Professional Documents
Culture Documents
Bridge Inspection PDF
Bridge Inspection PDF
BRIDGE INSPECTION,
MAINTENANCE, AND REPAIR
REPRODUCTION AUTHORIZATION/RESTRICTIONS
A
TECHNICAL MANUAL HEADQUARTERS
No. 5-600 DEPARTMENTS OF THE ARMY
AIR FORCE JOINT PAMPHLET AND THE AIR FORCE
NO. 32-108 WASHINGTON, DC, 6 December 1994
BRIDGE INSPECTION, MAINTENANCE, AND REPAIR
Paragraph Page
CHAPTER 1. INTRODUCTION
Section I. GENERAL INFORMATION
Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-1
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-1
References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1-1
II. MAINTENANCE PLANNING
Programming and economic considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4 1-1
Elements of the maintenance program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-1
III. FREQUENCY OF INSPECTION
Military requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6 1-2
Factors of frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 1-2
IV. QUALIFICATIONS OF INSPECTION PERSONNEL
Army . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8 1-2
Air Force . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9 1-2
2. BRIDGE STRUCTURES
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2-1
Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1
Typical bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 2-1
Box culverts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2-1
Military bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5 2-1
3. BRIDGE ELEMENTS
I. SUBSTRUCTURE ELEMENTS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-1
Abutments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2 3-1
Piers and bents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3 3-1
II. SUPERSTRUCTURES
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 3-1
Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-2
Floor systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6 3-2
Main supporting members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-2
Bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-8
III. MISCELLANEOUS ELEMENTS
Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-12
Pin and hanger supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-12
Expansion joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-12
Approaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-12
Railings, sidewalks, and curbs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 3-14
Deck drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 3-14
Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-14
Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-15
Dolphins and fenders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 3-15
Welds, bolts, and rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18 3-16
4. MECHANICS OF BRIDGES
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1
Bridge forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-1
Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3 4-1
5. BRIDGE CONSTRUCTION MATERIALS
I. CONCRETE
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5-1
Physical and mechanical properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 5-1
Indication and classification of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 5-1
Causes of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-4
Assessment of concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 5-8
i
TM 5-600/AFJPAM 32-1088
Paragraph Page
Section II. STRUCTURAL STEEL
Physical and mechanical properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 5-11
Indicators and classification of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 5-11
Causes of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8 5-12
Assessment of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 5-13
III. TIMBER
Physical and mechanical properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10 5-13
Deterioration: indicators and causes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11 5-14
Assessment of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12 5-16
IV. WROUGHT AND CAST IRON
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-13 5-17
Physical and mechanical properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14 5-17
Deterioration: indicators and causes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-15 5-18
V. STONE MASONRY
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-16 5-18
Physical and mechanical properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-17 5-18
Indicators of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-18 5-18
Causes of deterioration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19 5-18
VI. ALUMINUM
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20 5-18
Deterioration: indicators and causes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21 5-18
VII. FOUNDATION SOILS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22 5-19
Types of movement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23 5-19
Effects on structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-24 5-19
Indicators of movement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-20
Causes of foundation movements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26 5-22
VIII. WATERWAYS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27 5-25
Types of movement and effects on waterways . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28 5-25
CHAPTER 6. BRIDGE REDUNDANCY AND FRACTURE CRITICAL MEMBERS (FCMs)
I. GENERAL
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-1
Fracture critical members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 6-1
Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 6-1
Criticality of FCMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 6-1
II. EXAMPLES
Two-girder system (or single-box girder) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5 6-3
Two-truss system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6 6-4
Cross girders and pier caps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 6-5
Supports and suspended spans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8 6-5
7. INSPECTION CONSIDERATIONS
I. TOOLS AND EQUIPMENT
Basic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7-1
Concrete inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2 7-1
Steel inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3 7-1
Timber inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4 7-1
Cast iron, wrought iron, and aluminum inspection . . . . . . . . . . . . . . . . . . . . . . . . . 7-5 7-1
Special equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6 7-2
II. SAFETY
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7 7-2
Bridge site organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8 7-2
Personal protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9 7-2
Special safety equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-10 7-2
Climbing of high steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-11 7-2
Confined spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-12 7-3
III. DOCUMENTATION OF THE BRIDGE INSPECTION
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-13 7-4
Planning and documenting the inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-14 7-4
Structure evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-15 7-4
IV. INSPECTION PROCEDURE
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-16 7-5
Inspection sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-17 7-5
ii
TM 5-600/AFJPAM 32-1088
Paragraph Page
CHAPTER 8. BRIDGE COMPONENT INSPECTION
Section I. SUBSTRUCTURES
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8-1
Abutments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2 8-1
Retaining walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8-1
Piers and bents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4 8-1
Pile bents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5 8-4
Dolphins and fenders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6 8-4
II. SUPERSTRUCTURES
Concrete beams and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7 8-5
Steel beams and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8 8-6
Pin and hanger connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9 8-8
Floor systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10 8-12
Diaphragms and cross frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11 8-13
Trusses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12 8-13
Lateral bracing portals and sway frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13 8-16
Tied arches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-14 8-16
Metal bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-15 8-17
Elastomeric bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-16 8-18
Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-17 8-18
Expansion joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18 8-20
Railings, sidewalks, and curbs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-19 8-21
Approaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-20 8-22
Bridge drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-21 8-22
III. MISCELLANEOUS INSPECTION ITEMS
Waterways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-22 8-23
Paint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-23 8-24
Signing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-24 8-24
Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-25 8-26
Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-26 8-27
IV. INSPECTION OF RAILROAD BRIDGES
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-27 8-28
Railroad deck types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-28 8-28
Track inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-29 8-28
Deck inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-30 8-28
Superstructure inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-31 8-30
Substructure inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-32 8-31
Recommended practices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-33 8-31
V. BOX CULVERTS
Types of distress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-34 8-31
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-35 8-32
9. FINAL DOCUMENTATION
Annual (Army) and biannual (Air Force) inspection documentation . . . . . . . . . . . 9-1 9-1
Triennial (Army) and every third biannual (Air Force) bridge inspection
documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2 9-1
10. GENERAL PREVENTIVE MAINTENANCE, REPAIR, AND UPGRADE
I. INTRODUCTION
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1 10-1
Preventive maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2 10-1
Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3 10-1
Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4 10-1
Bridge upgrade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-5 10-2
II. COMMON MAINTENANCE TASKS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-6 10-2
Cleaning deck drains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-7 10-2
Ice and snow removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-8 10-2
Bank restoration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-9 10-2
Traffic control items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-10 10-2
Bearings and rollers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-11 10-3
Debris and removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-12 10-3
Bridge joint systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-13 10-3
Scour protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-14 10-4
III. COMMON REPAIR TASKS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-15 104
iii
TM 5-600/AFJPAM 32-1088
Paragraph Page
Abutment stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-16 10-5
Drift and floating ice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-17 10-5
Scour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-18 10-6
Settlement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-19 10-7
Waterway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-20 10-9
Section IV. COMMON METHODS TO UPGRADE EXISTING BRIDGES
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-21 10-9
Shortened span lengths . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-22 10-9
Add stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-23 10-10
Strengthen piers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-24 10-10
Reduce deadload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-25 10-10
Posttensioned bridge components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-26 10-10
Strengthen individual members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-27 10-10
CHAPTER 11. STEEL BRIDGE MAINTENANCE, REPAIR, AND UPGRADE
I. PREVENTIVE MAINTENANCE FOR CORROSION
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1 11-1
Structural steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2 11-1
II. REPAIR AND STRENGTHEN
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3 11-1
Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4 11-3
Repair of structural members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5 11-4
III. MEMBER REPLACEMENT
Tension members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6 11-10
Compression members/columns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-7 11-10
Beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8 11-10
IV. UPGRADE STEEL BRIDGES
Creation of a composite action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-9 11-11
Posttensioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10 11-11
Truss systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-11 11-12
12. TIMBER BRIDGE MAINTENANCE, REPAIR, AND UPGRADE
I. PREVENTIVE MAINTENANCE
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1 12-1
Fire protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2 12-3
II. REPAIR AND STRENGTHEN TIMBER MEMBERS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3 12-3
Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4 12-3
Repair of graded lumber . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5 12-4
Repair of piles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-6 12-5
Repair of posts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7 12-7
Repair of sway bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8 12-7
III. MEMBER REPLACEMENT
Replacement of tension timber components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9 12-8
Replacement of compression timber components . . . . . . . . . . . . . . . . . . . . . . . . . . 12-10 12-8
Replacement of flexural timber components (stringers) . . . . . . . . . . . . . . . . . . . . . 12-11 12-9
Replacement of timber decking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-12 12-10
IV. TIMBER BRIDGE UPGRADE
Strengthen intermediate supports (piers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13 12-11
Shorten span length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-14 12-11
Posttensioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-15 12-12
Add stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-16 12-12
Strengthen individual members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-17 12-13
iv
TM 5-600/AFJPAM 32-1088
Paragraph Page
Columns and piles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-11 13-10
Stringers and beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-12 13-11
Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13 13-11
Replacement of concrete members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-14 13-15
Section III. UPGRADE CONCRETE BRIDGES
General upgrade methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-15 13-15
Strengthen individual members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-16 13-16
Prestressed concrete members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-17 13-18
APPENDIX A. REFERENCES AND BIBLIOGRAPHY A-1
B. SUGGESTED ITEMS FOR ARMY ANNUAL AND AIR FORCE BIANNUAL BRIDGE
INSPECTIONS B-1
C. SUGGESTED ITEMS FOR ARMY TRIENNIAL AND EVERY THIRD AIR FORCE BIANNUAL
BRIDGE INSPECTIONS C-1
List of Figures
Figure 2-1. Structural framing system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
2-2. Truss bridges: steel or timber construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2-3. Steel bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2-4. Reinforced concrete bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2-5. Timber bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2-6. Bailey bridge using bailey panel piers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2-7. Double-double bailey bridge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2-8. T6 aluminum fixed bridge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2-9. Class 50 M-4 trestle bridge, aluminum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
2-10. Timber trestle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
3-1. Bridge nomenclature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
3-2. Typical abutments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3
3-3. Typical piers and bents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
3-4. Typical superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5
3-5. Typical floor systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7
3-6. Rolled steel beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8
3-7. Plate girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9
3-8. Truss components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9
3-9. Bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12
3-10. Metal bearing types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13
3-11. Metal bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13
3-12. Elastomeric bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14
3-13. Bearing support for a suspended span . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14
3-14. Pin and hanger connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15
3-15. Free pin and hanger connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16
3-16. Fixed pin and hanger connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17
3-17. Expansion joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17
3-18. Timber pile cluster dolphins and timber fenders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18
3-19. Timber bent fenders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18
3-20. Basic weld types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18
4-1. Dead load on simple span . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-2. Live load on simple span . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-3. Earth pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-4. Bouyancy on pier . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-5. Lateral wind load (end view) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-6. Longitudinal force due to friction and live load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-7. Forces due to temperature rise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-8. Earthquake forces (may be in any direction) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-9. Ice pressure and stream flow against pier . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-10. Forces on a member . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-11. Axial forces and stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-12. Truss vertical in tension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-13. Compression . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-14. Shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-15. Shear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-16. Bending stress in a beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
4-17. Simple beam bending moment and shear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
5-1. Pattern or map cracking on a pier . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
v
TM 5-600/AFJPAM 32-1088
Page
Figure 5-2. D-Cracking on a deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5-3. Nomenclature for individual cracks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5-4. Light scale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5-5. Medium scale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5-6. Heavy scale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5-7. Small spall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5-8. Large spall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5-9. Popouts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5-10. Spall due to reinforcement corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5-11. Joint spall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5-12. Rust stained crack in steel girder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12
5-13. Buckled flange due to collision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12
5-14. Advanced wood decay in crosstie . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14
5-15. Advanced wood decay in bent cap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-15
5-16. Slight and advanced wear on a timber deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-16
5-17. Buckled timber pile due to overload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-16
5-18. Longitudinal cracks in timber beam due to overload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-17
5-19. Differential settlement under an abutment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20
5-20. Differential settlement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20
5-21. Differential pier movement causing superstructure movement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21
5-22. Movement due to scour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21
5-23. Abutment failure from scour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22
5-24. Causes of foundation movement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23
5-25. Embankment erosion due to improper drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-24
5-26. Typical flow characteristics through a bridge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25
5-27. General scour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26
5-28. Localized scour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26
5-29. Sediment deposits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26
5-30. Pier scour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26
5-31. Loose riprap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26
5-32. Lined banks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-26
5-33. Channel constrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27
5-34. Flooding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27
5-35. Protruding abutments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27
5-36. Debris problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27
5-37. Bridge in a river bend . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27
5-38. Concrete slope protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28
5-39. Riprap slope protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-29
5-40. Channel change . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-29
5-41. Material removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-29
5-42. Obstruction removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-30
6-1. Nonload path redundant bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
6-2. Load path redundant bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
6-3. Examples of details in table 6-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3
6-4. Portions of a girder in tension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6-5. Steel cross girder on concrete piers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
8-1. Abutment checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2
8-2. Concrete pier and bent checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2
8-3. Pier cap disintegration due to roadway drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2
8-4. Steel rocker bent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3
8-5. Timber bent checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8-6. Deteriorated timber dolphins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5
8-7. Concrete beam checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5
8-8. Shiplapped cantilever joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6
8-9. Steel girder checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7
8-10. Floorbeam connection plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8
8-11. Cracks in ends of cover plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
8-12. Intermittent welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
8-13. Insert plates in haunched girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
8-14. Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
8-15. Intersecting welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11
8-16. Flange and web attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11
8-17. Copes and reentrant corners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12
8-18. Boxbeam to column connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12
8-19. Cracks near shear studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12
vi
TM 5-600/AFJPAM 32-1088
Page
Figure 8-20. Steel floorbeam checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13
8-21. Clip angle stringer connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13
8-22. Diaphragm checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13
8-23. Lower chord of a riveted truss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-14
8-24. Broken eyebar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-15
8-25. Worn counters due to rubbing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-16
8-26. Metal bearing checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-17
8-27. Elastomeric pad checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18
8-28. Efflorescence on the underside of a concrete deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-19
8-29. Rusted stay-in-place forms underneath a concrete deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-19
8-30. Expansion joint checklist items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-20
8-31. Unprotected parapet end of a bridge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-21
8-32. Debris accumulation on bridge deck indicating drainage problems . . . . . . . . . . . . . . . . . . . . . . . . . 8-23
8-33. Typical military load-class signs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-24
8-34. Typical telltale indicating overhead clearance of bridge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-25
8-35. Appropriate markings for clearance on civilian bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-26
8-36. Examples of good and defective cross-ties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-29
8-37. Required tie support at track joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-30
10-1. Examples of closed joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4
10-2. Abutment held in place with a deadman . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-5
10-3. Typical use of dolphins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-6
10-4. Forming a footing with a tremie encasement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-7
10-5. Alternate methods for confining grout under footings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-7
10-6. Use of crushed or structural fill to repair scour damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-8
10-7. Repair of scour around concrete abutments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-8
10-8. Bank repair using riprap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-8
10-9. Concrete bank protector extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-8
10-10. Settlement repair of a concrete wall pier . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-9
10-11. Expedient methods of span length reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-10
11-1. Anodes placed on steel H piles for corrosion protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2
11-2. Local buckling under compression . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3
11-3. Repairing tie rods with splices or turnbuckles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4
11-4. Strengthening pin connections using a supplementary eye . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5
11-5. Use of cover plates on rolled steel sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-7
11-6. Iowa DOT method of adding angles to steel 1-beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-7
11-7. Integral pile jacket for steel piles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8
11-8. Details of double-nutted bolt shear connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11-9. Method for relieving stress in tension members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11-10. Replacement of a steel beam in a composite section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-11
11-11. Precast deck with holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-11
11-12. Design of posttensioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-12
11-13. Adding supplementary members to a truss frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-13
11-14. Arch superposition scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-13
11-15. Reinforcing a pony truss with Bailey trusses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-13
12-1. Protective covers for timber members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2
12-2. Flexible PVC barrier installed on a timber pile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2
12-3. Common deck connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4
12-4. Repair of cracked or split stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5
12-5. Timber cap scabs provide additional bearing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5
12-6. Stringer splice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-6
12-7. Timber pile repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7
12-8. Concrete jacket supporting a timber pile splice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7
12-9. Shimming timber piles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8
12-10. Fender pile repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8
12-11. Jacking methods for timber cap replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9
12-12. Pile replacement methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9
12-13. Below-deck timber stringer replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-10
12-14. Splicing in a wheel curb . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-11
12-15. Diagrams of an intermediate helper bent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-12
12-16. Timber beam strengthened using king post posttensioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-12
12-17. Steel cover plates used to reinforce a timber beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13
13-1. Cathodic protection for reinforced concrete piles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2
13-2. Reinforcing bars inserted 90 degrees to the crack plane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-3
13-3. Crack repair by drilling and plugging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4
13-4. Epoxy injection used to seal cracks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4
vii
TM 5-600/AFJPAM 32-1088
Page
Figure 13-5. Flexible seals used in concrete crack repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5
13-6. Conventional procedure for sealing dormant cracks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5
13-7. Reinforcement of a crack using stitching . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6
13-8. Expansion joint repair with elastomeric seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7
13-9. Placing an elastomeric seal in an asphalt overlay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8
13-10. Expansion dam repairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-9
13-11. Repair of abutment and wingwall faces using a jacket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-9
13-12. Repair of broken or deteriorated wingwalls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-10
13-13. Typical repair of concrete bridge seats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-11
13-14. Concrete cap extension to increase bearing surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-12
13-15. Typical beam saddle design using standard steel W-sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-12
13-16. Standard concrete pile jacket with steel reinforcing cage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13
13-17. External prestressing strands used to close a crack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13
13-18. Closing a crack in a deck using prestressing steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-15
13-19. Jacketing of concrete columns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-16
13-20. External shear reinforcement for concrete beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-16
13-21. Reinforcing boxbeams for shear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-17
13-22. Web reinforcement of boxbeams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-17
13-23. Steel channel used to reinforce beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-17
13-24. Concrete beams reinforced with concrete sleeves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-18
List of Tables
Table 5-1. Relation of symptoms to causes of distress and deterioration of concrete . . . . . . . . . . . . . . . . . . . . . 5-6
5-2. Test methods for concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9
6-1. Classification of types of details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
8-1. Expansion joint data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-20
8-2. Minimum overhead clearances for bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-25
8-3. Minimum lane widths for bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-26
8-4. Operating restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-30
10-1. Chemical application rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3
10-2. Lightweight decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-11
10-3. Bridge posttensioning configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-12
11-1. Built-up members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-9
13-1. Elastomeric seal size guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7
13-2. Bridge deck restoration procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-14
viii
TM 5-600/AFJPAM 32-l088
CHAPTER 1
INTRODUCTION
1-4. Programming and economic consider- (1) Operator inspection consists of examina-
ations tion, lubrication, and minor adjustment performed
In maintenance planning and execution, full con- by operators on a continuous basis.
