5.19 PROPOSED AND APPROVED TARIFF


Existing Tariff Proposed Proposed Tariff Approved Tariff
Consumer Existing Slab Existing Slab Energy Slab Range/ Proposed Energy Energy
Category Range in units Fixed Charges Consumer Slab in units Fixed Charges Fixed Charges
Charges Charges Charges
(Rs.) Category (Rs.) (Rs.)
(Rs./kWh) (Rs./kWh) (Rs./kWh)
Tariff of Low Tension Consumers
LT - IA Domestic LT - IA Domestic, Multi-tenements, Old age homes, Handlooms
1-50 kWh 2.50 15/ month 0-250 kWh 0-50 kWh 4.50 4.50
51-100 kWh 0-50 kWh 2.50 15/ month 51-100 kWh 4.50 4.50
0.00 0.00
51-100 kWh 2.50 15/ month 101-200 kWh 4.50 4.50
101-250 kWh 0-50 kWh 2.50 20/ month 201-250 kWh 6.00 6.00
51-100 kWh 2.50 20/ month
101-250 kWh 3.00 20/ month
Above 250 0-50 kWh 2.50 25/ month Above 250 0-50 kWh 4.50 4.50
kWh 51-100 kWh 3.50 25/ month kWh 51-200 kWh 4.50 4.50
101-250 kWh 4.60 25/ month 201-250 kWh 6.00 6.00
Above 250
6.60 25/ month 8.00 0.00 8.00 0.00
kWh 251-300 kWh
301-400 kWh 9.00 9.00
401-500kWh 10.00 10.00
Above 500
11.00 11.00
kWh
LT - IB Huts LT - IB Huts
4.95 (on
145/ month
installation
Single Slab (until installation Single Slab 0.00 300 Service 0.00 300 Service
of energy
of energy meter)
meter)
LT - IC LT Bulk Supply LT - IC Bulk supply with single point metering
Single Slab 4.60 60/ month Single Slab 8.00 100/kW/month 8.00 100/ month
LT-ID Common facilities in Multi-tenements
Single Slab 8.00 100/kW/month 8.00 100/kW/month
LT - IIA Public Lighting and Water Supply LT - IIA Public Lighting, Water supply provided by Govt./Local bodies

Tamil Nadu Electricity Regulatory Commission Page 229 tangedco.blogspot.com


Tamil Nadu Generation and Distribution Corporation (TANGEDCO) True-Up, ARR and Tariff Order, 2022

Existing Tariff Proposed Proposed Tariff Approved Tariff


Consumer Existing Slab Existing Slab Energy Slab Range/ Proposed Energy Energy
Category Range in units Fixed Charges Consumer Slab in units Fixed Charges Fixed Charges
Charges Charges Charges
(Rs.) Category (Rs.) (Rs.)
(Rs./kWh) (Rs./kWh) (Rs./kWh)
Single Slab 6.35 60/kW/month Single Slab 8.00 100/kW/month 8.00 100/kW/month
LT - IIB Govt. Educational Institution LT - IIB (1) Government Educational Institutions its Hostel, Govt. Hospital, Other
(1) hospitals rendering totally free service
Single Slab 5.75 60/kW/month 0-50 Kw 8.00 100/kW/month 8.00 100/kW/month
Above 50-
9.00 100/kW/month 9.00 100/kW/month
112 Kw
Above 112
Kw (CT 10.00 100/kW/month 10.00 100/kW/month
Service)
LT - IIB Pvt. Educational Institution LT - IIB (2) Private Educational Institutions/Hostel, Segregated Private Medical college
(2)
Single Slab 7.50 60/kW/month 0-50 Kw 8.50 100/kW/month 8.50 100/kW/month
Above 50-
8.50 325/kW/month 8.50 325/kW/month
112 Kw
Above 112
Kw (CT 8.50 550/kW/month 8.50 550/kW/month
Service)
LT - IIC Places of Worship LT - IIC Actual places of Public worship
0-60 kWh 5.75 60/kW/month 0-60 kWh 5.75 100/kW/month 5.75 100/kW/month
Above 60 Above 60
60/kW/month 7.00 100/kW/month 7.00 100/kW/month
kWh 5.75 kWh
LT - IIIA Cottage and Tiny Industries LT - IIIA (1) Cottage & Micro Industries
(1) 0-250 kWh 4.00 20/kW/month 0-250 kWh 4.50 70/kW/month 4.50 70/kW/month
Above 250 Above 250
6.50 70/kW/month 6.50 70/kW/month
kWh 4.60 20/kW/month kWh
LT - IIIA Power Looms LT - IIIA (2) Power Looms
(2) 0-250 kWh 5.20 60/kW/month 0-250 kWh 6.50 100/kW/month 6.50 100/kW/month
Above 250 Above 250
7.50 100/kW/month 7.50 100/kW/month
kWh 5.75 60/kW/month kWh
LT - IIIB LT Industries LT - IIIB Industries, Information Technology services
Single Slab 6.35 35/kW/month 0-50 Kw 7.50 75/kW/month 7.50 75/kW/month

