, Suite 502
1601 LAS PLUMAS
San Francisco, CA 94111
SAN JOSE CA 95133
Contact: Justin Shultz
Phone: (415) 432-8109
Email: justin@meyersplus.com

Notes:
Capture Hoods for Clean Wash, Autoclave and Glass Washes
Job #: 1040-25 Submittal #: 230000-11.0
Date: 07/09/2019 Reviewed By: JR/HDCCO
This submittal has been reviewed in general
conformance with the Plans and Specifications.
Quantities and dimensions are the responsibility of
the Subcontractor and their agents.

6 6.2 7

UTILITY ROOM

SI SI SI
MATERIAL AIRLOCK
CORRIDOR
1045
C1077

PO G
WASTE PO

1079 JANITOR
1046 STORAGE
LOCATION TO BE V.I.F.
DETERGENT
1080 G.1
CLEAN WASH
1081

DIRTY WASH 7'-1 1/16"


STORAGE
1078
1083
1
4 5 6 6.2 7 8 9

A
2

2.3

3
A.5

LOBBY
1001

CR

LOCATION TO BE V.I.F. B
INTERVIEW
1004
E

CONFERENCE
1005

INTERVIEW
TRAINING ROOM 2 STORAGE
1003 TRAINING ROOM 1 MYOCYTE LAB
1032 TRAINING ROOM 3 PHARMACOLOGY
1031 1036 1037
CORRIDOR BREAK AREA 1033 TRAINING ROOM 4 1038
1035
C1001 1030
B.5 CR

(E) STAIR 1
S101
ELEVATOR LOBBY
1002 DELICASE
ELEV 1
WATER
EL1 DISP REF
E.1
ELEV 2
EL2
CORRIDOR
C1002 (E) DOMESTIC PUMP (E) FIRE PUMP
C ROOM ROOM F

"
9/16
1040 1039

20'-4
(E) MENS CORRIDOR
RESTROOM C1003
1060 CLOSET
1059A FEC FEC
(E) JAN
MENS SHOWER
1061
1059

CLEAN STORAGE C.6


(E) WOMENS
RESTROOM
1062
MENS LOCKER
1058

CORRIDOR
C1004
LAB -E
1052
LAB -D
1051
LAB -C
1050
LAB - B
1049
LAB - A
1048
STAGE/STORAGE
1047
NMR
1043
CORRIDOR
C1005 (E) IDF ROOM
1041

DRYING ROOM (E) WOMENS


RESTROOM
1063 (E) SHOWER
1064 (E) SHOWER
1066
WOMENS LOCKER
1057

CR
SI
UTILITY ROOM
1044
(E) ELECTRICAL
ROOM
1042
(E) STAIR 2
S102
SI

1082
GOWN SI SI CR
SI
AIRLOCK SI SI MATERIAL AIRLOCK
D (E) MENS
1053
CORRIDOR
1045
SI
CORRIDOR
CLOSET
RESTROOM C1077
1109
1065 C1006

WOMENS SHOWER PO CR G
1056 WASTE PO
(E) ELEV.
1079 JANITOR ELEVATOR LOBBY SERVICE
LAB - F CONTROL
1046 STORAGE 1108 ELEVATOR
(E) FITNESS 1070 1107
CENTER 1046A EL3
1067
CORRIDOR LAB - K DETERGENT
C1077 1076 1080 G.1
CLEAN WASH
1081

28'-7 3/8"
DIRTY WASH
STORAGE (E) EMERGENCY
LAB - G 1078 (E) GENERATOR
1083 ELECTRICAL (E) ELECTRICAL
1071 1103

1'-9 1/4"
1105 1104
LAB - J
1075
SHIPPING/RECEIVING
1106

CLEAN STORAGE
ANTE
LAB - H DRYING ROOM
1073
1082
1072
LAB - I
1074

H
(E) STORAGE
1102

PROVIDE FILM ON ALL GLASS PANELS IN THE INTERIOR SIDE OF THE GLASS CHEM WASTE
STORAGE STORAGE STORAGE
1099 1100 1101
(E) TRASH
ENCLOSURE
1098

LEVEL-1 ENLARGED MECHANICAL PLAN LEVEL-1 OVERALL / KEYPLAN


2 1
Job #: 1040-25 Submittal #: 230000-11.0
Date: 07/09/2019 Reviewed By: JR/HDCCO
This submittal has been reviewed in general
conformance with the Plans and Specifications.
Quantities and dimensions are the responsibility of
the Subcontractor and their agents.