sideration must be given to future expected use of (2) Preventative maintenance inspection is the
each bridge, the life expectancy of the bridge, and scheduled examination and minor repair of facil-
the life-cycle cost of periodic repairs versus re- ities and systems that would otherwise not be
placement of a bridge or its major components. subject to inspection. Pier fender systems, fire
The level of maintenance and programming of protection systems, and under pier utilities are
major repairs should be planned in consonance examples.
with future requirement for the bridge and/or (3) Control inspection is the major scheduled
planned replacement. The maintenance program examination of all components and systems on a
should be designed to include prevention of deteri- periodic basis to determine and document the
oration and damage, prompt detection of deficien- condition of the bridge and to generate major work
cies, and early accomplishment of maintenance required.
and repairs to prevent interruptions of operations b. Maintenance. Maintenance is the recurrent
or limitation/restriction of bridge use. day-to-day, periodic, or scheduled work that is
required to preserve or restore a bridge to such a
1-5. Elements of the maintenance program condition that it can be effectively utilized for its
a. Inspection. Continuous, rigorous inspections designed purpose. It includes work undertaken to
are necessary for an effective maintenance pro- prevent damage to or deterioration of a bridge that
gram. It is recommended that inspections be made otherwise would be costly to restore. Several levels
annually of all basic structures and more fre- of bridge maintenance are practiced, depending on
quently for fenders and utilities. Additional in- the complexity and frequency of the tasks in-
spections may be necessary under certain circum- volved. These tasks range from the clearing of
stances, such as a tsunami, high tides, earth- drainpipes to the replacement of bearings. Minor
quakes, accidents, typhoons, and heavy freezes. maintenance consists of cleaning the drainage
Inspections may be made from the structures, from system, patch painting, removing debris, tighten-
a boat or float, or below the waterline by divers. ing loose bolts, and cleaning the joints.
Underwater television is often employed in visual (1) Routine maintenance includes adjusting
inspections. Types of inspections typical to bridges bearings, complete repainting, repairing potholes,
are: filling cracks, and sealing concrete.
1-1
TM 5-600/AFJPAM 32-l088
(2) Major maintenance approaches rehabilita- replacement of joints; fatigue crack repair; water-
tion in that it might include the replacement of way adjustment; and other specialized activities
bearings; readjustment of forces, such as in cables; not performed very often.
l-2
TM 5-600/AFJPAM 32-1088
CHAPTER 2
BRIDGE STRUCTURES
day-to-day usage under civilian and military traf- the inspection, maintenance, and repair of these
tic. However, due to economic constraints, some of bridges must also be addressed. Several types of
these bridges are serving as “permanent” struc- military bridges are shown in figures 2-6 through
tures on some military installations. Therefore, 2-10.
2-2
TM 5-600/AFJPAM 32-1088
c. Cantilever-suspended spans.
Figure 2-1. Structural framing system.
2-3
TM 5-600/AFJPAM 32-1088
CANTILEVER
Figure 2-2. Truss bridges: steel or timber construction.
2-4
TM 5-600/AFJPAM 32-1088
STEEL VIADUCT
THROUGH-ARCH TRUSS
RIGID FRAME-STEEL
RIGID FRAME
(STEEL GIRDER ELEMENT)
2-5
TM 5-600/AFJPAM 32-1088
CONTINUOUS GIRDER
SPANDREL-FILLED ARCH
OPEN SPANDREL ARCH
RIGID FRAME-CONCRETE
SLAB SECTION
T-BEAM SECTION
ROADWAY SECTION
BOX GIRDER
Figure 2-4. Reinforced concrete bridges.
2-6
TM 5-600/AFJPAM 32-1088
TIMBER TRESTLE
2-7
TM 5-600/AFJPAM 32-1088
2-8
TM 5-600/AFJPAM 32-1088
2-9
TM 5-600/AFJPAM 32-1088
2-10
TM 5-600/AFJPAM 32-1088
2-11
TM 5-600/AFJPAM 32-1088
CHAPTER 3
BRIDGE ELEMENTS
ABBREVIATIONS
CDF CREOSOTED DOUGLAS FIR (PRESSURE TREATED) RC REINFORCED CONCRETE VC VERTICAL CLEARANCE
HWM HIGH WATER MARK BTF BRUSHED TREATED FIR (WOOD PRESERVATIVE)
3-2
TM 5-600/AFJPAM 32-1081
(2) Cover plates. These are welded or riveted points of concentrated loads or for deep girder to
to the top and/or bottom flanges of the girder to prevent web crippling and buckling.
increase the load carrying capacity. c. Concrete beams. These beams are usually
(3) Bearing stiffeners. These are plates or an- reinforced wherein the tensile stresses, whether
gles placed vertically at the locations of the sup- resulting from bending, shear, or combinations
port and attached to the web. Their primary thereof produced by live and dead loadings, are by
function is to transmit the shearing stresses in the design carried by the metal reinforcement. The
web plate to the bearing device and, by so doing, concrete takes compression (and some shear) only.
prevent web crippling and buckling. It is commonly rectangular or tee-shaped with its
(4) Intermediate stiffeners. These are used at depth dimension greater than its stem width.
3-3
TM 5-600/AFJPAM 32-1088
d. Trusses. The truss is one form of structural are common to all. Truss members may be built-
system which, because of its characteristics, pro- up sections, rolled sections, tubing, pipe, eye-
vides high load-carrying capacities and can be bars, or solid rods. An earlier commonly used
used to span greater lengths than rolled beams construction practice was to connect channels by
and girders. The truss functions basically in the lacing bars and stay plates at the ends. Interior
same manner as a rolled beam or girder in verticals and diagonals on old bridges may consist
resisting loads, with the top and bottom chords of relatively slender solid rods when the member
acting as the flange and the beam and the diago- is subject only to tension. When two opposing
nal members acting as the web. While most tension diagonals are provided in the panel of a
trusses are of steel, timber trusses also exist. truss, they are termed “counters.” The basic parts
Truss members may be connected with rivets, of a truss are summarized in figures 3-1, 3-4
bolts, or pins. Although the configuration of (sheet 1, part b) and 3-8. They are discussed as
trusses varies widely, the essential components follows:
3-4
TM 5-600/AFJPAM 32-1088
B. TRUSS
3-5
TM 5-600/AFJPAM 32-1088
c. GIRDER BRIDGE
(1) Chord. In a truss, the upper and the lower and will resist tension or compression, depend-
longitudinal members extending the full span ing on the truss configuration. Most diagonals are
length are called chords. The upper portion is also main structural members and their failure
designated as the upper or top chord and corre- would be extremely critical and render the truss
spondingly lower portion is designated as the unsafe.
lower or bottom chord. For simple span, the top (3) Verticals. Vertical web members span
chord will always be in compression, and the between top and bottom chords, which will re-
bottom chord will always be in tension and should sist tension or compression stresses depending
be considered a main structural member. Failure upon the truss configuration. Most verticals are
of either chord will render the truss unsafe. a main structural member, and their failure
(2) Diagonals. The diagonal web members would usually be critical and render the truss
span between successive top and bottom chords unsafe.
3-6
TM 50-600/AFJPAM 32-1088
3-7
TM 5-600/AFJPAM 32-1088
a. CROSS SECTIONS
3-9
TM 5-600/AFJPAM 32-1088
3-10
TM 5-600/AFJPAM 32-1088
3-11
TM 5-600/AFJPAM 32-1088
3-12
TM 5-600/AFJPAM 32-1081
3-13
TM 5-600/AFJPAM 32-1088
facilities installation and most of the required (2) Steel tubes. Steel tube dolphins are com-
maintenance. While the large commercial enter- posed of one or more steel tubes driven into the
prises, e.g., gas, light, and telephone companies, harbor bottom and connected at the top with
will usually perform the scheduled maintenance of bracing and fendering systems.
their facilities, some of the smaller publicly owned (3) Caissons. These are sand-filled, sheet-pile
utilities, e.g., water companies, are less likely to cylinders of large diameter. The top is covered by
perform adequate maintenance since they may not a concrete slab, and fendering is attached to the
be as well staffed. Most utility lines or pipes are outside of the sheets.
suspended from bridges between the beams or be- b. Fenders.
hind the fascia. On older bridges, water pipes and (1) Timber bents. A series of timber piles with
sewer pipes may be installed along the sides of the timber walers and braces attached to the tops are
bridge or may be suspended under the bridge. still used (figure 3-19). Steel piles are sometimes
used in lieu of timber.
3-16. Lighting
(2) Cofferdams. On large bridges with wide
Lighting on bridges will consist of “whiteway” footings, the cofferdam sheets left in place and
lighting, sign lights, traffic control lights, naviga- braced by a concrete wall act as pier protection. A
tion lights, and aerial obstruction lights. The last grid or grillage of timber or other resilient mate-
two types of lights are special categories which are rial on the outside of the sheets forms a collision
encountered only on bridges over navigable water- mat.
ways or on bridges having high towers. There will, (3) Steel pile fenders. Steel piles driven in
of course, be many bridges with no lighting at all. pairs to form a frame, with a concrete slab tying
the piles together, make a good fender. Timber
3-17. Dolphins and fenders grillages are attached to the outside to absorb
Dolphins and fenders around bridges protect the collision impact.
structure against collision by maneuvering vessels. (4) Steel or concrete frames. Steel or concrete
The fender system absorbs the energy of physical frames are sometimes cantilevered from the pier
contact with the vessel. The various types of and faced with a timber or rubber cushioning to
dolphins and fenders are as follows: reduce collision impact.
a. Dolphins. (5) Timber grids. Timber grids, consisting of
(1) Timber pile clusters. This type of dolphin is posts and walers, are attached directly to the pier
widely used and consists of a cluster of timber (figure 3-18).
piles driven into the harbor bottom with the tops (6) Floating fenders. Floating frameworks
pulled together and wrapped tightly with wire which partly or completely surround the pier are
rope (figure 3-18). sometimes used as fenders. The main frames are
3-15
TM 5-600/AFJPAM 32-1088
DETAILS
EXPLODED VIEW
Figure 3-15. Free pin and hanger connection.
usually made of steel or concrete with timber continuous and almost homogeneous joint. The two
cushioning on the outside face. basic types of welds are shown in figure 3-20.
(7) Butyl rubber fenders. Butyl rubber may be b. Bolts. The A325 high-strength bolt has be-
used as a fendering system. come the primary field fastener of structural steel.
Specifications usually call for a heavy hexagon
3-18. Welds, bolts, and rivets
structural bolt, a heavy semifinished hexagon nut,
a. Welds. Welding is a method of joining two and one or two washers. Bevel washers may be
metals together by melting metal at the joints and required.
fusing it with an additional metal from a welding c. Rivets. Rivets are sometimes used instead of
rod. When cool, weld metal and base metal form a bolts, especially in older structures.
3-16
Figure 3-16. Fixed pin and hanger connection.
3-17
TM 5-600/AFJPAM 32-1088
3-18
TM 5-600/AFJPAM 32-1088
CHAPTER 4
MECHANICS OF BRIDGES
BOX CULVERT
RETAINING WALL
4-2
TM 5-600/AFJPAM 32-1088
4-3
TM 5-600/AFJPAM 32-1088
4-4
TM 5-600/AFJPAM 32-1088
CHAPTER 5
Section I. CONCRETE
5-3
TM 5-600/AFJPAM 32-1088
5-4
TM 5-600/AFJPAM 32-1088
5-5
TM 5-600/AFJPAM 32-1088
Other possible sources for acid formation are sew- cracking, and spalling may be seen. If the nature
age, some peat soils, and some mountain water of the solution in which the deteriorated concrete
streams. Visual examination will show disintegra- is located is unknown, laboratory analysis can be
tion of the concrete leading to the loss of cement used to identify the specific acid involved.
paste and aggregate from the matrix. If reinforc- (2) Alkali-carbonate rock reaction. Certain ag-
ing steel is reached by the acid, rust staining, gregates of carbonate rock have been reactive in
5-6
TM 5-600/AFJPAM 32-1088
concrete. The results of these reactions have been dation of concrete may result in a variety of
both beneficial and destructive. Visual examina- defects, the most common being bugholes, honey-
tion of those reactions that are serious enough to combing, and cold joints. These defects make it
disrupt the concrete in a structure will generally much easier for any damage-causing mechanism to
show map or pattern cracking and a general initiate deterioration of the concrete.
appearance which indicates swelling of the con- (3) Improper curing. Unless concrete is given
crete. This reaction is distinguished from that of adequate time to cure at a proper humidity and
the alkali-silica reaction by the lack of silica gel temperature, it will not develop the characteristics
exudations at cracks. Petrographic examination that are expected and that are necessary to pro-
may be used to confirm the presence of alkali- vide durability. Symptoms of improperly cured
carbonate rock reaction. concrete can include various types of cracking and
(3) Alkali-silica reaction. Some aggregates con- surface disintegration. In extreme cases where
taining silica that is soluble in highly alkaline poor curing leads to failure to achieve antici-
solutions may react to form expansive products pated concrete strengths, structural cracking may
which will disrupt the concrete. This reaction is occur.
indicated by map or pattern cracking and a gen- (4) Improper location of reinforcing steel. This
eral appearance of swelling of the concrete. Petro- section refers to reinforcing steel that is either
graphic examination may be used to confirm the improperly located or is not adequately secured in
presence of this reaction. the proper location. Either of these faults may lead
(4) Miscellaneous chemical attack. Concrete to two general types of problems. First, the steel
will resist chemical attack to varying degrees may not function structurally as intended result-
depending upon the exact nature of the chemical. ing in structural cracking or failure. The second
Concrete which has been subjected to chemical type of problem stemming from improperly located
attack will usually show surface disintegration or tied steel is one of durability. The tendency
and spalling and the opening of joints and cracks. seems to be for the steel to end up close to the
There may also be swelling and general disrup- surface of the concrete. As the concrete cover over
tion of the concrete mass. Aggregate particles may the steel is reduced, it is much easier for corrosion
be seen protruding from the remaining concrete to begin.
mass. d. Corrosion of embedded metals. Under most
(5) Sulfate attack. Naturally occurring sulfates circumstances, Portland-cement concrete provides
of sodium, potassium, calcium, or magnesium are good protection to the embedded reinforcing steel.
sometimes found in soil or in solution in ground This protection is generally attributed to the high
water adjacent to concrete structures. The reac- alkalinity of the concrete adjacent to the steel and
tions involving these sulfates result in an increase to the relatively high electrical resistivity of the
in volume of the concrete. Visual inspection will concrete. However, this corrosion resistance will
show map and pattern cracking as well as a generally be reduced over a long period of time by
general disintegration of the concrete. Laboratory carbonation, and the steel will begin to corrode.
analysis can verify the occurrence of the reactions Deicing salts are the most common cause of the
described. corrosion. Corrosion of the steel will cause two
c. Construction errors. Failure to follow specified things to occur. First, the cross-sectional capacity
procedures and good practice or outright careless- of the reinforcement is reduced which in turn
ness may lead to a number of conditions that may reduces the load-carrying capacity of the steel.
be grouped together as construction errors. Typi- Second, the products of the corrosion expand since
cally, most of these errors do not lead directly to they occupy about eight times the volume of the
failure or deterioration of concrete. Instead, they original material. This leads to cracking and ulti-
enhance the adverse impacts of other mechanisms mately spalling of the concrete. For mild steel
identified in this chapter. The following are some reinforcing, the damage to the concrete will be-
of the most common construction errors: come evident long before the capacity of the steel
(1) Addition of water to concrete. The addition is reduced enough to affect its load-carrying capac-
of water while in the delivery truck will often lead ity. However, for prestressing steel slight reduc-
to concrete with reduced strength and durability. tions in section can lead to catastrophic failure.
