mple Quesstion Papeer
Instrucctions:
(1) All
A question ns are comppulsory.
(2) Illustrate
I yo
our answerss with neat sketches
s whherever neceessary.
(3) Figures
F to the
t right inddicate full marks.
m
(4) Assume
A suiitable data if necessary.
(5) Preferably,
P write the annswers in seequential orrder.
(6) Use
U only H / 2H grade pencils.
(7) Line
L work and a cleanlinness will be given due weightage.
w
(8) Retain
R all constructionn lines and nomenclatur
n re.
Fig-1
g) Refer Fig-2 and
a state thee meaning of
o symbol att X.
1
Fig-2
Q.2) Atttempt any y TWO of th he followinng. 12 Marks
M
a) A cone withh a base diaameter 80 mm m and axiis height 75 5 mm is reesting on H.P.
H It is
peenetrated by y cylinder of
o diameter 40mm withh its axis paarallel to V.P. and inteersecting
axxis of cone at a distancce 25mm ab bove the basse of the conne. Draw thhe projectionns of the
soolids showinng the curvees of interseection.
b) A vertical squuare prism base 50 mm m side and height
h 90 mm
m is complletely penettrated by
a horizontal square prism m, 35 mm side and axxis 90 mm long l so thatt their axes are 6 m
appart. The axxis of the hoorizontal prism is paralllel to V.P. while the faces
fa of bothh prisms
arre equally inclined
i to the V.P. Draw
D the projections of the prismms showing lines of
inntersections.
c) A vertical sqquare prism m of 50 mm m side of base
b and 100 mm lonng having its i faces
eqqually incliined to V.P P. is completely peneetrated by a horizontaal cylinder 40 mm
diiameter andd 100 mm length
l of ax
xis ,, which is parallel to V.P. andd 6 mm aw way from
thhe axis of prrism. Draww the projecttions of soliids showinng lines of inntersectionss.
2
Fig-3 Fig-4
Q.4) Attempt the following. 16 Marks
Fig-5 shows the assembly of universal coupling. Attempt any TWO of the following.
a) Draw sectional Front View and Top View of Fork.
b) Draw sectional Front View and Top View of Center Block.
c) Draw two views each of Shaft ,collar and Key.
Fig- 5
3
(i) Sectional Front View of assembly. (8)
(ii) Half Top View. (4)
(iii) Prepare Bill of material and prepare fit chart from the given tolerance chart. (4)
Fig-6
Fig-7
******************
5
Scheme – I
6
Fig-1
b) A vertical cylinder of 80 mm diameter is penetrated by another cylinder of 60 mm
diameter, the axis of which is parallel to both the H.P and the V.P. The two axes are 8
mm apart. Draw the projections showing the lines of intersection.
c) A vertical square prism , base 50 mm side and height 90 mm has a face inclined at 30o
to the V.P. It is completely penetrated by another square prism base 38 mm side and
axis 100 mm long, face of which are equally inclined to V.P. the axis of the two prism
are parallel to V.P. and bisect each other at right angles. Draw the projections showing
the lines of intersection.
**************
7
Scheme
S –I
Fig-1
8
b) Tw
wo rectanguular plates are
a to be weelded with each
e other along
a the lenngth. The thhickness
annd length off both the plates
p is 15 mm and 800 mm respecctively. Thee plates are to be
w
welded with convex douuble V butt weld. Prepaare the weldding drawin
ng.
Table-II
Q.2 Atttempt any ONE.
O 16 Marks
Fig-2 shows the details of Old Ham
a) F m’s couplinng. Draw -
(i) Sectionaal Front Vieew of assem
mbly. (8)
(ii) Side Viiew. (4)
(iii) Preparee Bill of maaterial and give
g any eigght dimensioons. (4)
9
Fig-2
b) Fig-3 shows the assembly of Lathe Tool Post. Attempt any TWO of the following.
i) Draw sectional Front View and Top View of Post.
ii) Draw sectional Front View and Top View of Block and Ring.
10
iii) Draw two views each of Wedge and Screw.
Fig-3
11