7 8 9

DE-GOWN
E.1
2024
CR SI
SI

F
FEC
CORRIDOR 9'-1 1/2"
1'-9 1/2"
C2004 0'-8 3/4"
3'-3 1/2"

CLOSET
IDF 2041A
CORRIDOR
2041
C2005
GLASSWASH
COMPOUND 2043 CR
MANAGEMENT
2045

(E) ELECTRICAL
4 5 6 6.2 7 8 9

A 2

CHEMICAL 2042 (E) STAIR 2 2.3

STORAGE S102 A.5


WORK ROOM
2003

2044 WORK ROOM


2002
OPEN OFFICE E
2005 CR SI ANTE GOWN
B WORK ROOM SI 2022
2016 SI
ANALYTICAL/FORMULATIONS
2020
SOLID DOSE SI
OFFICE
2007 2021
OFFICE
2013

OFFICE
OFFICE 2017
2008
OFFICE POWDER LAB MASS SPEC DMPK
2012 OPEN OFFICE 2023 2025 2026
B.5 2015

(E) STAIR 1 OFFICE


S101 2018
(E) ELEVATOR
LOBBY WORK ROOM CORRIDOR
C2002 SI SI
2001 2009

CORRIDOR
IC

WORK ROOM DE-GOWN


E.1
OFFICE
2010 2024
WELLNESS 2019
CR SI
2011 SI

F
C (E) MENS FEC FEC

C2006
RESTROOM CORRIDOR
CORRIDOR 2060 C2004
C2001
CORRIDOR CLOSET
C2010 (E) JAN 2059A
2061
FEC FOCUS OFFICE
FOCUS OFFICE
2056 2054 2051 CLOSET
WORK ROOM 2048
IDF 2041A
2063 CORRIDOR
2041
(E) WOMENS CORRIDOR C2005
RESTROOM C2008 GLASSWASH
2062 STORAGE CORRIDOR EQUIPMENT COMPOUND 2043 CR
C.6 CONFERENCE
2067
2059 C2003 FOCUS OFFICE
2052
OFFICE
2049
STORAGE
2047
STOCK
2046
MANAGEMENT
2045
2057

G
OFFICE
STORAGE
2073
2055
OFFICE
2074 OFFICE OFFICE (E) ELECTRICAL
OFFICE FOCUS 2053 2050 CHEMICAL 2042 (E) STAIR 2
2071 2058 STORAGE S102
PRINTER OFFICE 2044
2075
2076
CORRIDOR FEC
C2010 CORRIDOR CORRIDOR
CONFERENCE CORRIDOR
D 2068
OFFICE
C2009
C2007 C2006
2070

G
(E) ELEVATOR

(E) ELEVATOR
FEC
PROCESS MEDICINAL LOBBY
OFFICE OPEN OFFICE
OFFICE CHEMISTRY CHEMISTRY 2108
2069 2072
2077 2082 2084
UP
G.1

OFFICE

MEDICINAL LOBBY OFFICE


2078

COFFEE
2080

210
MASS SPEC (LCMS)
2083

CHEMISTRY
2079 REF

2108
DELI

2084 H

G.1

LEVEL-2 ENLARGED MECHANICAL PLAN LEVEL-2 OVERALL / KEYPLAN


2 1
Job #: 1040-25 Submittal #: 230000-11.0
Date: 07/09/2019 Reviewed By: JR/HDCCO
This submittal has been reviewed in general
conformance with the Plans and Specifications.
Quantities and dimensions are the responsibility of
the Subcontractor and their agents.
85 1/16"

25" 25"

85 1/16" CAPTURE HOOD ISOMETRIC VIEW


1
CAPTURE HOOD OVERALL DIMESNIONS
2
PROVIDE CONT. CAULKING
BETWEEN HOOD AND CEILING

PROVIDE CONT. CAULKING


BETWEEN HOOD AND
WALL
CURRENT DIMENSION DOES NOT
25" PROVIDE FOR ANY CONSTRUCTION
TOLERANCE OR CAULKING. REVISE
AND V.I.F.

94"

PROVIDE CONT. CAULKING


BETWEEN HOOD AND WASHER
CAPTURE HOOD SUPPORT DETAIL SECTION A - A
3
Job #: 1040-25 Submittal #: 230000-11.0
Date: 07/09/2019 Reviewed By: JR/HDCCO
This submittal has been reviewed in general
conformance with the Plans and Specifications.
Quantities and dimensions are the responsibility of
the Subcontractor and their agents.
3'-3 1/2"

VERIFY
IN FIELD
3'-3 1/2"

CAPTURE HOOD ISOMETRIC VIEW


1
CAPTURE HOOD OVERALL DIMESNIONS
2

VERIFY
IN FIELD

CAPTURE HOOD SUPPORT DETAIL SECTION A - A


3
Job #: 1040-25 Submittal #: 230000-11.0
Date: 07/09/2019 Reviewed By: JR/HDCCO
This submittal has been reviewed in general
conformance with the Plans and Specifications.
Quantities and dimensions are the responsibility of
the Subcontractor and their agents.
9'-1 1/2"

VERIFY
IN FIELD

9'-1 1/2"
CAPTURE HOOD ISOMETRIC VIEW
1
CAPTURE HOOD OVERALL DIMESNIONS
2

VERIFY
IN FIELD

CAPTURE HOOD SUPPORT DETAIL SECTION A - A