The addition of water while finishing a slab will Visual examination will typically reveal rust
cause crazing and dusting of the concrete in staining of the concrete. This staining will be
service. followed by cracking. Cracks produced by corrosion
(2) Improper consolidation. Improper consoli- usually run in straight, parallel lines at uniform
5-7
TM 5-600/AFJPAM 32-1088
intervals corresponding to the spacing of the rein- g. Freezing and thawing. The cyclic freezing and
forcement. As deterioration continues, spalling of thawing of critically saturated concrete will cause
the concrete over the reinforcing steel will occur its deterioration. Deicing chemicals may also accel-
with the reinforcing bars becoming visible. A erate the damage and lead to pitting and scaling.
laboratory analysis may be beneficial to determine This damage ranges from surface scaling to exten-
the chloride contents in the concrete throughout sive disintegration. Laboratory examination of con-
its depth. This procedure may be used to deter- crete cores with this damage will often show a
mine the amount of concrete to be removed during series of cracks parallel to the surface of the
a rehabilitation project. structure.
e. Design errors. Design errors generally result h. Foundation movement. These movements will
from inadequate structural design or from lack of cause serious cracking in structures. Further dis-
attention to relatively minor design details: cussion of this problem is provided in section VII
(1) Inadequate structural design. This will of this chapter.
cause cracking and/or spalling in areas which are i. Shrinkage. Shrinkage is caused by the loss of
subject to the highest stresses. To identify this as moisture from concrete. It may be divided into two
a source of damage, the locations of the damage categories: that which occurs before setting (plastic
should be compared to the types of stresses that shrinkage) and that which occurs after setting
should be present in the concrete. A detailed (drying shrinkage). Cracking due to plastic shrink-
structural analysis may be required, and thus a age will be seen within a few hours of concrete
qualified structural engineer should be consulted if placement. The cracks are generally wide and
this problem is apparent. shallow and isolated rather than patterned. Cracks
(2) Poor design details. Poor detailing may
due to drying shrinkage are characterized by their
result in localized concentrations of high stresses
fineness and absence of any indication of move-
in otherwise satisfactory concrete. The following
ment. They are usually shallow, a few inches in
are some of the more design detail problems:
depth, and in an orthogonal or blocky pattern.
(a) Abrupt changes in section. This may
cause stress concentrations that may result in j. Temperature changes. Changes in tempera-
cracking. Typical examples would include the use ture cause a corresponding change in volume of
of relatively thin bridge decks rigidly tied into the concrete, and when sufficiently restrained
massive abutments or patches and replacement against expansion or contraction cracking will
concrete that are not uniform in plan dimensions. occur. Temperature changes will generally result
(b) Reentrant corners and openings. These from the heat of hydration of cement in large
locations are subject to stress concentrations, and concrete placements, variations in climatic condi-
when insufficiently reinforced, cracking may occur. tions, or fire damage.
(c) Inadequate drainage. This will cause
ponding of water, which may result in excessive 5-5. Assessment of concrete
loading or, more likely, leakage or saturation of Assessment of existing reinforced concrete in
concrete. Concrete subject to freeze-thaw cycles is bridges is basically associated with fully identify-
especially vulnerable to this type of damage. ing the cause and extent of observed or suspected
(d) Insufficient travel in expansion joints. deterioration. The method of description of dam-
Inadequately designed expansion joints may result aged concrete and the possible causes for deteriora-
in spalling of concrete adjacent to the joints. tion were discussed in paragraph 5-5. This section
(e) Rigid joints between precast units. De- will provide guidance concerning the available test
signs utilizing precast elements must provide for methods for determining the causes of the deterio-
movement between adjacent precast elements or ration and quantifying its extent. The range of
between the precast elements and the supporting available test methods is large and includes in situ
frame. Failure to provide for this movement can nondestructive tests upon the actual structure as
result in cracking or spalling. well as physical, chemical, and petrographic tests
f. Wear and abrasion. Traffic abrasion and im- upon samples removed from the structure, and
pact cause wearing of bridge decks; while curbs, load testing. Table 5-2 summarizes basic charac-
parapets, and piers are damaged by the scraping teristics of the most widely established test meth-
action of such vehicles as snow plows and sweep- ods classified according to the features which may
ers. Deck wear also appears as cracking and be assessed most reliably in each case. An over-
ravelling at joint edges. view of some of the more common tests follows.
5-8
TM 5-600/AFJPAM 32-1088
Additional references should be consulted prior to in short broken pieces. When drilling in poor-
actual usage of these tests. quality concrete with any size core barrel, the
a. Core drilling. Core drilling to recover con- material will generally come out as rubble. When
crete for laboratory analysis or testing is the best drill hole coring is not practical or core recovery is
method of obtaining information on the condition poor, a viewing system such as a borehole camera,
of concrete within a structure. However, since core borehole television, or borehole televiewer may be
drilling is expensive and destructive, it should be used for evaluating the interior concrete condi-
considered only when sampling and testing of tions. In addition, some chemical tests may be
interior concrete is deemed necessary. The core performed on smaller drilled powdered samples
samples should be sufficient in number and size to from the structure, thus causing substantially less
permit appropriate laboratory examination and damage than that produced by coring, but the
testing. For compressive strength, static or dy- likelihood of sample contamination is increased
namic modulus of elasticity, the diameter of the and precision may be reduced.
core should not be less than three times the b. Laboratory investigations. Once samples of
nominal maximum size of aggregate. Warning concrete have been obtained, whether by coring,
should be given against taking NX size (2 1/8-inch drilling, or other means, they should be examined
diameter) cores in concrete containing 2- to 6-inch in a qualified laboratory. In general, the examina-
maximum size aggregate. Due to the large aggre- tion will include one or more of the following
gate size, these cores will generally be recovered examinations:
5-9
TM 5-600/AFJPAM 32-1088
(1) Petrographic examination. This type of ex- reliable prediction of the strength of concrete. The
amination may include visual and microscopic measurements can be affected by: smoothness of
inspection, x-ray diffraction analysis, differential the concrete surface; moisture content of the con-
thermal analysis, x-ray emission techniques, and crete; type of coarse aggregate; size, shape, and
thin section analysis. These techniques may be rigidity of the specimen; and carbonation of the
expected to provide information on the following: concrete surface.
(2) Penetration resistance (probe). This test is
aggregate condition; pronounced cement-aggregate
also used for a quick assessment of quality and
reactions; deterioration of aggregate particles in
uniformity of concrete. The apparatus most often
place; denseness of cement paste; homogeneity of used for penetration resistance is the Windsor
the concrete; depth and extent of carbonation; Probe, a special gun which uses a 32-caliber blank
occurrence and distribution of fractures; character- with a precise quantity of powder to fire a high-
istics and distribution of voids; and presence of strength steel probe into the concrete. The depth
contaminating substances. of penetration of the probe into the concrete can
(2) Chemical analysis. Chemical analyses of then be related by calibration curves to concrete
hardened concrete or of selected portions (paste, compressive strength. A probe will penetrate
mortar, aggregate, reaction products, etc.) may be deeper as the density, subsurface hardness, and
used to estimate the cement content, original strength of the concrete decrease. It should not be
water-cement ratio, and the presence and amount considered for use as a precise measurement of
of chloride and other admixtures. The chloride concrete strength. However, useful estimates of
analysis is the most common of these analyses. It the compressive strength may be obtained if the
is used to provide a quantitative measure of probe is properly calibrated. This test does damage
chloride ion contamination and, thus, the potential the concrete, leaving a hole of about 0.32 inches in
for active steel corrosion at various levels in the diameter for the depth of the probe, and may cause
concrete deck. Samples for this test are usually minor cracking and some surface spalling. Minor
taken by a rotary hammer drill. The “threshold” repairs of exposed surfaces may be necessary.
chloride content, or amount of chloride needed to (3) Ultrasonic pulse velocity. This method in-
initiate corrosion, is approximately 2.0 pounds of volves the measurement of the time of travel of
chloride content per cubic yard of concrete. electronically pulsed compressional waves through
(3) Physical analysis. The following physical a known distance in concrete. These velocities can
and mechanical tests are generally performed on be used to assess the general condition and quality
concrete cores: density, compressive strength, mod- of concrete, to assess the extent and severity of
ulus of elasticity, Poisson’s ratio, pulse velocity, cracks in concrete, and to delineate areas of
and volume change potential by freezing and deteriorated or poor-quality concrete. Good-quality,
thawing. continuous concrete will normally produce high
c. Nondestructive testing (NDT). The purpose of velocities accompanied by good signal strengths.
NDT is to determine the various properties of Poor-quality or deteriorated concrete will usually
concrete such as strength, modulus of elasticity, decrease velocity and signal strength. Concrete of
homogeneity, and integrity, as well as conditions otherwise good quality, but containing cracks, may
of strain and stress, without damaging the struc- produce high or low velocities, depending upon the
ture. Some of the most commonly used tests are nature and number of cracks, but will almost
discussed: always diminish signal strength. This method does
(1) Rebound number (hammer). Rebound num- not provide a precise estimate of concrete strength.
bers may be used to estimate the uniformity and Moisture variations and the presence of reinforc-
quality of in situ concrete. The rebound number is ing steel can affect the results. Skilled personnel
obtained by the use of a special “hammer” that are required in the analysis of the results.
consists of a steel mass and a tension spring in a (4) Surface tapping (chain drag). Experience
tubular frame. The measured rebound number can has shown that the human ear, used in conjunc-
be related to calibration curves which will give an tion with surface tapping, is the most efficient and
indication of the in situ concrete strength. The economical method of determining major delami-
rebound number increases with the strength of the nation in bridge decks. Chain dragging is the most
concrete. This method is inexpensive and allows commonly used method for this purpose. This is,
for a large number of measurements to be rapidly however, a very subjective test in that the opera-
taken so that large exposed areas of concrete can tor must be able to differentiate between sound
be mapped within a few hours. It is, however, a and unsound regions, and the results cannot be
rather imprecise test and does not provide a easily quantified.
5-10
TM 5-600/AFJPAM 32-1088
d. Steel corrosion assessment. The most com- e. Load tests. Occasionally it may be necessary
monly used test for assessing the current state of to examine the overall behavior of an entire bridge
reinforcing steel corrosion is the half-cell potential structure or section of a bridge. This may be
test. This test involves measurement of the electri- achieved electronically by measuring the response
cal potential of an embedded reinforcing bar rela- to dynamic loading with the aid of appropriately
tive to a reference half-cell placed on the concrete positioned accelerometers or alternatively monitor-
ing the performance under static test loads. The
surface. Potential differences more negative than
most common method however, is to measure
- 0.35 volts indicates a high degree of probability strains and deflections (with precise leveling or
of active corrosion of the reinforcing steel. Poten- lasers) produced from static full-scale test loads.
tial readings of - 0.20 volts and lower indicate the These tests are generally expensive but yield
probability of inactive or no corrosion, while read- valuable information as to the overall “health” of
ings between -0.20 and -0.35 volts indicate the a structure. This type of test can be conducted on
possibility of active corrosion. any type of bridge, regardless of the material type.
5-6. Physical and mechanical properties (1) Light. A light, loose rust formation pitting
a. Strength. Steel possesses tremendous com- the paint surface.
pressive and tensile strength and is highly resis- (2) Moderate. A looser rust formation scales or
tant to shear forces. Thin steel sections, however, flakes forming. Definite areas of rust are discern-
are vulnerable to compressive buckling. ible.
b. Ductility. Both the low-carbon and low-alloy (3) Severe. A heavy, stratified rust or rust
steels normally used in bridge construction are scale with pitting of the metal surface. This rust
quite ductile. Brittleness may occur because of condition eventually culminates in the perforation
heat treatment, welding, or through metal fatigue. of the steel section itself.
c. Durability. Steel, when protected properly, is b. Cracks.
extremely durable. (1) Cracks in the steel may vary from hairline
d. Fire resistance. Steel is subject to a loss of thickness to sufficient width to transmit light
strength when exposed to high temperatures such through the member. The first visible evidence is
as those resulting from fire. normally a crack in the paint film. Depending on
e. Corrosion. Unprotected carbon steel corrodes the location and the length of time the paint has
(rusts) readily. However, it can readily be pro- been open, there may be a thin line of rust stain
tected. emanating from the crack as shown in figure 5-12.
f. Weldability. Although steel is weldable, it is Crack identification on unpainted A588 steel is
necessary to determine the chemistry of the steel particularly difficult. There is no staining due to
and to select a suitable welding procedure before oxidation and the rough surface texture tends to
starting welding operations on a bridge. hide the crack.
g. Others. Steel is elastic and conducts heat and
(2) Any type of crack is obviously serious and
electricity.
should be reported at once. Record the location and
length of all cracks and indicate whether the
5-7. Indicators and classification of deteriora-
cracks are open or closed. The full length of the
tion
crack may not be completely visible. A suitable
a. Rust. Rusted steel varies in color from dark nondestructive test such as the dye penetrant test
red to dark brown. Initially, rust is fine grained, (discussed in the following section) can help to
but as it progresses it becomes flaky or scaly in establish its full length.
character. Eventually, rust causes a pitting of the (3) Cracks in fracture critical steel members
member. The inspector should note the location, (which should have been identified prior to the
characteristics, and the extent of the rusted areas. inspection) are especially serious and therefore
The depth of heavy pitting should be measured and these members should be inspected with extreme
the size of any perforation caused by rusting should care. Cracks of any size should be immediately
be recorded. Rust may be classified as follows: reported to the appropriate authority.