Tamil Nadu Electricity Regulatory Commission Page 230 tangedco.blogspot.com


Tamil Nadu Generation and Distribution Corporation (TANGEDCO) True-Up, ARR and Tariff Order, 2022

Existing Tariff Proposed Proposed Tariff Approved Tariff


Consumer Existing Slab Existing Slab Energy Slab Range/ Proposed Energy Energy
Category Range in units Fixed Charges Consumer Slab in units Fixed Charges Fixed Charges
Charges Charges Charges
(Rs.) Category (Rs.) (Rs.)
(Rs./kWh) (Rs./kWh) (Rs./kWh)
Above 50- 7.50 150/kW/month 7.50 150/kW/month
112 Kw
Above 112
Kw (CT 7.50 550/kW/month 7.50 550/kW/month
Service)
LT - IV LT Agriculture LT - IV Agriculture and allied activities
3.22 (on
installation
Single Slab 2875/HP/Annum Single Slab 3550/HP/Annum 3550/HP/Annum
of energy
meter)
LT - V LT Commercial LT - V Miscellaneous/General purpose
0-50 kWh 5.00 70/kW/month 0-50 kWh 6.00 100/kW/month 6.00 100/kW/month
Above 50 Above 50
8.05 70/kW/month 9.50 100/kW/month 9.50 100/kW/month
kWh kWh 0-50 Kw
Above 50- 9.50 300/kW/month 9.50 300/kW/month
112 Kw
Above 112
Kw (CT 9.50 550/kW/month 9.50 550/kW/month
Service)
LT - VI Temporary Supply LT - VI Construction activities and Temporary purposes
Single Slab 12.00 345/kW/month Single Slab 12.00 550/kW/month 12.00 550/kW/month
Tariff for High Tension Consumers
HT - IA HT Industries HT - I Industries, Factories, Information Technology Services
Single Slab 6.35 350/kVA/month Single Slab 6.75 550/kVA/month 6.75 550/kVA/month
HT - IB Railways HT - IIA Government Educational Institutions/Hospitals, Railway Traction, CMRL,
Lift Irrigation societies, etc.
Single Slab 6.35 300/kVA/month Single Slab 7.00 550/kVA/Month 7.00 550/kVA/Month
HT - IIA Government Institutions
Single Slab 6.35 350/kVA/month
HT - IIB Private Educational Institutions HT - IIB Private Educational Institutions & its hostels, segregated Medical colleges

Tamil Nadu Electricity Regulatory Commission Page 231 tangedco.blogspot.com


Tamil Nadu Generation and Distribution Corporation (TANGEDCO) True-Up, ARR and Tariff Order, 2022

Existing Tariff Proposed Proposed Tariff Approved Tariff


Consumer Existing Slab Existing Slab Energy Slab Range/ Proposed Energy Energy
Category Range in units Fixed Charges Consumer Slab in units Fixed Charges Fixed Charges
Charges Charges Charges
(Rs.) Category (Rs.) (Rs.)
(Rs./kWh) (Rs./kWh) (Rs./kWh)
Single Slab 6.35 350/kVA/month Single Slab 7.50 550/kVA/month 7.50 550/kVA/month
HT - III Commercial HT - III Miscellaneous categories
Single Slab 8.00 350/kVA/month Single Slab 8.50 550/kVA/month 8.50 550/kVA/month
HT - IV Lift Irrigation with Subsidy HT - IV Construction activities and other temporary purposes
Single Slab 6.35 0.00 Single Slab 12.00 550/kVA/Month 12.00 550/kVA/Month
HT - V Temporary supply HT - V Public EV Charging Stations
05.00 to
Single Slab 11.00 350/kVA/Month 10.00 10.00
10.00
10.00 to
8.00 8.00
14.00
Time slot in 14.00 to
10.00 550/kVA/Month 10.00 550/kVA/Month
hours 18.00
18.00 to
12.00 12.00
23.00
23.00 to
8.00 8.00
05.00

Tamil Nadu Electricity Regulatory Commission Page 232 tangedco.blogspot.com