Republic of the Philippines

University of Eastern Philippines


University Town, Northern Samar
COLLEGE OF ENGINEERING
Civil Engineering Department
S.Y. 2017-2018

Requirement
in
CE 413
(Engineering Surveying)

Proposed UEP Small Water Impounding Dam


Access Road

Submitted by:
ALO, ISIDORO III D.
BALITE, MARVIE T.
COSICO, RICHZAN RENZO C.
LAGUITAN, MIKHAEL ROI L.
LUNA, JESTONI E.
MAGDARAOG, NELA MAE B.
TENEDERO, XANDREX B.
BSCE – 4B

Submitted to:
ENGR. LEO M. SAURO
Subject Professor
PROCEDURE: 3. Design your Vertical Curves and
1. First, we conduct reconnaissance. Road
2. Chaining in every station. 4. Base on your Elevations, plot
3. Set up the total station. your cross-sections with your
4. Level the instrument and measure Original Ground and Finish
the height of the instrument at the Grade.
BOP. 5. Design your Pavement (cut and
5. The Rodman went to the first point fill)
of intersection and the Instrument man
sight at the at the prism to get the
elevation. SOLVING:
6. Proceed to side shots to get the ELEMENTS OF SIMPLE CURVE
sides and center line elevation.
7. After getting the sides and center  PI-1
line elevation of station BOP to PI-1 we I1 = 49º 9’ 53’’
proceed to set up the instrument at E =2.30m
the station PI-1 and the Rodman went I
E = R (sec − 1)
2
to the BOP. 49º 9’ 53’’
2.30 = R (sec − 1)
2
8.We back sight at the station BOP
R = 23.076m
and to get the azimuth.
1145.916
D=
9. After getting the azimuth the R
1145.916
Instrument man went to the PI-2 and D=
23.076
repeat the procedure from #3 - #6 D = 49º 39’ 30.05’’
procedure and we proceed to I
T = R (tan 2 )
traverse from PI-1 to PI-2
49º 9’ 53’’
T = 23.076 (tan )
10. Repeat the procedure from #2-#9 2

until we reach the station 1+1000. T = 10.556m


20 I
Lc =
D

PROCEDURE FOR THE CROSS-SECTION Lc=


20(49º 9’ 53’’)
49º 39’ 30.05
AND EARTHWORKS:
Lc = 19.801m
1. Plot the Horizontal Curve
2. Plot your profile (Original
 PI-2
ground Elevation on Center
I2 = 15º 56’ 16’’
Lines)
E = 1.30m
I I4 = 7º 18’ 1’’
E = R (sec2 − 1)
15º 56’ 16’’ E = 1.13m
1.30 = R (sec 2
− 1)
I
E = R (sec − 1)
R = 133.324m 2
7º 18’ 1’’
1145.916 1.13 = R (sec − 1)
D= R
2

1145.916 R = 555.904m
D = 133.324
1145.916
D= R
D = 8º 35’ 41.9’’
1145.916
I D=
T = R (tan 2) 555.904

15º 56’ 16’’ D = 2º 3’ 40.88’’


T = 133.324 (tan )
2 I
T = R (tan 2 )
T = 18.664m
7º 18’ 1’’
20 I T = 555.904 (tan )
Lc = D
2

20(15º 56’ 16’’) T = 35.463m


Lc= 8º 35’ 41.9’’ 20 I
Lc = D
Lc = 37.086m
20(7º 18’ 1’’)
Lc= 2º 3’ 40.88’’

 PI-3 Lc = 70.830m
I3 = 33º 3’ 28’’
E = 2.20m  PI-5
I I5 = 13º 2’ 19’’
E = R (sec2 − 1)
33º 3’ 28’’ E = 2.4m
2.20 = R (sec − 1)
2 I
E = R (sec2 − 1)
R = 51.038m
13º 2’ 19’’
1145.916 2.4 = R (sec − 1)
D= 2
R
1145.916 R = 368.753m
D= 51.038 1145.916
D= R
D = 22º 27’ 7.96’’
1145.916
I D=
T = R (tan 2 ) 368.753

33º 3’ 28’’ D = 3º 6’ 27.16’’


T = 51.038 (tan 2
)
I
T = R (tan 2 )
T = 15.146m
13º 2’ 19’’
20 I T = 368.753 (tan )
Lc = 2
D
20(33º 3’ 28’’) T = 42.140m
Lc=
22º 27’ 7.96’’ 20 I
Lc = D
Lc = 29.447m
20(13º 2’ 19’’)
Lc= 3º 6’ 27.16’’