5-11
TM 5-600/AFJPAM 32-1088
h. Collisions. Trucks, over-height loads, derailed wiped off and a developer applied. The developer
cars, etc., may strike steel beams or columns, acts as a blotter, drawing out a portion of the
damaging the bridge. penetrant which has seeped into the defect, caus-
i. Animal wastes. These may cause rusting and ing a bright red outline of the defect to appear in
can be considered as a special type of direct the developer.
chemical attack. (2) Magnetic particle testing. In this test, a
j. Welds. Where the flux is not neutralized, magnetic field is induced in the steel by means of
some rusting may occur. Welds may crack because a moderately sized power source. Detection of a
of poor welding techniques or poor weldability of flaw is accomplished by application of inert com-
the steel. Problems with welds will also be dis- pounds of iron which are attracted to the magnetic
cussed in more detail in chapter 6. field as it leaves and then reenters the steel in the
k. Galvanic action. Other metals that are in area of the flaw. This test requires a highly
contact with steel may cause corrosion similar to trained inspector.
rust. (3) Radiographic inspection. This process in-
volves the application of x rays to an area or
5-9. Assessment of deterioration specimen in question. The ability of the specimen
a. As discussed in paragraph 5-9, the deteriora- to dilute the density of the x rays passing through
tion of steel members is mainly due to rusting or indicates its relative homogeneity. Any discontinu-
cracking. The determination of section loss due to ity, such as a fatigue crack, will show up on film
rusting is of primary importance for a proper load placed behind the specimen as less dense than the
rating assessment to be performed. This is usually sound material. This test method is most benefi-
done with precise mechanical (such as calipers) or cial and has been used most successfully in analyz-
electrical (such as a “depth meter”) measuring ing welds for incomplete fusion, slag and other
devices. The full assessment of cracks in steel inclusions, incomplete penetration, and gas pock-
members is very important since they can cause ets.
rapid failure to some members. All of the cracks in b. Tensile coupons. To perform an accurate anal-
a member should be located and their extent of ysis of the bridge’s load capacity, the material
propagation should be fully defined. In addition to properties of the steel must be known. In many
a close visual examination, a wide variety of older bridges, the type of steel, and thus its
nondestructive test methods exists for these pur- properties, may not be known. In these cases, the
poses and several of the most common methods are cutting of “coupons” for testing may be necessary.
briefly discussed: Since this operation causes considerable damage to
(1) Dye penetrant. This test is used to identify the member from which the coupon is taken,
the location and extent of surface cracks and extreme care must be exercised. The location for
surface defects, such as hairline fatigue cracks. It the coupon should be carefully chosen to provide
cannot be used to locate subsurface defects. For the most accurate information while causing the
the test, the area must be thoroughly cleaned of least structural damage to the structure. Guidance
paint, rust, scale, grease, and oily films. Then, an from a structural engineer should be obtained. The
oil-based liquid penetrant is applied which is samples should be 9 to 12 inches long and 2 to 3
intended to be absorbed into any cracks present. inches wide. The actual coupons will be machined
After a specific amount of time, the excess is from these samples.
5-10. Physical and mechanical properties b. Porosity. Being a cellular, organic material,
timber is quite porous.
a. Strength. Timber, while not as strong as c. Anisotropy. As may be deduced from the
steel, approximates ordinary concrete in compres- differences in allowable compressive strengths,
sive strength. Rated strongest in flexural strength, wood is anisotropic, i.e., it has different strength
timber has an allowable compressive strength properties depending upon the manner and direc-
(parallel to grain) of about 75 percent of the tion of loading.
flexural value. Perpendicular to the grain, com- d. Impact resistance. Since timber is able to
pressive strength is only 20 percent of the flexural withstand a greatly increased load momentarily,
strength. Horizontal shear is limited to 10 percent neither impact nor fatigue are serious problems
of the flexural strength. with timber.
5-13
TM 5-600/AFJPAM 32-1088
e. Durability. Under certain conditions, and Decay is very likely to occur at connections,
when properly treated or protected, timber is quite splices, support points, or around bolt holes. This
durable. However, timber is not a particularly may be due to the tendency of such areas to collect
durable material under all conditions. It should be and retain moisture or to bolt holes or cuts being
noted that some preservative treatments reduce made in the surface after the preservative treat-
the strength of timber. ment has been applied. Unless these surfaces are
f. Fire resistance. Timber is very vulnerable to subsequently protected, decay is very likely. Any
damage by fire. holes, cuts, scrapes, or other breaks in the timber
g. Other. Timber is also elastic, low in thermal surface which would break the protective layers of
and electrical conductivity, and subject to volume the preservative treatment and allow access to
changes. untreated wood should be noted.
b. Vermin. The following vermin tunnel in and
5-11. Deterioration: indicators and causes hollow out the insides of timber members for food
a. Fungus decay. Fungi usually require some and/or shelter:
moisture to exist. As a rule, fungus decay can be (1) Termites. All damage is inside the surfaces
avoided only by excellent preservative treatment. of the wood; hence, it is not visible. White mud
Fungus decay is classified as follows: shelter tubes or runways extending up from the
(1) Mild. Mild fungus decay appears as a stain earth to the wood and on the side of masonry
or discoloration. It is hard to detect and even substructures are the only visible signs of infesta-
harder to distinguish between decay fungi and tion. If the timber members exhibit signs of exces-
staining fungi. sive sagging or crushing, check for termite damage
(2) Advanced. Wood darkens further and with an ice pick or an increment borer.
shows signs of definite disintegration, with the (2) Powder-post beetles. The outer surface is
surface becoming punky, soft and spongy, stringy, poked with small holes. Often a powdery dust is
or crumbly, depending upon the type of decay or dislodged from the holes. The inside may be
fungus (figures 5-14 and 5-15). It is similar to completely excavated.
dryrot of door posts and outside porches. Fruiting (3) Carpenter ants. Accumulation of sawdust
bodies of fungi, similar to those seen on old on the ground at the base of the timber is an
stumps, may develop. The inspector should note indicator. The large, black ants may be seen in the
the location, depth of penetration, and size of the vicinity of the infested wood.
areas of decay. Where decay occurs at a joint or (4) Marine borers. The inroads of marine bor-
splice, the effect on the strength of the connection ers will usually be most severe in the area be-
should be indicated. A knife, icepick, or an incre- tween high and low water since they are water-
ment borer can be used to test for decayed wood. borne, although damage may extend to the mud
5-14
TM 5-600/AFJPAM 32-1088
line. Where piles are protected by concrete or section which will be most noticeable by the
metal shielding, the shields should be inspected hourglass shape developed between the tide levels.
carefully for cracks or holes that would permit c. Weathering and warping. This is caused by
entrance of the borers. Unplugged holes such as repeated dimensional changes in the wood, usually
those left by test borings, nails, bolts, and the like, due to repeated wetting. It may be described as
follows:
also permit entrance of these pests. In such cases,
(1) Slight. Surfaces of wood are rough and
there are often no outside evidences of borer
corrugated, and the members may even warp
attack. The inspector should list the location and
(figure 5-16).
extent of damage and indicate whether it is feasi-
(2) Advanced. Large cracks extend deeply or
ble to exterminate the infestation and strengthen
completely through the wood (figure 5-16). Wood
the member or if immediate replacement is neces- is crumbly and obviously deteriorated.
sary. d. Chemical attack. Chemicals act in three dif-
(5) Mollusk borers (shipworms). The shipworm ferent ways: a swelling and resultant weakening
is one of the most serious enemies of marine of the wood, a hydrolysis of the cellulose by acids,
timber installations. The most common species of or a delignification by alkalis. Animal wastes are
shipworms is the teredo. This shipworm enters the also a problem. Chemical attack will resemble
timber in the early stage of life and remains there decay and should be classified similarly.
for the rest of its life. Teredos reach a length of 15 e. Fire. Timber is particularly vulnerable to fire.
inches and a diameter of 3/8 inch, although some This type of damage is easily recognized and
species of shipworm grow to a length of 6 feet. The usually will have been reported prior to the inspec-
teredo maintains a small opening in the surface of tion.
the wood to obtain nourishment from the seawa- f. Abrasion and mechanical wear. Wear due to
ter. abrasion is readily recognized by the gradual loss
(6) Crustacean borers. The most commonly en- of section at the points of wear (figure 5-16). This
countered crustacean borer is the linoria or wood type of wear is most serious when combined with
louse. It bores into the surface of the wood to a decay which softens or weakens the wood. The
shallow depth. Wave action or floating debris decks of bridges are especially vulnerable. The
breaks down the thin shell of timber outside the inspector should report the location, the general
borers’ burrows, causing the linoria to burrow area subject to wear, and the loss in thickness. He
deeper. The continuous burrowing results in a should also indicate whether immediate remedial
progressive deterioration of the timber pile cross action is necessary.
5-15
TM 5-600/AFJPAM 32-1088
Figure 5-16. Slight and advanced wear on a timber deck (mechanical abrasion wear also present).
5-16
TM 5-600/AFJPAM 32-1088
5-17
TM 5-600/AFJPAM 32-1088
5-15. Deterioration: indicators and causes iron is subject to defects such as checks (cracking
Both wrought iron and cast iron are subject to the due to tensile cooling stresses) and blowholes. The
same causes of deterioration as structural steel latter has a serious effect on both the strength and
(previously discussed). It should be noted that cast toughness of the cast iron.
5-18
TM 5-600/AFJPAM 32-1088
riveted connection. Weld cracking often occurs on fatigue caused from wind and vibration loadings.
bridge signs due to stresses caused from the b. Pitting. Aluminum will pit slightly, but this
misalignment of prefabricated sections and due to condition rarely becomes serious.
5-21
TM 5-600/AFJPAM 32-1088
noted. Bracing, as well as the main supporting a. Slope failure (embankment slides). These are
sections, should be scrutinized for distortion. shear failures manifested as lateral movements of
i. Check backwalls and beam ends. Check the hillsides, cut slopes, or embankments. Footing or
backwalls for cracking which may be caused by embankment loads imposing shear stresses greater
either abutment rotation, sliding, or pavement than the soil shear strength are common causes of
thrust. Check for beam ends which are bearing slides (figure 5-24, part a).
against the backwall. This condition is a sign of b. Bearing failures. Bearing failures are settle-
horizontal movement of the abutment. ments or rotations of footings due to a shear
j. Observe fill and excavation slopes. Slide failure in the soil beneath (figure 5-24, part b).
scarps, fresh sloughs, and seepage are indications When bearing or slope failures take place on an
of past or imminent soil movement. older structure, it usually indicates a change in
k. Scour. See “Waterways,” section VIII of this subsurface conditions. This may endanger the se-
chapter. curity of nearby structures and foundations.
l. Unbalanced postconstruction embankment or c. Consolidation. Serious settlement can result
fills. Embankments or fills should be checked for from consolidation action in cohesive soils. Settle-
balance and positioning. Unbalanced embank- ment of bridge foundations may be caused by
ments or fills can cause a variety of soil move- changes in the groundwater conditions, the place-
ments which may impair the structural integrity ment of additional embankments near the struc-
of the bridge. ture, or increases in the height of existing em-
m. Underwater investigation of all piling and bankments.
pile bents. Underwater investigation of piling and d. Seepage. The flow of water from a point of
pile bents should be undertaken periodically. higher head (elevation or pressure) through the
Check all timber piles for insect attack and deteri- soil to a point of lower head is seepage (figure
oration. Examine steel piles well below the water 5-24, part c). Seepage develops a force which acts
surface. Steel piles protected in the splash zone on the soil through which the water is passing.
can rust between the concrete jacket and the Seepage results in lateral movement of retaining
mudline. Examine prestressed piles below water walls by:
for cracking or splitting. (1) An increase in weight (and lateral pres-
sure) of the backfill because of full or partial
5-26. Causes of foundation movements
saturation.
The following causes of foundation movements, (2) A reduction in resistance provided by the
except as specifically noted, can produce lateral soil in front of the structure.
and/or vertical movements depending on the char- e. Water table variations. Large cyclic variations
acteristics of the loads or substructures: in the elevation of the water table in loose granu-
5-22
TM 5-600/AFJPAM 32-1088
lar soils may lead to a compaction of the upper of river bridges are also subject to tremendous
strata. The effects of noncyclic changes in the wa- lateral loads when an ice jam occurs at the bridge.
ter table such as consolidations, slides, and seepage i. Thermal forces from superstructures. On struc-
were previously discussed. Changes in the water tures without expansion bearings, or where the
table may also change the characteristics of the expansion bearings fail to operate, thermal forces
soil which supports the foundation. Changes in soil may tip the substructure units. Pavement thrust is
characteristics may, in turn, result in the lateral another force that will have the same effect.
movement or the settlement of the foundation. j. Drag forces. Additional embankment loads or
f. Frost action. Frost heave in soil is caused by very slow consolidation of a subsurface compress-
the growth of ice lenses between the soil particles. ible stratum will exert vertical drag forces on the
Footings located above the frost line may suffer bearing piles which are driven through such mate-
from the effects of frost heave and a loss in rial. This may cause yielding or failure of the piles
bearing capacity due to the subsequent softening
(figure 5-24, part d).
of the soil. The vertical elements on light trestle
k. Deterioration, insect attacks, and construction
bents may also be lifted by frost and ice actions.
defects. All piles may develop weaknesses leading
g. Expansive soils. Some clays, when wet, absorb
to foundation settlements from one or more of
water and expand, placing large horizontal pres-
these causes:
sures on any wall retaining such soil. Structures
founded on expansive clay may also experience (1) Timber, steel, and concrete piles are sub-
vertical soil movements (reverse settlement). ject to loss of section because of decay, rusting, and
h. Ice. Ice can cause lateral movement in two deterioration.
ways. Where fine-grained backfill is used in re- (2) Timber piles are vulnerable to marine
taining structures and the water table is above the borers and ship worms.
frost line, the expansion of freezing water will (3) Construction defects include overdriven
exert a very large force against a wall. The piers piles, underdriven piles, failure to fill pile shells
5-23
TM 5-600/AFJPAM 32-1088
completely with concrete, or imperfect casings of a able hole can be formed around piers or other
cast-in-place pile. Any of these defects will produce similar structural objects. This condition results in
a weaker pile. Settlement will probably be gradual a greater turbulence of water and an increased
in improperly driven piles or in piles with weak or size of soil particles that can be displaced. Scour is
voided concrete. Piles suffering severe loss of sec- a very important consideration and will be given
tion due to rust, spalling, chemical action, or considerable attention in section VIII of this chap-
ter. Erosion of embankments due to improper
insect infestation may fail suddenly under an
drainage (figure 5-25) can also lead to approach
unusually heavy load.
and abutment settlements.
l. Scour and erosion. Scour can cause extensive m. Earth or rock embankments (stockpiles). Post-
settlement and/or structural failure as previously construction placement of embankments may
shown in figures 5-22 and 5-23. Since water will cause instability since it will produce greater loads
carry off particles of soil in suspension, a consider- than were included in the original design.
5-24
TM 5-600/AFJPAM 32-1088
SECTION A-A
5-26
TM 5-600/AFJPAM 32-1088
5-39) is often provided to prevent bank erosion or stream channel will cause increased upstream flow
to streamline the flow. It is particularly important velocities and thus degradation.
where flow velocities are higher or where consider- (3) Removal of obstruction. A downstream ob-
able turbulence is likely. It may also be necessary struction (figure 5-42) will cause the flow under
where there is a change in direction of the water- the bridge to be deep and slow. Once the obstruc-
way. Slope cones around abutments are very sus- tion is removed, the flow becomes more shallow
ceptible to erosion and are usually protected. and more rapid, causing degradation.
Situations which lead to channel degradation are c. Waterway adequacy. Scour and streambed
as follows: degradation are actually the result of inadequate
(1) Channel change. Changes in the channel waterway areas (freeboard). The geometry of the
(figure 5-40) steepen the channel profile and in- channel, the amount of debris carried during high
crease flow velocity. The entire upstream reach water periods, and the adequacy of freeboard
may degrade. should be considered in determining waterway
(2) Removal of material. Removal of large adequacy. Where large quantities of debris and ice
quantities of material (figure 5-41) (such as by are expected, sufficient freeboard is of the greatest
dredging or gravel borrow pits) from the down- importance.
5-28
TM 5-600/AFJPAM 32-1088
5-29
TM 5-600/AFJPAM 32-1088
5-30
TM 5-600/AFJPAM 32-1088
CHAPTER 6
Section I. GENERAL
enced structural engineer and should be based adversely affect the toughness of the steel. FCMs
upon the following criteria: that are known or suspected to have been dam-
a. Degree of redundancy. This was previously aged should receive a high priority during the
discussed in Section I. inspection, and more sophisticated testing may be
b. Live load member stress. The range of live warranted.
load stress in fracture critical members influences d. Condition of the FCMs. A bridge that receives
the formation of cracks. Fatigue is more likely proper maintenance normally requires less time to
when the live load stress range is a large portion inspect. Bridges with FCMs in poor condition
of the total stress on the member. should be inspected at more frequent intervals
c. Propensity for cracking or fracture. The frac- than those in good condition.
ture toughness is a measure of the material’s e. Fatigue prone design details. Certain design
resistance to crack extension and can be defined as details have been more susceptible to fatigue
the ability to carry load and to absorb energy in cracking. Table 6-1 and figure 6-3 classify the
the presence of a crack. FCMs designed since 1978 types of details by category. The thoroughness of a
by AASHTO standards are made of steel meeting fracture critical member inspection should be in
minimum toughness requirements. On older the order of their susceptibility to fatigue crack
bridges, coupon tests may be used to provide this propagation, namely from the highest (E) to the
information. If testing is not feasible, the age of lowest (A) alphabetical classification.
the structure can be used to estimate the steel f. Previous and predicted loadings. Repeated
type which will indicate a general level of steel heavy loading is a consideration in determining
toughness. Welding, overheating, overstress, or the appropriate level of inspection. While this is
member distortion resulting from collision may not an exact science and new bridges have devel-
6-2
TM 5-600/AFJPAM 32-1088
oped fatigue cracks, the longer the bridge has been age is normally sufficient information to enable
in service with a high volume of heavy loads, the someone familiar with traffic in the area to make
greater the risk. When the precise number of loads a reasonable estimate.
experienced is not available, the location and the
6-5. Two-girder system (or single-box girder) steel boxbeams. The fracture critical elements in
a. Simple spans. A two-girder framing system is all of these girders are in the bottom flange and
shown in figure 6-1. It is composed of two longitu- the web adjacent to the bottom flange as shown in
dinal girders which span between piers with trans- figure 6-4, part a.
verse floorbeams between the girders. Floorbeams b. Anchor-cantilever. An anchor-cantilever span
support longitudinal stringers. The failure of one arrangement induces tension in the top flange and
girder may cause the span to collapse. These adjacent portion of the web in the area over the
girders may be welded or riveted plate girders or support as shown in figure 6-4, part b.
