• Drawing Check/Review Statement


Project Name: Project No :
Originator :
Drawing �tle,
with number Checker :
and revision
Reviewer :

No Aspect Reviewed Originator | Checker No Aspect Reviewed Originator | Checker


Ini�als or ‘N/A’ Ini�als or ‘N/A’

Project �tle, project no. and task


1 14 Schedules/ Tables checked
code shown
Drawing �tle, no. and revision status
2 15 Status stamp
shown
Callout, sec�on & detail sec�on
3 North point shown 16
standard shown

4 Scales shown and correct 17 Spell check

Appearance including fonts & lines


5 18 ADA clearances check
acceptable

6 Drawing status indicator 19 ADA fixtures check & dimension

7 Signed by originator 20 Check sheet standard size

UNITED
Changes clouded and described in the References to other Drawings
8 21
revision box included

9 Dimension style 22 Delete unnecessary items

BIM
10 Line weights/ types matches the legend 23

Orienta�on/ size of hatching matches


11 24
the legend

12 Cut lines consistent with adjacent plans 25

13 Notes & Legend correct/ adequate

Review result Signatures


I have checked that the Drawing(s) are acceptable, are of the standard required and my Signed by Checker

comments have been acted upon.


I have reviewed the Drawing(s) which are acceptable, are of the standard required and my Signed by Reviewer

comments have been acted upon.


Acceptable first �me; Minor Deficiency;
The level of rework required before acceptance (Reviewer to circle as appropriate). Serious Deficiency; Major Rework