 PI-4 Lc = 83.916m
20 I
Lc = D
20(23º 29’ 44’’)
Lc= 6º 7’ 44.9’’
 PI-6
Lc = 76.668m
I6 = 26º 44’ 31’’
E = 4m
I
 PI-8
E = R (sec2 − 1)
I8 = 0º 26’ 36’’
26º 44’ 31’’
4 = R (sec 2
− 1) E = 0.1m
R = 143.564m I
E = R (sec − 1)
2
1145.916
D= 0º 26’ 36’’
R 0.1 = R (sec 2
− 1)
1145.916
D = 143.564 R = 13362.00935m
D = 7º 58’ 54.9’’ 1145.916
D= R
I
T = R (tan 2 ) 1145.916
D =13362.00935
26º 44’ 31’’
T = 143.564 (tan 2
) D = 0º 5’ 8.73’’
T = 34.125m I
T = R (tan 2 )
20 I
Lc = 0º 26’ 36’’
D T = 13362.00935 (tan )
2
20(26º 44’ 31’’ )
Lc= 7º 58’ 54.9’’ T = 51.695m
Lc = 67.006m 20 I
Lc = D
20(0º 26’ 36’’)
Lc=
0º 5’ 8.73’’
 PI-7
Lc = 103.391m
I7 = 23º 29’ 44’’
E = 4m
I
 PI-9
E = R (sec − 1)
2
I9 = 3º 36’ 14’’
23º 29’ 44’’
4 = R (sec 2
− 1) E = 0.8m
R = 186.962m I
E = R (sec2 − 1)
1145.916
D= 3º 36’ 14’’
R 3 = R (sec 2
− 1)
1145.916
D = 186.962 R = 1616.975m
D = 6º 7’ 44.9’’ 1145.916
D= R
I
T = R (tan 2 ) 1145.916
D = 1616.975
23º 29’ 44’’
T = 186.962 (tan 2
) D = 0º 42’ 31.24’’
T = 38.881m I
T = R (tan 2 )
3º 36’ 14’’
T = 1616.975 (tan 2
)

T = 50.870m
20 I
Lc = D
20(3º 36’ 14’’ ) Sta PI6 = (0 + 463.57) + 84.552
Lc= 0º 42’ 31.24’’
- T6 = 34.125
Lc = 101.707m Sta PC6 = 0 + 153.997
+ Lc6 = 67.006
Sta PT6 = 0 + 581.003
STATIONING:

Sta PI1 = 0 + 108.94 Sta PI7 = (0 + 548.122) + 73.355


- T1 = 10.556 - T7 = 38.88
Sta PC1 = 0 + 98.384 Sta PC7 = 0 + 582.597
+ Lc1 = 19.801 + Lc7 = 76.668
Sta PT1 = 0 + 118.185 Sta PT = 0 + 659.265
7

Sta PI = (0 + 108.94) + 85.438


2
- T2 = 18.554 Sta PI = (0 + 625.447) + 112.995
8
Sta PC2 = 0 + 175.714 - T8 = 51.695
+ Lc = 37.086 Sta PC8 = 0 + 686.777
2
Sta PT2 = 0 + 212.8 + Lc8 = 103.39
Sta PT8 = 0 + 790.167
Sta PI3 = (0 + 194.387) + 102.623
- T3 = 15.146 Sta PI9 = (0 + 738.472) + 106.557
Sta PC3 = 0 + 281.864 - T9 = 50.87
+ Lc3 = 29.447 Sta PC9 = 0 + 794.159
Sta PT3 = 0 + 311.311 + Lc9 = 101.707
Sta PT9 = 0 + 895.866
Sta PI4 = (0 + 297.001) + 50.76
-T = 35.463
4
Sta PC4 = 0 + 312.298
+ Lc4 = 70.830
Sta PT4 = 0 + 383.128

Sta PI5 = (0 + 347.716) + 115.809


- T5 = 42.140
Sta PC5 = 0 + 421.43
+ Lc5 = 83.916
Sta PT5 = 0 + 505.346
DESIGNED VERTICAL SYMMETRICAL
PARABOLIC CURVE

𝑉𝐷 15−10.022
S1 = 𝐻𝐷 × 100 = 100
× 100 = 0.04978
𝑉𝐷 15−6.394
S2 = 𝐻𝐷 × 100 = 100
× 100 = 0.08606
g1 = + 0.04978
g2 = - 0.08606
𝐿
H= |g – g |
8 1 2
200
H= 8
|0.04978 – (-0.08606)|
H = 3.396 m
𝐻 𝑌
= 2
𝐿 2 𝑋
(2)

𝐻 3.396
K= 𝐿 = 1002
= 3.396 × 10−4
( )2
2

SOLVING FOR CROSS-SECTIONAL


AREA:

Sta. 0 + 020
(1.1204)94.3975) (2.5)(0.9583) (1.1204)(3.9320) (2.5)(1.0409)
Acut = 2
+ 2
+ 2
+ 2
Acut = 7.1650𝑚2
Sta. 0 + 040
(0.5)0.5) (0.5)(0.5) (0.4593)(3) (0.3822)(3) (3.7179)(0.7183) 3.8042(0.7183)
Acut = 2
+ 2
+ 2
+ 2
+ 2
+ 2
Acut = 4.2153𝑚2
Sta. 0 + 060
(0.5)0.5) (0.5)(0.5) (0.3543)(3) (0.438)(3) (3.8876)(0.513) 4.5966(0.513)
Acut = 2
+ 2
+ 2
+ 2
+ 2
+ 2
Acut = 3.6145𝑚2
SOLVING FOR VOLUME OF CUT/FILL:

Volume of cut from Sta. 0+020 to Sta. 0+040


𝐿
Vcut = 2 (A1+ A2)
20
Vcut = 2
(7.1650+ 4.2153)
Vcut = 113.803𝑚3
Volume of cut Sta. 0+040 to Sta. 0+060
𝐿
Vcut = 2 (A1+ A2)
20
Vcut = 2
(4.2153+ 3.6145)
Vcut = 78.298𝑚3
Volume of cut Sta. 0+060 to Sta. 0+080
𝐿
Vcut = (A1+ A2)
2
20
Vcut = 2
(3.6145+ 0.1937)
Vcut = 38.082𝑚3