6-3
TM 5-600/AFJPAM 32-1088
c. Continuous spans. Continuous spans should concern. The diagonals and verticals which are in
be reviewed by a structural engineer or bridge tension are also of primary concern. These mem-
designer to assess the actual redundancy and bers should be identified by a qualified structural
consequent presence of FCMs. In general, the engineer.
fracture critical elements will be located near b. Anchor-cantilever. The anchor-cantilever in a
the center of the spans in the bottom of the gird- truss system is similar to that in a girder system.
ers and over the supports in the top of the gird- In the area over an interior support (pier), the top
ers. chord is in tension. In the area near the end
supports (abutments), the truss is similar to a
6-6. Two-truss system
simple-span truss and the same principles ap-
a. Simple spans. Most truss bridges have only ply. From the center of the anchor span to the
two trusses. A truss may be considered a special- interior support, the stress arrangement is more
ized girder with most of the web removed. Since complex and should be analyzed by a structural
tension members are the critical elements, the engineer.
bottom chord and its connections are of primary c. Continuous spans. The statements regarding
6-4
TM 5-600/AFJPAM 32-1088
continuous girders are also true regarding continu- 6-8. Supports and suspended spans
ous trusses. In a continuous truss, the number of a. An example of a pin and hanger is shown in
members in tension varies with the loading. Con- figure 3-15. Pin and hanger assemblies are as
sequently, the determination of which members redundant as the framing system in which they
are in tension and which are fracture critical are used. Hangers in a two-girder framing system
should be made by a structural engineer. offer no redundancy while the same assemblies
used in a multibeam system have a high degree of
6-7. Cross girders and pier caps
redundancy.
The tension portions of simply supported cross b. An alternate support to the pin and hanger
girders and steel pier caps, as shown in figure 6-5, assembly is shown in figure 3-14. Portions of this
are nonredundant. These members usually consist detail (the short cantilever projection from the
of I sections or box beams. Unlike floorbeams girder to the right) are fracture critical because
which support only a portion of the deck, cross part of it is in tension, and its failure will cause
girders and steel pier caps support the entire end collapse unless it is used in a redundant framing
reactions of two longitudinal spans. system.
6-5
TM 5-600/AFJPAM 32-1088
6-6
TM 5-600/AFJPAM 32-1088
CHAPTER 7
INSPECTION CONSIDERATIONS
viewing suspected areas and small cracks along transit, level, or other surveying equipment; tele-
welds and around connections, and a shovel for vision camera for underwater use on closed circuit
removing debris. television with video tape recorder; magnetic or
electronic locator for rebars; helicopters; air jet
7-6. Special equipment
equipment; air breathing apparatus; mechanical
Other specialty items which may be required are: ventilation equipment (blowers and air pipes);
ladders; scaffolds (travelers or cabling); “snooper” preentry air test equipment (devices to test oxygen
or “cherry picker” (truck-mounted bucket on a content and to detect noxious gasses); ultrasound
hydraulically operated boom (or on a platform equipment; radiographic equipment; magnetic par-
truck)); burning, drilling, and grinding equipment; ticle equipment; and dye penetrants. Ultrasound,
sand or shot blasting equipment; boat or barge; radiographic, magnetic particle, dye penetrant,
diving equipment (scuba or hard hat); sounding and other nondestructive methods are beyond the
equipment (lead lines or electronic depth finders); scope of the average inspection.
7-2
TM 5-600/AFJPAM 32-1088
b. Scaffolding. When using scaffolding, the fol- high in corrosion resistance even in the bare metal
lowing precautions should be observed: state. In some closed sections, a closable, water-
(1) Scaffolding and working platforms should tight, and vapor tight access hole is provided to
be of ample strength and should be secure against permit inspection of the interior. While the box
slipping or overturning. section offers both structural and maintenance
(2) Hanging scaffolds and other light scaffolds advantages over other types of sections, there are
supported by ropes should be tested before using certain health hazards of which the maintenance
by hanging them 1 foot or so from the ground and inspectors, and others who may be involved with
loading them with a weight at least four times as these types of sections, should be aware.
great as their working load. b. Hazards. No health hazard exists in confined
(3) Scaffolds should be inspected at least once space if there is proper ventilation. However, a
each working day. hazardous atmosphere can develop because of a
c. Ladders. Ladders should be used as working lack of sufficient oxygen or because of a concentra-
platforms only when it is absolutely necessary to tion of toxic gases. Oxygen deficiency can be
do so. When using ladders, the following precau- caused by the low oxidation of organic matter
tions should be observed: which can become moistened. Toxic gasses may
(1) Make certain that the ladder to be used is seep into the confined space or may be generated
soundly constructed. If made of wood, the material by such work processes as painting, burning, or
should be straight-grained and clear. welding. The confined space may be of such small
(2) Ladders should be tested to make sure volume that air contaminants are produced more
they can carry the intended loads. quickly than the limited ventilation of the space
(3) Ladders should be blocked at the foot or can overcome. Persons should not be allowed to
tied at the top to prevent slipping. work in confined spaces containing less than 19
(4) Personnel should be cautioned frequently percent oxygen, unless provided with air breathing
about the danger of trying to reach too far from a apparatus. However, as noted, a space with suffi-
single setting of a ladder. cient oxygen content can become unfit for human
d. Planks or platforms. Planks or platforms may occupancy if the work conducted therein produces
be used where necessary. The following precau- toxic fumes or gases. Such space should be occu-
tions should be observed: pied by the inspector only after adequate ventila-
(1) Planks should be large enough for the tion.
span. c. Safety procedures.
(2) Never use a single plank. Two planks are (1) Preentry air tests.
a bare minimum; they should be attached by leads (a) Tests for oxygen content should be con-
18 inches apart. ducted with an approved oxygen-detecting device.
e. Safety. A minimum of two tests should be conducted.
(1) Keep all catwalks, scaffolds, platforms, (b) Where the presence of other gases is
etc., free from ice, grease, or other slippery sub- suspected, tests for such gases should be conducted
stances or materials. using approved gas-detecting devices. The follow-
(2) Catwalks, scaffolds, and platforms should ing gases should be considered: carbon dioxide,
have hand rails and toe boards to keep tools or carbon monoxide, hydrogen sulfide, methane, or
other objects from being kicked off and become a any combustible gas.
hazard to anyone below. (c) If the oxygen content of the air in the
(3) Always watch where you are stepping. Do space is below 19 percent or if noxious gases
not run or jump. present are equal or in excess of 125 percent of the
(4) Do not climb if you are tired or upset. Threshold Limit Values established by the Ameri-
can Conference of Government Industrial Hygien-
7-12. Confined spaces ists (reference 6), no person should be allowed to
a. General. In recent years there has been an enter such space until the oxygen content and gas
increasing use of hollow structural members of the content meet these specified limits for a minimum
tubular or box-section types large enough to per- period of 15 minutes.
mit a man to enter the interior of the member. In (2) Ventilation during occupancy.
bridge work, boxes are used both in large truss (a) All confined spaces should be mechani-
bridges and in girder bridges with rectangular or cally ventilated continuously during occupancy
trapezoidal box sections. In these types of mem- regardless of the presence of gas, the depletion of
bers, the interior is often closed off at both ends, oxygen, or the conduct of contaminant-producing
forming a closed box. This protected interior is work.
7-3
TM 5-600/AFJPAM 32-1088
(b) Where contaminant-producing operations is detected or suspected, air tests similar to the
are to be conducted, the ventilation scheme should preentry air tests should be conducted during
be approved by an industrial hygiene engineer, occupancy at 15-minute intervals.
safety engineer, marine chemist, or others quali- (b) Where contaminant-producing opera-
fied to approve such operations. tions are conducted, air tests should be conducted
(3) Air tests during occupancy. to determine the adequacy of the ventilation
(a) If toxic gas presence or oxygen depletion scheme.
other photo should be a view of the side elevation. (4) Recommendations. The inspector should
(3) Summary. An inspection is not complete list according to urgency any repairs that are
until a narrative summary of the condition of the necessary to maintain structural integrity and
structure has been written. public safety.
7-5
TM 5-600/AFJPAM 32-1088
CHAPTER 8
Section I. SUBSTRUCTURES
8-2
TM 5-600/AFJPAM 32-1088
m. Determine whether any earth or rock fills ularly at floorbeams and lateral bracing where
have been piled against piers causing loads not out-of-plane bending is introduced.
provided for in the original design and producing (c) If longitudinal stiffeners have been used,
unstable conditions. check any butt weld splices in the longitudinal
stiffeners. The web at the termination of longitudi-
n. Inspect cross girder pier caps (figure 6-5).
nal stiffeners should also be checked carefully.
Their failure will generally cause collapse of the
(d) If cover plates are present, check care-
unsupported span. Therefore, they are considered fully at the terminus of each for cracks.
FCMs and should be closely inspected as follows: (e) Observe any area of heavy corrosion for
(1) Riveted. pitting section loss or crack formation.
(a) Check all rivets and bolts to determine (f) If girders have been haunched by use of
that they are tight and that the individual compo- insert plates, observe the transverse groove weld-
nents are operating as one. Check for cracked or ing between the web and insert plate.
missing bolts, rivets, and rivet heads. (g) Check longitudinal fillet welds for possi-
(b) Check the member for misplaced holes ble poor quality or irregularities that may cause
or repaired holes that have been filled with weld cracking to initiate. This is especially important
metal. These are possible sources of fatigue crack- during the first inspection of the member so that
ing. defects can be recorded and properly documented
(c) Check the area around the floorbeam on follow-up inspections.
and lateral bracing connections for cracking in the (h) Check for cracks at any intersecting
web due to out-of-plane bending. fillet welds. If triaxial intersecting welds are found
(d) Check the entire length of the tension on an FCM, they should be reported and carefully
flanges and web for cracking which may have examined in future inspections.
originated from corrosion, pitting or section loss, (i) Check any plug welds.
or defects in fabrication (e.g., nicks and gouges in (j) Check bolted splices for any sign of
the steel). cracks in girders or splice plates and look for
(e) Check entire length for temporary erec- missing or cracked bolts.
tion welds, tack welds, or welded connections not (k) Check the entire length of the tension
shown on the design drawings. flanges and web for cracking which may have
(2) Welded. originated from corrosion, pitting or section loss,
(a) Check all tranverse groove welds for or defects in fabrication.
indication of cracks, especially near backup bars. (l) Check entire length for temporary erec-
(b) Check all tranverse stiffeners and con- tion, tack welds, or welded connections not shown
nection plates at the connection to the web, partic- on the design drawings.
8-3
TM 5-600/AFJPAM 32-1088
8-5. Pile bents (9) Check timber piles in salt water at checks
a. Concrete. Check for the same items as dis- in the wood, bolt holes, daps, or other connections
cussed in paragraph 8-4. for damage by marine borers.
b. Timber. c. Steel.
(1) Check for decay in the piles, caps, and (1) Check the pile bents for the presence of
bracing (figure 8-5). The presence of decay may be rust, especially at the ground level line. Use a
determined by tapping with a hammer or by test chipping hammer, if necessary, to determine the
boring the timber. Check particularly at the extent of the rust. Over water crossings, check the
groundline, or waterline, and at joints and splices, splash zone (2 feet above high tide or mean water
since decay usually begins in these areas. level) and the submerged part of the piles for
(2) Check splices and connections for tightness indications of rust.
and for loose bolts. (2) Check for debris around the pile bases.
(3) Check the condition of the cap at those Debris will retain moisture and promote rust.
points where the beams bear directly upon it and (3) Check the steel caps for rotation due to
at those points where the cap bears directly upon eccentric (off-center) connections.
the piles. Note particularly any splitting or crush- (4) Check the bracing for broken connections
ing of the timber in these areas. and loose rivets or bolts.
(4) Observe caps that are under heavy loads (5) Check condition of web stiffeners.
for excessive deflections.
(5) Check for rotted or damaged timbers in 8-6. Dolphins and fenders
the backwalls of end bents (abutments), especially a. Steel. Observe the “splash zone” carefully for
where such conditions would allow earth to spill severe rusting and pitting. The splash zone is the
upon the caps or stringers. Approach fill settle- area from high tide to 2 feet above high tide.
ment at end bents may expose short sections of Where there are no tides, it is the area from
piling to additional corrosion or deterioration. the mean water level to 2 feet above it. Rusting
(6) In marine evironments, check structures is much more severe here than at midtide eleva-
for the presence of marine borers and shipworms. tions.
(7) Check timber piles in salt water to deter- b. Concrete. Look for spalling and cracking of
mine damage caused by marine borers. concrete, and rusting of reinforcing steel. Be alert
(8) Check timber footing piles in salt water for hour-glass shaping of piles at the waterline.
exposed by scour below the mudline for damage c. Timber. Observe the upper portions lying
caused by marine borers. between the high water- and mudline for marine
8-4
TM 5-600/AFJPAM 32-1088
8-7. Concrete beams and girders whether of prestressed or reinforced concrete, uti-
a. All beams. lize a shiplapped joint in which the suspended
(1) Check for spalling concrete, giving special span rests upon bearings located on the anchor
attention to points of bearing where friction from span (figure 8-8). The shiplap cantilevers with
thermal movement and high edge pressure may reentrant corners are fracture critical details and
cause spalling (figure 8-7). should be inspected very carefully for signs of
(2) Check for diagonal cracking, especially cracking or other deterioration.
near the supports. The presence of diagonal cracks (3) Check for flexure (vertical) cracks or disin-
on the side of the beam may indicate incipient tegration of the concrete, especially in the area of
shear failure. This is particularly important on the the tension steel. Discoloration of the concrete
older prestressed bridges. Cantilever bridges, surface may be an indication of concrete deteriora-
tion or the corrosion of the reinforcing steel. In
severe cases, the reinforcing steel may become
exposed.
(4) Observe areas that are exposed to roadway
drainage for disintegrating concrete.
(5) Check for damage caused by collision or
fire.
(6) Note any excessive vibration or deflection
during passage of traffic.
b. Box girders.
(1) Examine the inside of box girders for
cracks and to see that the drains are open and
functioning properly.
(2) Check the soffit of the lower slab and the
outside face of the girders for excessive cracking.
Figure 8-7. Concrete beam checklist.
(3) Check diaphragms for cracks.
8-5
TM 5-600/AFJPAM 32-1088
(4) Examine the underside of the slab and top cially suspect since this indicates lack of mainte-
flange for scaling, spalling, and cracking. nance and ideal conditions for deterioration.
(5) Note any offset at the hinges which might Cleaning may be necessary to properly inspect the
indicate problems with the hinge bearing. An members for cracks and corrosion.
abnormal offset should be investigated further to b. Inspect steel for corrosion and deterioration
determine the cause and the severity of the condi- (figure 8-9) especially at the following places:
tion. (1) Along the upper flange.
c. Prestressed concrete members. (2) Around bolts and rivet heads.
(1) Check for longitudinal cracks on all flange (3) At gusset, diaphragm, and bracing connec-
surfaces. This may occur on older prestressed tions.
bridges where insufficient stirrups were provided. (4) At cantilever hanger and pin connections.
(2) Examine the alignment of prestressed (5) Under the deck joints and at any other
beams. points that may be exposed to roadway drainage.
(3) Check for cracking and spalling in the (6) At any point where two plates are in
area around the bearings and at the cast-in-place face-to-face contact and water can enter (such as
diaphragms where differential creep and humping between a cover plate and a flange).
of the beams may have some ill effects. (7) At the fitted end of stiffeners.
