Doc. Ref. :
Page 1 of 1

Post Concreting Checklist


Project Ref : Date :

Location : Block No. :

Gridline / Zone : Level :

Element : Slab / Beam / Column / Wall / Drawing Ref. No. :


Staircase / Sump

Acceptability
Item Description Site Engineer Project Manager Remarks

OK Not OK OK Not OK
1 Striking of formwork
2 Visibility of cracks
3 Honeycomb
4 Bulging
5 Accuracy of structural members dimension
6 Alignment, verticality, level of structural
members
7 Deviation of structural members
8 Steel bar exposed

1) Non-Conformances 3) Re-Inspection

2) Disposition 4) Comments

Checked by Verified by Approved :

Signature Signature Signature


Name : Name : Name :
Date : Date : Date :