You are on page 1of 1

Issued: anhvultdn@gmail.

com 01/05/2016 09:51:08 pm PST

1010 N. Batavia St. Suite J Orange, CA 92867


Phone: 888-543-6302
www.ftecu.com | sales@ftecu.com

Installation Guide: Programming Harness 09-14 Yamaha R1 - (Harness Type 2)

Step 1: Remove your left fairing to expose your ECU.

Step 2: Disconnect the 4-row ECU coupler. You should hear the connector click
as the lock disengages.

Step 3: Unlock the coupler pins by pushing in on the white plastic locking tab
(Fig1.) You should hear the connector click as the lock disengages.
Fig1. Unlock Pins
Step 4: Looking at the back of the ECU coupler (where pins and wires are
inserted), remove the white plastic weather sealing plugs in the unused
pin positions. (Fig2.)

Step 5: Insert pins as shown in (Fig2.) Brown in pin 10, Red in pin 11, Yellow in
pin 18, Green in pin 19, Orange in pin 27.

back of the ECU coupler om


Note: The beginning and end position of each row are numbered on the

Step 6: Remove the black wire with blue trace from pin position 26. Use the Fig2. Pin Location
supplied heat shrink tubing to secure the connection between the
l.c
exposed male and female pin. Insert the black male pin from the
programming harness into the female pin of the black wire with a blue
trace. Then Insert the black female wire from your programming harness
ai

into pin positon 26.


gm

Step 7: Lock the coupler pins by pressing the locking pins simultaneously (Fig3.)
until they are flush with the connector. If the connector does not lock,
check for loose or incorrectly seated contacts.
Fig3. Lock Tabs
n@

FT ECU Base Quickshifter Harness:

Included with your FT Datalink kit is your optional ECU based


quickshifter adapter. This will allow the connection of the PC5 style
td

quickshift sensor to your programming harness.


ul
hv
an

When writing to ECU connect Programming Harness to Optional QS Adapter


the FTDatalink Cable

You might also like