For the balance units 850 paise For the balance units
Commercial Applicable to
7
Retail LT-3(ii) Tariff
Supply Areas coming under
of BESCOM VillageExisting, Proposed Approved
for FY19.
Panchayats
0 to 50 KWH 700 Ps 0 to 50 KWH
Commercial Applicable to
7 LT-3(ii) Areas coming under Village Above 50 KWH 800 Ps Above 50 KWH
Panchayats Demand Based Tariff (Optional)
Fixed charges per month per Fixed charges per month
Rs.65 per KW
KW per KW
Energy Charges Energy Charges
For first 50 units 700 paise For first 50 units
For the balance units 800 paise For the balance units
FC per KW
Electric Vehicle DC per KVA
16 LT-6 ( c)
Charging Stations
EC per KWH
(For both LT & HT)
Less than 67 HP Weekly Less than 67 HP Weekly
Temporary Power Supply Rs.190/-
17 LT-7(a) Min.per.KW Min.per.KW
for all purposes
EC per KWH 1000 Ps EC per KWH
Hoarding & Fixed charges per month per Fixed charges per month
Adveristment :Power Rs.60/-
18 LT-7(b) KW per KW
Supply on permanent
connection basis EC per KWH 1000 Ps EC per KWH
HIGH TENSION SUPPLY
DC per KVA Rs.200/- DC per KVA
19 HT-1 HT Water Supply
EC per KWH 485 Ps EC per KWH
Demand Charges (DC) per Demand Charges (DC)
Rs.210/-
HT Industrial: Applicable to KVA per KVA
Areas under Bruhat Consumption Energy Consumption Energy
20 HT-2(a)(i) Bangalore Mahanagara Charges (EC) Charges (EC)
Palike and Municipal
0 to 1 Lakh KWH 665 Ps 0 to 1 Lakh KWH
Corporations.
Above 1 Lakh KWH 695 Ps Above 1 Lakh KWH
Demand Charges (DC) per Demand Charges (DC)
Applicable to Bangalore Rs.210/-
KVA per KVA
21 HT-2(a)(i) Metropolitan Railway
Consumption Energy Consumption Energy
Corporation Ltd. (BMRCL). 600 Ps
Charges (EC) Charges (EC)
Demand Charges (DC) per Demand Charges (DC)
Rs.210/-
KVA per KVA
22 HT-2(a)(i) Railway Traction Consumption Energy
Consumption Energy
620 Ps Charges (EC) per
Charges (EC) per KWH
KWH
Demand Charges (DC) per Demand Charges (DC)
Rs.210/-
KVA per KVA
23 HT-2(a)(i) Effluent Treatment Plants Consumption Energy
Consumption Energy
620 Ps Charges (EC) per
Charges (EC) per KWH
KWH
Demand Charges (DC) per Demand Charges (DC)
Rs.200/-
KVA per KVA
HT Industrial: Applicable to Consumption Energy Consumption Energy
24 HT-2(a)(ii) Areas other than those Charges (EC) Charges (EC)
covered under HT-2(a)(i)
0 to 1 Lakh KWH 660 Ps 0 to 1 Lakh KWH
Above 1 Lakh KWH 680 Ps Above 1 Lakh KWH
Demand Charges (DC) per Demand Charges (DC)
Rs.230/-
KVA per KVA
HT Commercial Arears
under Bruhat Bangalore Consumption Energy Consumption Energy
25 HT-2(b)(i) Charges (EC) Charges (EC)
Mahanagara Palike and
Municipal Corporations. 0 to 2 Lakhs KWH 845 Ps 0 to 2 Lakhs KWH
Note: In respect of HT installation (where ever applicable) the existing demand charges levi
contract demand (Billing Demand) has been enhanced to 85%
Approved as per
Remarks
Tariff Order 2018
675 Ps 25 Ps Increased
800 PS 25 Ps Increased
620 Ps 25 Ps Increased
745 Ps 25 Ps Increased
775 Ps 25 Ps Increased
875 Ps 25 Ps Increased
mand Based Tariff (Optional)
325 Ps 25 Ps Increased
Rs.60 Rs.10/- Increased
325 Ps 25 Ps Increased
550 Ps 25 Ps Increased
675 Ps 25 Ps Increased
520 Ps 20 Ps Increased
610 Ps 20 Ps Increased
640 Ps 20 Ps Increased
Rs.65 Rs.10/- Increased
440 Ps 15 Ps Increased
Rs.80 Rs.10/- Increased
610 Ps 25 Ps Increased
510 Ps 25 Ps Increased
Rs.50/-
Rs.180/-
Newly Introduced
Tariff
485 Ps
Rs.200 No Increase
500 Ps 15 Ps Increased
Rs.210 No Increase
690 Ps 25 Ps Increased
720 Ps 25 Ps Increased
Rs.210 No Increase
Rs.210/- No Increase
600 Ps 20 Ps Decreased
Rs.210/- No Increase
640 Ps 20 Ps Increase
Rs.200 No Increase
680 Ps 20 Ps Increased
700 Ps 20 Ps Increased
Rs.230 No Increase
870 Ps 25 Ps Increased
Rs.220 No Increase
850 Ps 25 Ps Increased
860 Ps 25 Ps Increased
Rs.200 No Increase
665 Ps 25 Ps Increased
705 Ps 25 Ps Increased
Rs.200 No Increase
765 Ps 25 Ps Increased
805 Ps 25 Ps Increased
250 Ps 25 Ps Increased
250 Ps 25 Ps Increased
EC ;25 Ps Increased
450 Ps subject to Min.
Rs.120/- increase in
of Rs. 1360/- per HP
Annual Minimum Charges
per annum
Rs.120 No Increase
645 Ps 25 Ps Increased
1030 Ps 30 Ps Increased
No Weekly Minimum
charges EC: 30 Ps Increased