(4) On pretensioned deck units, either box- (8) At the ends of beams where debris may
beams or voided units, check the underside during have collected.
the passage of traffic to see whether any unit is c. If rusting and deterioration are evident, check
acting independently of the others. the members to determine the extent of reduced
cross-sectional area, using calipers, rulers, corro-
8-8. Steel beams and girders sion meters, or section templates.
It should be remembered that steel beams and d. Check all rivets and bolts to determine that
girders may qualify as FCMs (chapter 6). Any they are tight and that the individual components
serious problems found in an FCM should be are operating as one. Check for cracked or missing
addressed immediately since its failure could cause bolts, rivets, and rivet heads.
total collapse of the bridge. Immediate closure of e. Check the entire length of the tension flanges
the bridge may be warranted if the defect is and web for cracking which may have originated
deemed serious. Regardless of the member’s FCM from corrosion, pitting or section loss, or defects
status, the following items should be inspected: in fabrication (such as nicks and gouges in the
a. Check members for cleanliness and freedom steel).
from debris, especially on the top side of the f. Examine welds, weld terminations, and adja-
bottom flange. Unclean members should be espe- cent metal for cracks, particularly at:
8-6
TM 5-600/AFJPAM 32-1088
(1) Unusual types of weld connections or con- (7) Horizontal connection plates used to con-
nections to which access would have been difficult nect lateral bracing, as shown in figure 8-16.
for the welder. (8) Areas where vibration and movement
(2) Field welds, especially plug welds, often could produce fatigue stress.
cause stress concentrations and are thus prone to (9) Coped sections/reentrant corners (figure
fatigue cracking. 8-17).
(3) Connections transmitting heavy torsional (10) Connections of boxbeams to columns
or in-plane moments to the members. Typical (figure 8-18).
connections of this type are: g. Check the general alignment by sighting
(a) Floorbeam-to-girder connections (see fig- along the members. Misalignment or distortion
ure 8-10). may result from overstress, collision, or fire dam-
(b) Brackets cantilevered from the fascia age. If such a condition is present, its effect on
beams (or any cantilever connection from a beam). structural safety of the bridge should be fully
(c) Moment splices. investigated.
h. Check for wrinkles, waves, cracks, or damage
(d) Joints in rigid frames.
in the web flanges of steel beams, particularly
(4) Sudden changes in cross section or configu-
near points of bearing. This condition may indicate
ration or other locations subject to stress concen-
overstressing. Check the stiffeners for straightness
trations or fatigue loadings. Several specific areas
and determine whether their connections are bro-
in this category are: ken, buckled, or pulled from the web.
(a) Termination points of welded cover i. Determine whether any unusual vibration or
plates (figure 8-11). excessive deflections occur under the passage of
(b) Longitudinal welds along the length of heavy loads.
cover plates, especially intermittent welds as j. Check the wind locks (figure 3-14) for bind-
shown in figure 8-12. ing, jamming, improper fit, or excessive movement
(c) Welds of insert plates in haunched gird- before engaging.
ers (figure 8-13). k. Thoroughly check the inside of box girders for
(5) The potential crack locations for longitudi- all of these problems.
nal and transverse web stiffeners are summarized l. In composite construction, stud type shear
in figure 8-14. Note in figure 8-14 (sheet 3) that connectors are utilized between the upper flange of
the crack is due to an improperly made butt weld. the beam or girder and the deck slab. In this case,
(6) The intersection of horizontal and vertical the underside of the top girder flange should be
fillet welds such as that shown in figure 8-15. checked for cracks as shown in figure 8-19. This is
8-7
TM 5-600/AFJPAM 32-1088
only necessary in the areas spanning over pier the plate for cracks due to bending of the plate
supports; i.e., the negative moment region. from a frozen pin connection.
(2) Observe the amount of corrosion buildup
8-9. Pin and hanger connections between the webs of the girders and the back faces
a. Hanger plates. These plates (figure 3-15) are of the plates.
as critical as the pin in a pin and hanger connec- (3) Check the hanger plate for bowing or
tion. It is, however, easier to inspect since it is out-of-plane movement from the webs of the gird-
exposed and readily accessible; and the following ers. If the plate is bowed, check carefully at the
steps are required: point of maximum bow for cracks which might be
(1) Try to determine whether the hanger-pin indicated by broken paint and corrosion.
connection is frozen, since this can induce large (4) All welds should be checked for cracks.
moments in the hanger plates. Check both sides of b. Pin. Rarely is the pin directly exposed in a
8-8
TM 5-600/AFJPAM 32-1088
ELEVATION
8-9
TM 5-600/AFJPAM 32-1088
measuring wear on each are discussed in the (b) Measure the distance between the center
following paragraphs: of the pin and the end of the hanger.
(1) Girder pin and hanger. Wear to the pins (c) Compare to plan dimensions, if avail-
and hangers will generally occur in two locations, able. Remember to allow for any tolerances, since
at the top of the pin and top of the hanger on the the pin was not machined to fit the hole exactly.
cantilevered span, and the bottom of the pin and Generally, this tolerance will be 1/32 inch. If plans
bottom of the hanger on the suspended span. are not available, compare to previous measure-
Sometimes wear, loss of section, or lateral slippage ments. The reduction in this length will be the
may be indicated by misalignment of the deck “apparent wear” on the pin.
expansion joints or surface over the hanger connec- (2) Fixed pin and girder. Wear will generally
tion. The following inspection procedure should be be on the top surface of the pin due to rotation
used. Figure 3-16 can be used as a reference from live load deflection and tractive forces. The
sketch. following steps should be used with figure 3-16 as
(a) Locate the center of the pin. a reference:
8-10
TM 5-600/AFJPAM 32-1088
(a) Locate the center of the pin. find a fixed reference point because the gusset
(b) Measure the distance between the center plate dimensions are not usually given on design
of the pin and some convenient fixed point, usually plans, but two recommended options are the inter-
the bottom of the top flange. section of the upper or lower chord and the nearest
(c) Compare this distance to the plan dimen- diagonal or the edge of the gusset plate along the
sions and determine the amount of section loss. axis of the hanger. Both these points will provide
(3) Truss pin and hunger. Pin and hanger readily identifiable reference points which can be
recreated easily by the next inspection team. For
arrangements are slightly different when used in
this reason, measurements should be carefully
trusses. Usually the hanger plates are compact
documented along with the temperature and
members similar to a vertical or diagonal. The weather conditions. The inspection procedure
hanger then slips between gusset plates at both should include:
the upper and lower chords. It is more difficult to (a) Locate center of pin.
8-11
TM 5-600/AFJPAM 32-1088
8-12
TM 5-600/AFJPAM 32-1088
the floorbeams. It occurs primarily on older struc- Figure 8-21. Clip angle stringer connection
tures where the floorbeams are simply supported
and where the stringers rest upon the floorbeams.
(4) The connections on the end floorbeams
should be examined thoroughly for cracks in the
welds and for slipped rivets or bolts.
b. Stringers.
(1) Steel.
(a) Check for rust or deterioration, espe-
cially around the top flange where moisture may
accumulate from the floor above and at the end
connections around rivets, bolts, and bearings.
(b) Check for sagging or canted stringers.
(c) Inspect all stringer connections for loose
fasteners and clip angles (figure 8-21). Where
stringers are seated on clip angles, check for
cracks in the floorbeam web.
(2) Timber.
(a) Check for crushing and decay, especially Figure 8-22. Diaphragm checklist items.
along the top where the decking comes in contact
with the stringer and at points at which the ularly susceptible to corrosion from roadway mois-
stringer bears directly upon the abutment and ture and from deicing agents.
bent caps. (3) Look for buckled or twisted cross frames.
(b) Check for horizontal cracks and split-
This situation may be an indication of overstress
ting, especially at the ends of stringers, where
of the bracing.
they are often notched.
b. Timber.
(c) Check for sagging or canted stringers.
(1) Check for cracking or splitting, especially
(d) Check the bridging between the string-
ers to determine whether it is tight and function- in end diaphragms that are supporting the floor.
ing properly. (2) Check for decay along the top of the
(e) Check for accumulations of dirt and de- diaphragms where they may come in contact with
bris. the floor.
c. Concrete. Check for cracks, spalls, and for
8-11. Diaphragms and cross frames other forms of deterioration.
a. Steel.
8-12. Trusses
(1) Check for loose or broken connections be-
tween the web of the beam or girder and the a. Steel trusses.
diaphragm (figure 8-22). (1) Rust and deterioration. On through
(2) Check for rust or other deterioration, espe- trusses, moisture and deicing chemicals from the
cially around rivets and bolts, and those portions roadway are often splashed on the lower chord
of the end of the diaphragms which come in members and the member adjacent to the curb.
contact with the bridge floor. These may be partic- The moisture and chemicals are retained at the
8-13
TM 5-600/AFJPAM 32-1088
connection and between the adjacent faces of eye- caps, and keys are in place. Refer to paragraph
bars, pin plates, etc. leading to rapid deterioration 8-9 for a detailed inspection procedure.
of the member. On riveted trusses, the horizontal (6) Noise. Note clashing of metal with the
surfaces and connections of lower chord members passage of live loads.
(figure 8-23) are especially susceptible to corro- (7) Riveted or bolted tension members.
sion. Debris tends to accumulate causing moisture (a) Check each component to see that the
and salt to be retained. Note any deformation loads are being evenly distributed between them
caused by expanding rust on the inside surfaces of by attempting to vibrate the members by hand
laminated or overlapping plates. and that batten plates are tight. If the loads are
(2) Alignment of truss members. End posts and being unevenly distributed, one component might
interior members are vulnerable to collision dam- be loose or not have the right ring to it when
age from passing vehicles. Buckled, torn, or mis- struck with a hammer.
aligned members may severely reduce the load- (b) Check carefully along the first row of
carrying capacity of the truss. Misalignment can bolts or rivets for cracking as the first row carries
be detected by sighting along the roadway rail or more load than succeeding rows. The first row is
curb and along the truss chord members. Investi- that closest to the edge of the gusset plate and
gate and report any abnormal deviation. perpendicular to the axis of the member.
(3) Over-stressed members. Local buckling indi- (c) Check for nicks, gouges, and tears due to
cates overstress of a compression member. Wrin- impact from passing vehicular traffic. This type of
kles or waves in the flanges, webs, or cover plates damage can initiate future cracks.
are common forms of buckling. Overstress of a (d) Observe carefully any tack welding used
either in construction or repair since this is a
ductile tension member could result in localized
potential source of cracks. Any tack welds should
contraction in the cross section area of the mem-
be specially noted in the report for future observa-
ber. This is usually accompanied by flaking of the
tion and consideration in stress rating.
paint.
(e) If any misplaced holes or holes used for
(4) Loose connections. Cracks in the paint or reconstruction have been plug welded, check care-
displaced paint scabs around the joints and seams fully for fatigue cracks.
of gusset plates and other riveted or bolted connec- (8) Welded tension members.
tions may indicate looseness or slippage in the (a) Check the full length of all longitudinal
joints. Check rivets and bolts that appear defec- welds of each tension member for cracks.
tive. (b) Check all joints at the ends of the
(5) Pins. Inspect pins for scouring and other members, including gussets.
signs of wear. Be sure that spacers, nuts, retaining (c) Check all transverse welding including
internal diaphragms in box members.
(d) If connections are welded at gusset
plates, carefully check these welds, particularly if
any eccentricities observable by eye are involved.
(e) As with bolted or riveted members,
check carefully for nicks, gouges, and tears due to
impact damage and for any repairs made using
tack welding.
(f) Box sections or other sections welded
with backup bars should be checked carefully for
discontinuity in the backup bars.
(g) Portions of fracture critical tension mem-
bers which are difficult to access must be checked
for corrosion using mirrors, fiberscopes, or boro-
scopes.
(h) Members should be examined carefully
for any sites of arc strikes.
(i) Check carefully any holes that have been
filled with weld metal since those are a source of
fatigue cracking.
(9) Eyebar members. Whether or not these
Figure 8-23. Lower chord of a riveted truss. bars are fracture critical is dependent upon the
8-14
TM 5-600/AFJPAM 32-1088
number of eyebars per member. During the inspec- versely by hand. The inspector should not adjust
tion process, the inspector should: the turnbuckle but report the problem.
(a) Inspect carefully the area around the eye b. Timber trusses.
and the shank for cracks (figure 8-24). This is (1) Check for weathering, checking, splitting,
where most failures occur in eyebars. and decay. Decay is often found at joints, caps, and
(b) Examine the spacers on the pins to be around bolts holes. Decay is also common on the
sure they are holding the eyebars in their proper bridge seat.
position. (2) Check for crushing at the ends of compres-
(c) Examine closely spaced eyebars at the sion chord and diagonal members.
pin for corrosion buildup (pack rust). These areas (3) Examine splices carefully for decay. Note
do not always receive proper maintenance due to whether bolts and connections are tight.
their inaccessibility. (4) Check for decay at joints where there are
(d) Evaluate weld repairs closely. contact surfaces, caps, where moisture can enter,
(e) Check to determine if any eyebars are and around holes through which truss bolts are
loose (unequal load distribution) or if they are fitted.
frozen at the ends (no rotation). (5) Check end panel joints for decay.
(f) Check for any unauthorized welds and (6) Check for dirt or debris accumulation on
include their locations in the report so that the the bridge seat.
severity of their effect on the member may be (7) Investigate the roof and sides of covered
assessed. bridges for adequacy of protection afforded the
(10) Counters. structure members from the elements of weather.
(a) Check the looped rod for cracks where (8) Check the alignment of the truss. Sagging
the loop is formed. of the truss may be due to the partial failure of
(b) Observe the counters under live load for joints or improper adjustment of steel vertical
abnormal rubbing where the counters cross, and rods.
check this area carefully for wear (figure 8-25). (9) Be particularly aware of fire hazards un-
(c) Examine the threaded rods in the area of der the bridge, such as:
the turnbuckle for corrosion and wear. (a) Brush or drift accumulating.
(d) Test the tension in each rod to be sure (b) Storage of combustible material.
they are not over-tightened or undertightened. The (c) Parking of vehicles.
relative tension can be checked by pulling trans- (d) Signs of fires built.
8-15
TM 5-600/AFJPAM 32-1088
8-13. lateral bracing portals and sway frames that they are internally redundant. Inspection
should include:
a. Check all bracing members for rust, espe-
(1) Observe built-up members to assure that
cially on horizontal surfaces such as those of
the load is being evenly distributed to all compo-
lateral gusset plates and pockets without drains or
nents and that batten plates, lacing, and ties are
with clogged drains.
tight. If members are loose or do not ring properly
b. Check for rust around bolts and rivet heads.
when struck with a hammer, loads may be distrib-
c . Look for loose or broken connections. uted unevenly.
d. Check all upper and lower bracing members (2) Check the bolts or rivets at all connections
to observe whether they are properly adjusted and (hangers, floorbeams, and end reactions) for cracks.
functioning satisfactorily. All tack welds and/or strikes should be brought to
e. Check for bent or twisted members. Since the attention of the engineer for proper evaluation.
most of these bracing members work in compres- (3) Observe if any repairs or construction tech-
sion, bends or kinks could significantly reduce niques have made use of tack welding and check
their effectiveness. Since portals and sway braces carefully for cracks. All tack welds and/or strikes
necessarily restrict clearances, they are particu- should be brought to the attention of the engineer
larly vulnerable to damage from high loads. for proper evaluation.
f. Where lateral bracing is welded to girder (4) Check the area around the floorbeam con-
flanges, inspect the weld and flanges for cracking. nection for cracks due to out-of-plane bending of
g. Observe transverse vibration or movement of the floorbeam and for cracks in rivet and bolt
the structure under traffic to determine adequacy heads due to prying action.
of lateral and sway bracing. (5) Check for corrosion sites with potential
loss of section. This is particularly important in
8-14. Tied arches the inside of box-shaped members.
b. Welded members. These members must be
The stability of these types of arches is dependent thoroughly inspected from the inside as well as the
upon the structural tie which is in tension. There- outside. The key locations in the tie girder are the
fore, the tie is always classified as a fracture floorbeam connections, the hanger connections,
critical member. The tie is the box member and the knuckle area (area at the intersection of
stretching horizontally between bearings. The ma- the tie girder and the arch rib). The inspection
jority of tied arch bridges built in the last decade steps should include the following:
have experienced some problems in the tie. (1) Check all welds carefully for the entire
a. Riveted or bolted members. As with any FCM, length of the member. This applies primarily to
the advantage of a riveted or bolted member is the corner welds where the web and flange plates
8-16
TM 5-600/AFJPAM 32-1088
are joined. Depending on the results of the corner connects to the tie and, ordinarily, the floorbeams
weld inspection, it may be desirable to remove the at the same location.
backing bars and reexamine the welds. All fillet (7) The knuckle area at the intersection of the
welds inside the girder should be inspected visu- arch tie and arch rib is extremely complicated
ally as accessible. Wire brushes should be used to structurally and physically. Considerable study
clean the welds as necessary. The inspector should may be necessary to determine how to inspect all
of the necessary locations in this area. Again, it
look for triaxial intersecting welds, irregular weld
may be necessary to use mirrors or devices. Also,
profiles, and possible intermittent fillet welds
dye penetrant testing should be used in this area
along the backup bars. if any suspicious crack-like formations are ob-
(2) Locate and inspect all the internal dia- served.
phragms and transverse butt welds. It may be (8) At floorbeam connections and any splice
necessary to clean the welds using a power wire points where the splices have been made with
brush. bolts, all of the bolts should be checked for tight-
(3) Check transverse connections at floorbeam ness.
with particular care. The usual location of the
8-15. Metal bearings
crack is near the corners, particularly if there is
any gap between the floorbeam diaphragm and the In examining these types of bearings, determine
web plates. This is a good place to clean with a initially whether they are actually performing the
functions for which they have been designed.
power wire brush and use a dye penetrant test to
Bearings should be carefully examined after un-
ascertain the presence of cracks.
usual occurrences such as heavy traffic damage,
(4) If the box section has been welded with
earthquakes, or batterings from debris in flood
backup bars in the corners, as is often the case,
periods. Bearings should be inspected for the fol-
the backup bars should be carefully examined for lowing (refer to figure 8-26):
any breaks or poor splices. a. Check to ensure that rockers, pins, and roll-
(5) Portions of members that are difficult to ers are free of corrosion and debris. Excessive
access must be checked for corrosion using mirror, corrosion may cause the bearing to “freeze” or
fiberscopes, or boroscopes. lock and become incapable of movement. When
(6) Hanger connections should each receive a movement of expansion bearings is inhibited, tem-
thorough and detailed check. The purpose is to perature forces can reach enormous values.
locate cracks or local distortions and to evaluate b. Check rocker bearings where slots are pro-
the extent of rusting or deterioration. These con- vided for anchor bolts to ensure that the bolt is not
nections are where the support from the arch rib frozen to the bearing.
