DESIGN PRACTICES AND STANDARDS

† DIM † GS
SUMMARY DATA SHEET

1.0 NEW/UPDATED STANDARD


TITLE: GS 16-03-03: Electrical Cable Ladder
REVISION DATE & NO.: January 2003 Rev. 2

2.0 SPEC(S) USED PRIOR TO NEW/UPDATED STANDARD


TITLE: GS 16-03-03: Electrical Cable Ladder
REVISION DATE & NO.: August 1999 Rev. 1

3.0 PRIMARY AUTHOR(S):


(Name / Dept) Siti Juhaida Yusof / DPD - DED

4.0 REVIEWERS:
(Name / Dept) Chew Cheng Hooi
Mario J. Schellen

5.0 SUMMARY OF CHANGES

CHANGE IMPACT
Blank = None, P=Positive, D=Detrimental
NATIONAL STANDARDS EXCEPTION

INTERNATIONAL STANDARDS
ENVIRONMENTAL

EMEP EXCEPTION
SAFETY/HEALTH

OPERABILITY
CORROSION

EXCEPTION

COST CONSIDER CHANGE DESCRIPTION


SCHEDULE

IMPACT FOR (Indicate Para # from new/updated DIM/GS) REASON FOR


RETROACTIVE CHANGE
RISK

(USD K) APPLICATION
(YES/NO)
NO 4.2: The rungs on this ladder shall Typo error.
be fillet welded on all topside
intersections of rung and side rail.
NO 5.9: All composite material shall Address the
have an ultraviolet light inhibiting required
chemical additive and shall meet properties under
ASTM E-84; maximum 25 flame the mentioned
spread (Class 1 rating) or BS 476 : specs.
Part 7 - Class 1 rating, which
specify improved fire performance,
zero halogen and reduced smoke.
NO 6.0: Preparation for shipment shall To reflect the
be in accordance with GS 00-04-00 current respective
Section 12 and .............. section.
NO 7.0: The package shall be ........... To reflect the
in accordance with GS 00-04-00 current respective
Section 16. section.
DESIGN PRACTICES AND STANDARDS
† DIM † GS
SUMMARY DATA SHEET

GS 16-3-3 - Summary Datasheet.doc


6.0 LIST OF UPDATED INTERNATIONAL & NATIONAL STANDARDS AND PRACTICES
REFERENCED IN THE DIM/GS.
NIL

7.0 CHECKLIST FOR NEW/UPDATED STANDARDS


Item No. Yes/No/NA Notes*
1. Does this DIM/GS require approval from Steering
Committee or Deputy Production Manager ? No

2. Is this new/revised standard really necessary ? Yes

3. Conform to applicable International standards NA

4. Conform to applicable National standards Yes

5. Conform to EMEP NA

6. Meet or exceed applicable regulatory requirements or Yes


PETRONAS guidelines

7. Embody responsible requirements where regulations NA


do not exist

8. Reflect latest developments and lessons learned Yes

9. Consider facilities abandonment requirements (Refer NA


to PETRONAS Guidelines for Platform
Decommissioning)

10. Consider Human Factor requirements (Refer to MOH NA


Industrial Hygiene Checklist)

11. Consider effects of new/updated industry standards NA

12. Consider applicable Project Change Notice (PCN) NA No PCN raised during this period.
forms

13. Incorporate approved DIM/GS Permanent Change NA No PCR raised during this period.
Recommendation Forms

14. Consider relevant DIM/GS Bulletins NA No DIM/GS bulletin issued.

Notes* - Include PCN No., Safety Bulletin Ref. No., Lesson Learned Ref. No. and GS/DIM Bulletin Ref. No.

8.0 APPROVAL TO ISSUE THE NEW/UPDATED STANDARD


(Refer to Section 4.3 in DIM 0-1 / GS 0-0-1 for approval level required)

Approved by: _____________________________ Date: January 30, 2003


Chew Cheng Hooi
I&E Group Supervisor