Professional Documents
Culture Documents
Design and Calculation of Cable - Stayed Bridge
Design and Calculation of Cable - Stayed Bridge
Diploma Thesis
Ana Spasojević
Task
2
Content of the presentation
Task
General data of the bridge
Description of bridge structures
– superstructure:
girder
pylon
stay cables
– substructure
Some details
– reinforcement plans
– assemblage of main girder
3
General data of the bridge
According to the given conditions and the accepted concept of precast
superstructures the bridge is designed as a cable-stayed beam, with
two spans 14.0+56.0=70.0 m
The superstructure of the bridge consist of: prestressed concrete deck
with 3+2x3 stay cables and one pylon placed on the left river flood plan.
Finished road level is set low in the bridge zone; to respect the conditions
of free opening above the flood flow, the designed solution has small
constant height of the deck: 77.0 cm between the finished road level to
the bottom surface of the structure.
The bridge is of constant height along the whole span
Desna obala
197.450
Leva obala 196.300
195.600 195.60
M .V. 190.525
190.025
4
General data of the bridge
view of the bridge: upstream side
Desna obala
197.450
Leva obala 196.300
195.600 195.60
M .V. 190.525
190.025
5
General data of the bridge
plan of the bridge
TOK
197.45
9
197.35
25
2%
9
420
197.31
10
10
2%
330
6
197.11
25
1400
25
25
8
196.86
1400
420
520
1400
1.375 %
25
7660
6
196.39
25
175
350 1400
196.30
350
175
1400
330
The center line of the bridge is straight, while the center line of the
river flow in the bridge zone has curvature of 400.0 m in radius, and
intersects the center line of the bridge almost perpendicularly.
The deck width is 4.2 m, with both side lateral inclination of 2.0 %
from the center line
Free profile is 2x2.0/2.5 m along the whole span - passing beside the
pylon or stay cables. 6
Description of bridge structures
superstructure: girder
Spanning structure:
– prestressed concrete girder (C 45), boxed cross section.
– formed of precaste segments, 14.0 m of length.
– the height of the girder is constant along the span, with 73.0 cm in
the center line, and 68.5 cm form the bottom edge of corona to the
bottom surface of girder (intrados)
215.119
D esna obala
197.319 197.359
197.116
L eva obala 196.589 196.868
196.396
Peskoviti {ljunak
186.700
2 x HW O120
/ Laporovita glina 2 x HW O100
/
l= 22.0 m l= 10.0 m
Zaglinjeni pesak
7000
7
Description of bridge structures
superstructure: girder
beton in situ montazni nosac N1 b. in situ montazni nosac N2 b. in situ montazni nosac N3 b. in situ montazni nosac N4 b. in situ montazni nosac N5
420 985 130 1225 80 1320 80 1320 80 1485
nepokretna lezista
pokretna lezista pokretna lezista
40
25
16
60 115 115 60
260
200
16 16 16
25
16
600
292
460
25
200
16
260 40
100 100 75 75
230 5565 6555 230 230 10 8030120 230 230 10 8030120 230 230 10 8030 150 200
120 120 120 120 120 120 120
70 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 70
70 1400 1400 1400 1400 1400 70
7000
– The part of the girder at the left pier, 0.7+3.5 m long, is cast-in-
situ solid deck.
2% 2%
9
Description of structures
superstructure: girder
215.119
Desna obala
197.319 197.359
197.116
Leva obala 196.589 196.868
196.396
Peskoviti {ljunak
186.700
2 x H W O120
/ Laporovita glina 2 x H W O100
/
l= 22 0 m l= 10 0 m
Transversal girders:
main stiffener plates in the load bearing zones are 240 cm width.
secondary stiffeners, in the main span, are 16 cm width
Bearing pads:
Fixed end bearings are placed on the left shore pier, designed as prestressed
linear hinges (pin joints)
Free end bearings (in direction of bridge’s center line) are placed
– on the foundation pier of the pylon - elastomer, type NALb 200/250/41
10
– on the right shore pier - elastomer, type NALb 200/250/107
Description of bridge structures
superstructure: girder prestressing
After assemblage of the parts of main girder, the girder is made longitudinally
continual by means of longitudinal prestressing of cables:
2% 2%
2% 2%
2% 2%
2% 2%
2% 2%
11
Description of bridge structures
superstructure: girder prestressing
Cross section of
the main girder
in IV i V field
2% 2%
2% 2%
12
Description of bridge structures
superstructure: girder prestressing
Anchorage
zone at left
shore pier
2% 2%
2% 2%
Anchorage
zone at right
shore pier
2% 2%
13
Description of bridge structures
superstructure: pylon
215.119
Desna obala
197.319 197.359
197.116
Leva obala 196.396 196.589 196.868
Peskoviti {ljunak
186.700
2 x H W O120
/ L aporovita glina 2 x HW O100
/
l= 22.0 m l= 10.0 m
Z aglinjeni pesak
7000
Central concrete pier, (concrete grade 30), is placed 14 m on the left from the left
abutment
The pylon height (measured from footing to the top) is 19.5 m
The pylon relies on the foundation pier, dimensions b/d/h = 140/ 400 /340 cm which
relies on pile helmet (cushion head); piles are φ1200 mm in diameter, l=22.0 m 14
(2HW drilled-in piles)
Description of bridge structures
superstructure: pylon
80 80
600
following 10.5 m the cross section is
voided and mould, 120 x 120 cm,
150
next 1.5 m – the transition to the
pylon head (solid mould cross
section)
1950
head of pylon - solid mould cross
M B 30
section 160.0 x 160.0 cm
1200
560
220 60 60 220
196.589
195.819
20 77
195.619 70 130 130 70
340
M B 30
100 200 200 100
520
192.525
192.219
180
M B 30
190.419
15 60 60 165 165 60 60 15
600
15
Description of bridge structures
superstructure: stay cables
Desna obala
197.450
Leva obala
196.300
195.600 195.60
M .V. 190.525
190.025
Three pairs of cables are placed between the left shore pier and the
pylon, and they are bonded to the girder in the zone of bearing
Between the pylon and the right shore pier three cables are placed, in the
center line of the bridge. They are bonded to the girder at the main cross
girders
16
Description of bridge structures
superstructure: stay cables, type Freyssinet
17
Description of bridge structures
superstructure: stay cables
20
'
12
.5
3 = 51.463 K 3' K 2' K 1'
force by adjustable anchorage
– anchorages at the pylon are
0
15
22
70 20
40 30 20
fixed.
