DESIGN PRACTICES AND STANDARDS

SUMMARY DATA SHEET † DIM † GS

1.0 NEW/UPDATED STANDARD


TITLE: GS 11-2-2 Reverse Osmosis Watermaker
REVISION DATE & NO.: September 2004 Rev 1.0

2.0 SPEC(S) USED PRIOR TO NEW/UPDATED STANDARD


TITLE: GS 11-2-2 Reverse Osmosis Watermaker
REVISION DATE & NO.: June 1999 Rev 0

3.0 PRIMARY AUTHOR(S): Tarmizi Yusof Azuddin / PPD - EMM


(Name / Dept) Darlina Hani Fadil Azim / Surf. Tech.

4.0 REVIEWERS: Ayob Yahaya / Surf. Tech.


(Name / Dept) Larry Dubose / Surf .Tech.

5.0 SUMMARY OF CHANGES

CHANGE CONSIDER FOR


CHANGE DESCRIPTION IMPACT RETROACTIVE
NO. REASON FOR CHANGE
(Indicate Para # from new/updated DIM/GS) * APPLICATION ?
(YES/NO)
1 Added: 3.2c) "Vendor shall specify the Previous experience shows NA NO
expected backwash frequency before the that RO membranes would
membrane needs to be replaced." get clogged after a few
backwash

Clarification only.

2 Added: 3.2d) "The permeator vessel has to For inspection routine. NA NO


be designed to allow the operator easy
access to the membrane cartridge within." Done on past project

Clarification only.

3 Added: 3.2h) "A vent-seal should be Added to address NA NO


installed to the permeator for detection of a maintenance purpose.
seal leakage in the membrane."
Clarification only

4 Added: 3.4c) "Motors need to have special Clarification only. NA NO


coating to handle seawater and prevent
corrosion."

5 Deleted: 3.6b) "Lifting pad eyes shall be at Clarification only NA NO


the top part of the skid to prevent any
damage to the watermaker equipment.

6 Added: 3.6h) "Design of the skid should Clarification only NA NO


consider accessibility for easy maintenance
and operation by operators."

7 Added: 3.7i) "Vendor is required to install Clarification only NA NO


a Total Dissolved Solid (TDS) meter to
assist the operation in determining the
amount of TDS."

GS 11-2-2 Summary Data Sheet 1 September 2004


* Use the following abbreviations to describe change impact (ie +O means positive impact to operability, -SC means
detrimental impact to schedule). There may be more than one impact for each change.
SHE: Safety / Health / Environment I: Integrity CP: Corrosion Protection
C(US$): Cost (estimated value) O: Operability SC: Schedule
ISX: Industry Standard Exception EMX: EMEPS Exception

6.0 LIST OF UPDATED INTERNATIONAL & NATIONAL STANDARDS AND PRACTICES


REFERENCED IN THE DIM/GS.

No. Reference Standards Title/ Description Version

GS 11-2-2 Summary Data Sheet 2 September 2004


DESIGN PRACTICES AND STANDARDS
SUMMARY DATA SHEET † DIM † GS

7.0 CHECKLIST FOR NEW/UPDATED STANDARDS

Item No. Yes/No/NA Notes*


1. Does this DIM/GS require approval from Steering No
Committee or Deputy Production Manager ?

2. Is this new/revised standard really necessary ? Yes

3. Conform to applicable International standards Yes

4. Conform to applicable National standards Yes

5. Conform to EMEP Yes

6. Meet or exceed applicable regulatory requirements or NA GS 11-2-2 not in list of laws and
PETRONAS guidelines regulations applicable to DIM/GS

7. Embody responsible requirements where regulations NA


do not exist

8. Reflect latest developments and lessons learned Yes

9. Consider facilities abandonment requirements (Refer NA


to PETRONAS Guidelines for Platform
Decommissioning)

10. Consider Human Factor and Physical Security NA


requirements

11. Consider effects of new/updated industry standards Yes

12. Consider applicable Project Change Notice (PCN) Yes Non-applicable


forms

13. Incorporate approved DIM/GS Permanent Change Yes Non-applicable


Recommendation Forms

14. Consider relevant DIM/GS Bulletins Yes Not listed in DIM/GS Bulletin Log.

Notes* - Include PCN No., Safety Bulletin Ref. No., Lesson Learned Ref. No. and GS/DIM Bulletin Ref. No.

8.0 APPROVAL TO ISSUE THE NEW/UPDATED STANDARD


(Refer to Section 4.3 in DIM 0-1 / GS 0-0-1 for approval level required)

Approved by: _________________________________ Date: ____________________


(Ayob Yahaya, Subject Matter Expert)

Approved by: _____________________________ Date: ____________________


(Param Kandiah, EMM Manager)

GS 11-2-2 Summary Data Sheet 3 September 2004


DESIGN PRACTICES AND STANDARDS
SUMMARY DATA SHEET † DIM † GS

COST-ADD IMPACT OF DIM/GS CHANGE


EVALUATION FORM

DIM/GS No & TITLE: GS 11-2-2 - Reverse Osmosis Watermaker

DESCRIPTION OF CHANGE IN DIM/GS REQUIREMENT:

Requirements before change: Per GS

Requirements after change: See Section 5, Summary of Changes

EVALUATION OF LIFE CYCLE COST IMPACT:

COST ESTIMATE (US$ 'K)


COST COMPONENTS
Before Changes After Changes Impact
CAPEX
- Design
- Fabrication
- Materials
- Testing / Commissioning
- Others (describe below):

Total CAPEX Impact: NIL

OPEX (Typical Annual Cost)


Operations & Maintenance:
- Painting
- Repair
- Consumables
- Manpower Services
- Others (describe below):

Annual OPEX Impact: NA

BASIS FOR COST ESTIMATES:


All CAPEX costs are based on Class V estimates for each item that has changed in the Summary Section. No feedback
From vendors are obtained and the estimates are based on estimates from within the I&E Design Group. All costs are
estimated incremental costs.

PREPARED BY: _________________________ _____________________


Tarmizi Y Azuddin - Sept 2004 Ayob Yahaya - Sept 2004

REVIEWED BY: REVIEWED BY: N/A


EMM Manager Operation Supt
[capex portion] [opex portion]

APPROVED BY: N/A APPROVED BY: N/A


PPD Manager Operations Manager
[CAPEX > USD250K] [OPEX > USD100K]

GS 11-2-2 Summary Data Sheet 4 September 2004