8-17
TM 5-600/AFJPAM 32-1088
c. Check for dirt and corrosion on the bearing from the creep effect of the bridge.
surfaces of rockers and rollers and the deflection
8-16. Elastomeric bearings
slots around pins.
d. Determine whether the bearings are in a. Check for splitting or tearing either verti-
proper alignment, in complete contact across the cally or horizontally. This is often due to inferior
bearings surface, and that the bearing surfaces are quality pads (figure 8-27).
clean. b. Check for bulging caused by excessive com-
e. Check barriers that require lubricants for pression. This may be the result of poor material
proper functioning to ensure adequate and proper composition.
lubrication. c. Check for variable thickness other than that
f. In those cases where bronze sliding plates are which is due to the normal rotation of the bearing.
used, look for signs of electrolytic corrosion be- d. Note the physical condition of the bearing
tween the bronze and steel plates. This condition pads and any abnormal flattening which may
is common on bridges that are located in salt-air indicate overloading or excessive unevenness of
environments. loading.
g. Detection of bearing rattles under live load
conditions usually indicates that the bearings are 8-17. Decks
loose. Determine the cause of this condition. a. Concrete decks. Check for cracking, scaling,
h. Check anchor bolts for looseness or missing and spalling of the concrete and record the extent
nuts. of the deterioration. Refer to chapter 5 for guid-
i. Measure the rocker tilt to the nearest 1/8-inch ance in recognizing and describing concrete deteri-
offset from the reference line as shown in figure oration.
8-26. The appropriate amount of rocker tilt de- (1) Deck surface. Note the type, size, and
pends upon the temperature at the time of obser- location of any deck deterioration.
vation. Most rockers are set to be vertical at 68°F (2) Deck underside. Inspect the underside of
for steel bridges. Record the temperature at the the deck for deterioration and water leakage. The
time of inspection. passage of water through the deck usually causes
j. Measure the horizontal travel of the sliding some leaching of the concrete which forms grayish-
bearings to the nearest 1/8 inch from the reference white deposits of calcium hydroxide in the area of
point. The two punch holes are aligned vertically the leak known as efflorescence (figure 8-28).
at the standard of temperature used (usually Extensive water leakage may indicate segregated
68°F). Record the temperature at the time of or porous concrete or a general deterioration of the
inspection. deck. Areas of wet concrete are additional indica-
k. On skewed bridges, bearings and lateral tions of defective concrete.
shear keys should be checked to determine if (3) Wearing surface. Examine the wearing sur-
either are binding or if they have suffered damage face covering the concrete deck for reflection crack-
8-18
TM 5-600/AFJPAM 32-1088
ing and for poor adherence to the concrete. Deteri- surface of the coarse aggregates to the polishing
orated concrete beneath the wearing surface will action of rubber tires. The resulting slippery sur-
often be reflected through the surface in the form face becomes increasingly hazardous when the
of map cracking. Poor adherence leads to develop- surface of the limestone is wet.
ment of potholes. If deterioration is suspected, (5) Stay-in-place forms. If deterioration is sus-
remove a small section of the wearing surface to pected, remove several panels of the forms to
check the condition of the concrete deck. permit examination of the underside of the deck.
(4) Wear. Determine whether the concrete sur- Rusty forms (figure 8-29), water dripping from
face is worn or polished. When softer limestone pinholes in the form, or the separation of portions
aggregates are used in the concrete, fine aggre- of the forms from the deck are reliable indications
gates and paste will be worn away, exposing the of deck cracking.
8-19
TM 5-600/AFJPAM 32-1088
(6) Reinforcing steel. Note whether there are bump at the back wall can result from substruc-
any stains on the concrete which would indicate ture movements. Joints should be cleaned, filled
that the reinforcing steel is rusting. Note whether and sealed to prevent seepage of water into the
any of the reinforcing steel is exposed. subgrade. This seepage causes subgrade failure
b. Timber decks. and allows earth or debris to plug the joints and
(1) Deterioration. Check for loose, broken, or prevent closing in hot weather. The crowding of
worn planks, for loose fasteners, and for presence abutments against the bridge ends is common and
of decay particularly at the contact point with the can cause severe damage to the bridge. Proper
stringer where moisture accumulates. Check as- opening size depends on the season, the type of
phalt overlays for the presence of potholes and joint seals, the temperature range, and the amount
cracking as a result of weak areas in the deck. of slab expansion that must be accommodated by
(2) Traffic response. Observe the timber deck the joints. Normal temperature is usually assumed
under passing traffic for looseness or excessive to be 65 to 70°F. Table 8-1 lists some general data
deflection of the members. for various types of expansion joints. The expan-
(3) Slipperiness. Timber decks are sometimes sion length in table 8-1 is the portion of deck or
slippery, especially when wet. Observe the traction structure expansion that must be accommodated
of vehicles using the bridge for signs of this by the joints. This distance may extend from the
condition. end of the bridge to the nearest fixed bearing, or it
(4) Utilities. If utilities are supported by the may be the sum of the distance on both sides of
bridge, note the effects on the bridge. the joint. Multiplying the expansion length by the
c. Steel decks. differential between the temperature at the partic-
(1) General. Check for corrosion and cracked ular moment and 68°F and this product by
welds. Maintenance of an impervious surface over 0.0000065 will give the approximate change in
a steel deck is an important safeguard against joint opening from the values listed. Very often,
corrosion of the steel. Check to determine if the construction plans will give useful data concerning
deck is securely fastened. Note any broken welds the setting of expansion devices.
or clips. Determine if there is any loss of section
due to rust or wear.
(2) Slipperiness. Note whether decks are slip-
pery when wet.
(3) Utilities. If utilities are supported by the
bridge, note any effect on the bridge.
d. Open-grating decks.
(1) Cracks. Examine the grating, support
brackets, and stringers for cracking or welds.
(2) Slipperiness. Note whether decks are slip-
pery when wet. Small steel studs may be welded to
the grating to improve traction.
8-20
TM 5-600/AFJPAM 32-1088
b. Check seals for water tightness and general (6) Examine all handrail joints to see that
conditions. Look for: they are open and functioning properly.
(1) Seal or sealant pulling away from the (7) Examine all handrails to see that they are
edges of the joints. of adequate height, secure, and relatively free of
(2) Abrasion, shriveling, or other physical de- slivers or any projections which would be hazard-
terioration of the seal. ous to pedestrians.
(3) Stains and other signs of leakage under- (8) Check for rust stains on the concrete
neath the deck. Leaking seals permit water and around the perimeter of steel rail posts which are
brine to flow onto the bridge seat and pier cap set in pockets. Remove grout from around the
causing corrosion of the bearings, disintegration of posts and determine severity of corrosion if rust
the concrete, and staining. Joints not properly stains indicate such action is warranted.
sealed should be cleaned and resealed. (9) Note whether barrier railings on the ap-
c. Check to see that expansion joints are free of proaches to the bridge extend beyond the end of
stones and other debris. Stones lodged in the joints the bridge railing or parapet end and are anchored
can create localized stresses which may cause to the inside face (figure 8-31). This feature
cracking and spalling of the deck. Large amounts reduces the severity of vehicle collision. In situa-
of debris cause jamming, thus rendering the joints tions where parapet ends are unprotected and no
ineffective. approach rail exists, a flared, tapered approach
d. Examine steel finger-type joints and sliding railing should be installed. On two-way bridges,
plate joints for evidence of loose anchorages, crack- this type of railing should be installed at both
ing or breaking of welds, or other defective details. ends of the existing railings or parapet.
Sometimes the fingers may be damaged by traffic (10) Examine barrier railings for traffic dam-
or by cracks which have developed at the base of age and alignment.
the fingers. (11) Check concrete barrier railings for cracks,
e. Verify that surfacing material has not spalls, and other deterioration.
jammed the finger joints on bridges that have been (12) Check for corrosion in the metal portions
resurfaced several times. of barrier railings and determine whether the
f. Examine specifically the underside of the anchor bolts and nuts are tight.
expansion joint, regardless of accessibility, to de-
tect any existing or potential problem.
g. Sound the concrete deck adjacent to all ex-
pansion devices for voids or laminations in the
deck.
8-19. Railings, sidewalks, and curbs
a. Railings.
(1) Inspect all railings for damage caused by
collision and for weakening caused by some form
of deterioration.
(2) Check concrete railings for cracking, disin-
tegration, and corrosion of rebars.
(3) Check steel and aluminum railings for
loose posts or rails and for rust and other deterio-
ration. In particular, check the condition of the
connections of the posts to the decks, including the
condition of the anchor bolts and the deck area
around them.
(4) Check timber railings for decay, loose con-
nections, and for missing or damaged rails.
(5) Check the vertical and horizontal align-
ment of all handrails for any indications of settle-
ment in the substructure or any bearing defi-
ciencies. Figure 8-31. Unprotected parapet end of a bridge.
8-21
TM 5-600/AFJPAM 32-1088
8-22
TM 5-600/AFJPAM 32-1088
taken in a radial pattern around the large river required signing and the condition of the existing
piers. signs should be noted during the inspection. For
(3) Shore and bank protection. civilian traffic, the AASHTO “Manual on Uniform
(a) Examine the condition and adequacy of Traffic Control Devices” should be consulted for
existing bank and shore protection. specific information with regard to signing. Mili-
(b) Check for bank or levee for erosion tary signing should be inspected according to the
caused by improper location or skew of the bridge following guidelines:
piers or abutments. a. Type of signs. When inspecting a bridge for
(c) Note whether channel changes are im- signing, not only should the presently posted signs
pairing or decreasing the effectiveness of the be inspected, but it should also be determined
present protection. whether additional signs are needed because of
(d) Determine whether it is advisable to add changed bridge or roadway conditions. The types
more channel protection or to revise the existing of warning and regulatory signs normally required
protection. are:
f. High backwater. Be particularly alert for loca- (1) Weight limit. This is the most important
tions where high fills and inadequate or debris- inspection item, particularly for the older and
jammed culverts may create a very high backwa- deteriorated bridges. The weight limit should be
ter. The fill acts as a dam, and with the possibility determined by the bridge classification procedure
of a washout during rainfall, a disastrous failure outlined in chapter 9. Depending upon the bridge
could result. type and expected traffic, the bridge may need
g. Wave action. Observe the effect of wave ac- both military and civilian load classifications. Typ-
tion on the bridge and its approaches. ical military load classification signs are shown in
h. Existing or potential problems. Observe the figure 8-33. Civilian load limit signs should be in
areas surrounding the bridge and its approaches accordance with the local legal requirements and
for any existing or potential problems, such as ice with AASHTO “Manual on Uniform Traffic Con-
jams. trol Devices.”
i. Spur dikes. Observe the condition and func- (2) Overhead clearance. Minimum overhead
tioning of existing spur dikes. clearances for military vehicles (as summarized in
table 8-2) should be checked. When the overhead
8-23. Paint
a. Examine all paint carefully for cracking or
chipping, scaling, rust pimples, and chalking. Look
for evidence of “alligatoring.” If the paint film has
disintegrated, note whether the prime coat or the
surface of the metal is exposed. Note the extent
and severity of the paint deterioration. If extensive
“spot” painting will be required, probably the
entire structure should be repainted; otherwise,
spot painting will most likely be sufficient. a. b.
b. Look for paint failure on upper chord horizon-
tal surfaces, or those surfaces which are most
exposed to sunlight or moisture. Give particular
attention to areas around rivets and bolts, the
ends of beams, the seams of built-up members, the
unwelded ends of stiffeners, and any other areas
that are difficult to paint or that may retain
moisture.
8-24. Signing
This section is concerned with the presence and
effectiveness of bridge signing. Since some bridges
on military installations must carry both military
and civilian traffic, signing may be necessary for
both types of traffic. The required regulatory
signing for the bridge to be inspected should be
determined prior to the inspection. The absence of Figure 8-33. Typical military load-class signs.
8-24
TM 5-600/AFJPAM 32-1088
Table 8-2. Minimum overhead clearances for bridges markings should be placed on the abutment walls
Bridge Class Minimum Overhead Clearance
and on pier edges of civilian bridges. Reflective
hazard markers should also be placed on the piers
4-70 14’ 0”
and abutments, and the approaching pavement
71-over 15’ 6” should be appropriately marked to warn the ap-
proaching traffic of the hazard.
(5) Speed and traffic markers. These types of
clearance is less than the values prescribed in the signs should be checked to ascertain whether they
table, the actual clearance must be indicated by are appropriate. Speed restrictions should be care-
the use of a telltale sign as shown in figure 8-34. fully noted to determine whether such restrictions
Civilian traffic bridges with clearance restrictions are consistent with bridge and traffic conditions.
should be marked as shown in figure 8-35. For Additional traffic markers may be required to
civilian traffic, any clearance that is less than 1 facilitate the safe and continuous flow of traffic.
foot higher than the local legal height and road b. Details of military signs.
limit should be posted with a “Low Clearance” (1) Circular signs. Both military and civil
sign. Where existing civilian signs are in place bridges should be marked with circular signs indi-
cating the military load classification. They should
and are sufficiently clear, additional clearance
have a yellow background with black inscriptions,
signs (vertical or horizontal) for military vehicles
as large as the diameter of the sign allows. These
are not required.
signs should be placed at both ends of the bridge
(3) Roadway width. Bridge width limitations in a position that is clearly visible to all oncoming
often limit the maximum class of military vehicle traffic. The required sizes and appearance for
for the bridge. Minimum lane widths for specific these signs are summarized in figure 8-33.
bridge classes are summarized in table 8-3 and (2) Rectangular signs. Additional instructions
should be checked during the inspection. Many and technical information are inscribed on rectan-
new bridges are narrower than they should be. For gular signs. These signs should be a minimum of
civilian bridges, “Narrow Bridge” signs and 16 inches in height or width and have a yellow
striped paddleboards (figure 8-35) should be used background upon which the appropriate letters,
when the bridge width is less than that of the figures, or symbols are inscribed in black. These
approach roadway. If the superstructure or parapet signs, other than those indicating height restric-
end extends above the curb, it should be striped tions, should be placed immediately below the
and a reflectorized hazard marker should be at- bridge classification signs. Height restriction signs
tached. should be placed centrally on the overhead ob-
struction.
