The document outlines the existing and proposed tariff structures for different categories of low tension consumers of TANGEDCO in Tamil Nadu. Some key proposed changes include:
1. Revising the slab structure for domestic consumers to 0-50 kWh, 51-100 kWh etc. up to above 500 kWh and increasing tariffs within slabs.
2. Introducing a fixed charge of Rs. 300 per month for hut consumers instead of the existing rate.
3. Increasing the fixed charges for bulk supply and common facilities in multi-tenements to Rs. 100/kW/month.
4. Retaining the existing tariff structure for places of public worship
The document outlines the existing and proposed tariff structures for different categories of low tension consumers of TANGEDCO in Tamil Nadu. Some key proposed changes include:
1. Revising the slab structure for domestic consumers to 0-50 kWh, 51-100 kWh etc. up to above 500 kWh and increasing tariffs within slabs.
2. Introducing a fixed charge of Rs. 300 per month for hut consumers instead of the existing rate.
3. Increasing the fixed charges for bulk supply and common facilities in multi-tenements to Rs. 100/kW/month.
4. Retaining the existing tariff structure for places of public worship
The document outlines the existing and proposed tariff structures for different categories of low tension consumers of TANGEDCO in Tamil Nadu. Some key proposed changes include:
1. Revising the slab structure for domestic consumers to 0-50 kWh, 51-100 kWh etc. up to above 500 kWh and increasing tariffs within slabs.
2. Introducing a fixed charge of Rs. 300 per month for hut consumers instead of the existing rate.
3. Increasing the fixed charges for bulk supply and common facilities in multi-tenements to Rs. 100/kW/month.
4. Retaining the existing tariff structure for places of public worship
Consumer Existing Slab Existing Slab Energy Slab Range/ Proposed Energy Energy Category Range in units Fixed Charges Consumer Slab in units Fixed Charges Fixed Charges Charges Charges Charges (Rs.) Category (Rs.) (Rs.) (Rs./kWh) (Rs./kWh) (Rs./kWh) Single Slab 6.35 350/kVA/month Single Slab 7.50 550/kVA/month 7.50 550/kVA/month HT - III Commercial HT - III Miscellaneous categories Single Slab 8.00 350/kVA/month Single Slab 8.50 550/kVA/month 8.50 550/kVA/month HT - IV Lift Irrigation with Subsidy HT - IV Construction activities and other temporary purposes Single Slab 6.35 0.00 Single Slab 12.00 550/kVA/Month 12.00 550/kVA/Month HT - V Temporary supply HT - V Public EV Charging Stations 05.00 to Single Slab 11.00 350/kVA/Month 10.00 10.00 10.00 10.00 to 8.00 8.00 14.00 Time slot in 14.00 to 10.00 550/kVA/Month 10.00 550/kVA/Month hours 18.00 18.00 to 12.00 12.00 23.00 23.00 to 8.00 8.00 05.00