Problem 1 [15 marks]
The following information is provided to you for each of five elements performed in building
the Aviator model, a basic universal remote control.
Mean
Performanc
Observed Frequenc
Element e rating
Time y
factor
(minutes)
1 0.96 0.96 1.0
2 1.45 1.10 1.0
3 3.33 1.00 0.33
4 1.24 0.90 1.0
5 1.18 1.05 1.0
(a) Calculate the normal time for each element.
(b) If the company uses a 15 percent allowance factor based on time worked, calculate the
standard time for each element.
(c) Calculate the standard hourly output.
(d) Calculate the expected hourly output at 90 percent of standard.
(e) A process improvement was undertaken and the mean observed time for elements 2 and 5
was recorded as 1.35 and 1 minutes respectively. Find the new standard time to build the
Aviator model?

Problem 2 [5 marks]
It is needed that you have to visit a bank to withdraw money from the ATM (adjacent to bank)
and make one demand draft (DD) of Rs 5000/- which is the registration charges for attending
one important workshop at IIT Bombay. After making the DD you have to courier it to IIT
Bombay.
Starting from your residence list all the activities needed to complete the above tasks and again
you have to return back to your residence. Develop a suitable flow process chart to demonstrate
the above activities.