30
30
30
50
70
40
20
40
10
M ETA LNA M A SKA
5 65 35 65 35 65
70 100 100
α3 =21.812
20
α2 =51.017
17
1 = 45.392
0
.5
24
α1 =45.392
19 4
α1 =50.485
31.5
5
35
50
73
38
41.5
24
16
3 = 21.812
14
170
170
5
24.
24.5
5
19 4
19 4
5
50
31.5
31.5
50
35
35
73
73
38
38
24
24
41.5
41.5
16
16
10
10 80 30 15 115 10 80 30 25 145
120 130
120 120
19
Description of bridge structures
superstructure: stay cables design
20
Description of bridge structures
superstructure: stay cables design
Prestressing forces inserted into structure by the stay cables, are designed
according to the following constraints :
the pylon is kept vertical under action of dead load
21
Description of bridge structures
substructure
F
196.396
88
195.600
195.000 NV V
195.626
320
320
290
430
193.200
50 50
50 50
192.700
M B 30
190.500 NPV
450
450
600
M B 15
100
186.700 100
F
A
700
185 50 330 50 185
280 100 320
400 400
25
68 25
108 20 77
20 30 370 30 20 196.389
20 20 136
C
195.60
430 D 20 80 160 20
408
211
55
300
193.200
50 10
89
192.313
360
280
100 230 100
50 165 165 50
430 100 HW [ ip O100
/
l= 10.0m
A
Presek A -A
380
50 75 155 100
430
30 370 30
25 25
100 2060 80 20 100
200
380
470
430
370
200
Presek C-C
25 25
430
430
30 70 230 70 30
Pogled B-B
23
20 80
Presek D-D
430
Analysis of bridge structures
static analysis
Three calculation models have been created to serve static analysis of the
bridge, with element properties according to the building phase
calculation model 1 - space frame, (with decomposition of the main girder in three girders)
24
Analysis of bridge structures
static analysis
calculation model 2
- space frame, with
composed main girder
calculation model 3
- plane frame
calculation model 1
- geometry of the system
26
Analysis of bridge structures
static analysis
Calculation model 1
- deformation of the
system in the phase
of assembling (F02),
before longitudinal
continuity is done
27
Analysis of bridge structures
static analysis
Calculation model 1
- deformation of the
formed system under
dead load action, in
time t=t0
28
Analysis of bridge structures
static analysis
Calculation model 1
- deformation of the
formed system under
dead load and service
load, in time t=t0
29
Analysis of bridge structures
dynamic analysis
30
Analysis of bridge structures
dynamic analysis
calculation model D2
- space frame, composed
main girder with 11 + 6
oscillating masses
calculation model D3
- plane frame, 11 + 6
vibrating masses
31
Analysis of bridge structures
dynamic analysis
IV vibration mode
II vibration mode
32
Some details...
• reinforcement plans
• assemblage of structures
33
Reinforcement plans
Reinforcement of the pylon
6Rφ25
9Rφ25
Rφ16
1 URφ10/30
3 URφ10/15 2 URφ10/30 34
Reinforcement plans
Reinforcement of the main girder
35
Reinforcement plans
Reinforcement of the main girder
36
Assembling of main girder
[ EM A TSKI PRIKA Z JA RM A
Popre~ni presek
h= promenljivo (1500)
Hidrauli~ka
presa
Radna platforma
h= promenljivo (5900)
2900
Cev O193
/
1500
190.025
Cev O400
/
Dubina zabijanja {ipa
min. 5.0m
2500
37
Assembling of main girder
h= promenljivo (1500)
h= promenljivo (1500)
H idrauli~ka H idrauli~ka
presa
presa
Radna platforma
Radna platforma
h= promenljivo (5900)
h= promenljivo (5900)
2900
2900
Cev O193
/
Cev O193
/
1500
1500
190.025
190.025
Cev O400
/
Cev O400
/ Dubina zabijanja {ipa
Dubina zabijanja {ipa min. 5.0m
min. 5.0m
2000
2000 38
Pedestrian bridge over the river Nišava in Niš
Desna obala
197.450
Leva obala
196.300
195.600 195.60
M .V. 190.525
190.025
TOK 197.45
197.359
25
2%
9
420
197.31
10
10
2%
330
6
197.11
25
1400
25
25
196.868
1400
420
520
1400
1.375 %
25
7660
6
196.39
25
175
350 1400
196.30
350
175
1400
330
39