You are on page 1of 1

Infrastructure

Development
Consultancy

Project Title: Strategic Food Security Facilities


Proj. Ref. No.: Time & Date of Cast:ing:
Pile Ref No.: Pile Size:

BORING DETAILS
Ground Level:

Cut-Off Level:

Pile Length:
Penetration:

Toe Level:

Time Boring Started


Time Boring Ended

BORE PILE DETAIL BORELOG


Steel Casing Depth (m) Soil Description
Size (mm) Diameter:
Length (m):

Water Level (m, bgl):


Reinforcement
No. / Bar Size (mm):
Length (m):
Link Size / Spacing (mm):

Concreting Method: Dry / Tremie #


Concrete Grade (N/mm 2):
No. of Cubes Taken:
Test Cube Ref. No:

INSPECTION
IDC Site Rep.
Site Supervisor

COMMENTS

Prepared by:
Name & Signature of IDC Engineer Date

You might also like