(4) Narrow underpass. Where the roadway
c. Details of civilian signs.
narrows at an underpass or where there is a pier
(1) Location. The weight limit sign, being
in the middle of the roadway, striped hazard
regulatory, should be located just ahead of the
8-25
TM 5-600/AFJPAM 32-1088
Table 8-3. Minimum lane widths for bridges tion and/or painting are required for night visibil-
Minimum Width Between Curbs ity.
Bridge (b) Legibility. Note whether the legend is
Class One Lane Two Lane
difficult to read. This may be because of dirt
4-12 9' 0" 18' 0"
encrustment, dulled paint, inadequate lettering, or
13-30 11' 0" 18' 0" inadequate sign size. Refer to the AASHTO
31-60 13' 2" 24' 0" “Manual on Uniform Traffic Control Devices” for
61-100 14' 9" 27' 0" guidelines as to criteria to be followed in evaluat-
ing sign legibility.
(c) Vandalism. Bullet holes, paint smears,
bridge. Lateral clearance of the sign should be campaign stickers, etc. should be noted.
determined by the requirements of the highway (d) Minimum sizes. In general, most warn-
type. On heavily traveled roads (such as freeways), ing signs are diamond-shaped and measure at
side-mounted signs should be: least 30 by 30 inches. “Low Clearance” signs are
(a) Positioned 30 feet from the edge of the 36 by 36 inches. The “Weight Limit” signs are
travel way. rectangular with minimum dimensions of 18 by 24
(b) Located behind a barrier, guardrail. inches.
(c) Affixed to a breakaway installation. (e) Vegetation. On minor roads, heavy vege-
On less traveled roads, signs should preferably be tation growth may obscure signs. Note the type
located behind a barrier guardrail or be affixed and location of such vegetation so that it may be
to a breakaway standard. Any sign support of trimmed or removed entirely. If relocation of the
sufficient mass to be a hazard, which does not sign(s) is necessary, include such remarks in the
inspection report.
meet the preceding criteria, should be noted and
(f) Sign support damage. Note whether sign
reported.
supports are bent, twisted, or otherwise damaged.
(2) Condition. It is important that all caution
signs be in good condition. Evaluation of the 8-25. Utilities
condition and adequacy of the signing will depend a. Check pipe, ducts, etc., for leaks, breaks,
upon the conditions prevailing in a given area. It cracks, and deteriorating coverings.
is suggested that the AASHTO “Manual on Uni- b. Check the supports for signs of corrosion,
form Traffic Control Devices” be consulted for damage, loose connections, and general lack of
specific information with regard to signing. Signs rigidity. If utility mounts rattle during passage of
should be checked for: traffic, especially on steel bridges, note need for
(a) Reflectorization. Adequate reflectoriza- padding.
8-26
TM 5-600/AFJPAM 32-1088
c. Check the annual space between pipe and (b) At the base of standards, especially the
sleeve or between the pipe and the blocked-up area cast elements.
for leaks where utilities pass through abutments. (3) Corrosion. Check steel standards for rust-
d. Check for leaky water or sewer pipes for ing and concrete standards for cracking and spal-
damage. ling.
e. Inspect the area under water or sewer pipes b. Electrical systems. This part of the inspection
for damage. should be made by or with the assistance of a
f. Determine whether mutually hazardous trans- qualified electrician.
mittants, such as volatile fuels and electricity, are (1) Wiring. Observe any exposed wiring for
sufficiently isolated from each other. If such utili- signs of faulty, worn, or damaged insulations. Note
ties are side-by-side or in the same bay, report this and report the following:
condition for auxiliary encasement or future relo- (a) Bad wiring practices.
cation. (b) Bunches of excess wires.
g. Check utilities that are located beneath the (c) Loose wires.
bridge for adequate roadway clearances. (d) Poor wire splices.
h. Determine whether any utility obstructs the (e) Inadequate securing of groundlines.
waterway area or is positioned so that it hinders (2) Junction boxes. Check inside junction
drift removal during periods of high water. boxes for excessive moisture, drain hole, poor wire
i. Check the encasement of pipes carrying fluids splices, and loose connections. Note the condition
under pressure for damage, and check vents or of wiring and insulation. Where the base of the
drains for leaks. light standards contains a junction box, examine
j. Check for the presence of shutoff valves on
this as well. Note whether the junction box, outlet
pipelines carrying hazardous pressurized fluids,
box, or switch box covers are in place.
unless the fluid supply is controlled by automatic
(3) Conduit. Check conduits for rust or miss-
devices.
ing sections. Check the curbs and sidewalks for
k. Note whether any utility is located where
there is a possibility that it may be struck and large cracks that might have fractured the conduit
damaged by traffic or by ice and debris carried by imbedded in them. Note whether the conduit
high water. braces and boxes are properly secured.
l. Determine whether utilities are adequately (4) Whiteway current. On those structures
supported and whether they present a hazard to where the whiteway current is carried over an
any traffic which may use or pass under the open line above the sidewalks, check for hanging
bridge. objects such as fishing lines and moss.
m. Check for wear or deteriorated shielding and c. Lamps or damaged standards. Note any miss-
insulation on power cables. ing or damaged standards. A cover placed over the
n. Check for adverse effect utilities may have on electric eye controller will turn on the lights. Note
the bridge, e.g., interferences with bridge mainte- the number and the locations of those lights that
nance operations or an impairing of structural do not illuminate.
integrity. d. Sign lighting. Inspect sign lighting for the
o. Check whether vibration or expansion move- same defect as conventional lighting.
ments are causing cracking in the support mem- e. Navigation lights.
bers. (1) Lights. Check to determine whether all of
p. Check supporting members of the bridge for the required navigation lights are present and
paint damage. properly located. For fixed bridges, a green naviga-
q. Note any adverse aesthetic effect utilities tion light is suspended from the superstructure
may have on the bridge. over the channel centerline and red lights are
placed to make the channel edges. When piers are
8-26. Lighting situated at the channel edges, the red lights are
a. Whitewuy lighting. positioned on the piers or fenders. For movable
(1) Collision. Note any light poles that are spans, navigation lighting requirements vary ac-
dented, scraped, cracked, inclined, or otherwise cording to the bridge type. When in doubt as to
damaged. the requirements, refer to Section 68 of the Coast
(2) Fatigue. Aluminum light standards and Guard Pamphlet CG204, “Aids to Navigation.”
castings are most likely to suffer from fatigue. (2) Lighting devices. Check the overall condi-
Check for cracking in: tion of lighting and devices to determine whether
(a) Mast arms and cast fitting on standards. they are rusted, whether any of the lenses are
8-27
TM 5-600/AFJPAM 32-1088
broken or missing, and whether the lights are points of the superstructure. For longer struc-
functioning correctly. tures, the red lights should be placed at 150- to
(3) Wiring. Check the condition of wiring, 600-foot intervals, while sets of at least three
conduits, and securing devices to determine flashing red beacons should be mounted atop the
whether they are loose or corroded. peaks of widely separated high points such as
f. Aerial obstruction lights. For short bridges suspension bridge towers, truss cusps, etc. Check
(less than 150 feet), there should be at least two these lights for proper maintenance and function-
continuous glow red lights mounted at the high ing.
(mud), and other foreign materials. The ballast stringers in open deck bridges should be checked
materials should not be at a level above the top of for deterioration and sufficient tightness. Any tie
the ties. that is not materially defective (paragraph
c. Ballast deck bridges are normally equipped 8-30e(2)), but does not fully support both rails,
with drainholes to allow water to drain from the should be noted and recommended for tamping up
bridge deck. Check these holes to make sure they and respiking.
are open and free draining. (2) Typical tie defects are shown in figure
d. Walkways or walkboards along an open deck 8-36 and a tie should be considered defective (and
bridge should be maintained to allow for safe noted) if it is:
walking over the structure. Check for loose, bro- (a) Broken through.
ken, deteriorated, or missing boards. (b) Split or otherwise impaired to the extent
e. The ties should be inspected as follows: that it will not hold spikes or other rail fasteners.
(1) Note the size, spacing, and uniformity of (c) So deteriorated that the tie plate can
bearing of all ties. In a ballast deck bridge, make move laterally more than ½ inch relative to the
sure all of the ties are fully ballasted and well crosstie.
bedded. Bolts that secure the ties to the bridge (d) Cut by the tie plate more than 2 inches.
8-29
TM 5-600/AFJPAM 32-1088
(e) Cut by wheel flanges, dragging equip- Table 8-4. Operating restrictions
ment, fire, etc. to a depth of more than 2 inches Number of
within 12 inches of the base of the rail, frog, or Consecutive
load-bearing area. Defective Ties Operating Restrictions
(f) Rotted, hollow, or generally deteriorated 0 to 2 None
to a point where a substantial amount of the 3 Limit maximum speed to 10 mph
material is decayed or missing.
4 Limit maximum speed to 5 mph
(3) The occurrence of consecutive defective ties
in categories 1 and/or 2 requires operating restric- 5 or more No operation
tions as specified in table 8-4.
(4) All track joints should be supported by at
least one nondefective tie whose centerline is previously discussed for roadway bridges with the
within 18 inches of the rail ends as shown in following exceptions:
figure 8-37. At any location where a rail joint is a. When possible, the movement of the super-
not supported by at least one nondefective tie, structure during passage of a train should be
operations should not exceed 10 miles per hour observed. Note excessive movements, rattles, and
(mph). vibrations.
(5) If the existing tie spacing averages greater b. Observe all members to determine if any are
than 22 inches within the distance of a rail length, broken or moved out of proper position and
the desired spacing should be established during whether all fastening devices are functioning prop-
the next major maintenance cycle. For track con- erly.
structed with an average tie spacing greater than c. Check all stringers for soundness and surface
22 inches, the desired spacing should be estab- defects. Note their size and type and the number
lished during the next track rehabilitation. used in each panel. Note if the bearing is sound
(6) Missing or skewed (crooked) ties are unde- and uniform, if all stringers are properly chorded
sirable in track. At any location where the center- and securely anchored, and if all shims and block-
to-center tie spacing measured along either rail ing are properly installed. Note whether packers
exceeds 48 inches, operations shall not exceed 10 or separators are used and the condition of all
mph until additional tie support is provided, or chord bolts.
skewed ties should be straightened during the d. With timber trestles, fire protection is very
next track rehabilitation. important. The following items should be in-
spected:
8-31. Superstructure inspection (1) Note whether the surface of the ground
The inspection procedures for the superstructure around and beneath the structure is kept clean of
portion of railroad bridges are the same as those grass, weeds, drift, or other combustible material.
8-30
TM 5-600/AFJPAM 32-1088
(2) Where rust-resisting sheet metal is used as bers, especially if the bridge is on a curve or the
a fire protection covering for deck members, note bent is more than 15 feet in height.
the condition of the metal and its fastenings. d. Check all fastening devices for physical con-
(3) Note if any other method of fire protection dition and tightness.
has been used, such as fire retardant salts, exter- 8-33. Recommended practices
nal or surface protective coatings, or fire walls.
The inspector’s outline of repairs should be based
Record such apparent observations as are perti-
on the following recommended practices. Refer to
nent to the physical condition and effectiveness of chapters 11 through 13 of this manual for specific
such protective applications. details for these repairs:
(4) Where water barrels are provided, note the a. Posting of the outside piles should not be
number, condition, if filled, and if buckets for permitted on bridges on curves where bents exceed
bailing are on hand. If sand is used, note whether 12 feet in height or on tangents where bents are
bins are full and in condition to keep the sand dry. over 20 feet in height.
(5) Note if timber, particularly top surfaces of b. On high-speed track where traffic is heavy,
ties and stringers in open deck bridges, is free not more than two posted piles in any one bent
from frayed fiber, punk wood, or numerous checks. shall be permitted. If more than two piles are poor,
all piles should be cut off to sound wood below
8-32. Substructure inspection groundline and a framed bent installed or piles
The inspection procedures for the substructure redriven.
portion of railroad bridges are the same as those c. All posts should be boxed, in addition to toe
nailing, to prevent buckling.
previously discussed for roadway bridges with the
d. When individual caps, sills, braces, or struts
following exceptions:
have become weakened beyond their ability to
a. When possible, the movement of the substruc-
perform their intended function, renewal is the
ture during passage of a train should be observed.
only remedy.
Note excessive vibration, deflection, side sway, and e. When only an individual stringer is materi-
movement at pier supports. ally deteriorated, an additional stringer may be
b. Examine all bents and towers for plumbness, installed, inside or outside of the chord, to aid the
settlement, sliding and churning, and give an weakened member.
accurate description of the nature and extent of f. Where piles are decayed at the top they may
any irregularities. Note particularly whether caps be cut off and double capped; a single pile may be
and sill have full and uniform bearing on the corbelled.
supports. g. Shimming of stringer to provide proper sur-
c. Note the number and kind of piles or posts in face and cross level should be done with a single
the bents or towers. Note the uniformity of spacing shim under each chord. If possible, avoid multiple
and the location of any stubbed or spliced mem- shimming.
flooding and flotation and displacement of part, or box. Such slides are likely to affect the box as
all, of the box. well.
f. Water leaving the box at high velocities may h. Check for cracks and spalls in the top slab.
cause downstream scour at the streambed. Longitudinal cracks indicate shear or flexure prob-
lems; transverse cracks indicate differential settle-
8-35. Inspection ment. Cracks in the sides may be from settlement
a. Check for sag of the culvert floor. In times of or from extremely high earth pressures. Note the
light flow, this may be noted by location of size, length, and location of the crack. Look for
sediment. Where there are several feet of water in exposed or rusty rebars.
the box, a profile of the crown may be taken. i. Where there is no bottom slab, look for under-
mining of side footings.
b. Check for sag in the profile of the roadway
j. Check for undermining at the ends of the box
overhead.
and under the wings.
c. Check for vertical differential settlement at
k. Examine the inside of the box for large
the expansion joints.
cracks and debris. This may indicate the need for
d. Check for transverse and longitudinal differ- a debris rack. Check the inlet end of the culvert
ential settlements at the expansion joints.
for debris. Note whether vegetation is obstructing
e. Check for widely opened expansion joints. the ends of the culvert.
Water may be seeping through joints from soil l. If the culvert floor is visible, check it for
outside. abrasion and wear.
f. Check for canted wingwalls. This condition m. Note any other signs of deterioration of the
may be due to settlement, slides, or scour. concrete box, especially those which suggest design
g. Check for slide failures in the fill around the error or construction omissions.
8-32
TM 5-600/AFJPAM 32-1088
CHAPTER 9
FINAL DOCUMENTATION
9-1. Annual (Army) and biannual (Air Force) d. Paragraph 4: Bridge Data. This paragraph
inspection documentation should provide the following information:
The results from these inspections are used to plan (1) Bridge data. Provide as follows:
and coordinate preventative maintenance opera- (a) Installation.
tions on the bridges. The inspection documentation (b) Bridge number. The official number as-
should include, but not be limited to the following: signed to bridge.
a. Jobsite inspection documentation. This docu- (c) Date of inspection.
mentation will generally be the bridge inspection (d) Inspected by.
notebook as discussed in chapter 7 or a copy of the (e) Location. Usually described by route
suggested format as shown in appendix B. number, county and log mile.
b. Photographs and sketches. Photographs or (f) Design load. The live loading for which
sketches of problem areas and of item requiring the bridge was designed will be stated if it is
maintenance should be included in the report. known. A structure widened or otherwise altered
c. Cost estimation. Cost estimation for each re- so that different portions have different live load
paired item should be provided so that installation designs is to have each live load specified.
engineers and maintenance personnel are able to (g) Military load classification.
use it for their maintenance and budget planning. (h) Date built.
d. Remarks and recommendations. A brief sum- (i) Traffic lanes. State the number of traffic
mary of the inspection findings should be made by lanes.
the inspector. Problem areas, those requiring im- (j) Transverse section. Include items noted
mediate attention, and those requiring additional below.”
attention from a structural engineer should be (k) Roadway width. This shall be the mini-
pointed out in this section. mum clear width between curbs, railings, or other
restrictions. On divided roadways, such as is found
9-2. Triennial (Army) and every third biannual on freeways under overcrossings, the roadway
(Air Force) bridge inspection documentation
width will be taken as the traveled way between
The results from these inspections are used both to shoulders, but the shoulders and median width
plan and coordinate preventative maintenance op- will also be given.
erations on the bridges and to insure their overall (l) Sidewalks. If only one is present, the side
safety. The documentation should generally be shall be noted thus: “1 @ 5.0’ (east).” Measure-
prepared by a qualified engineer who participated ment is recorded to the nearest one-tenth of 1 foot.
in the inspection. The inspection documentation Sidewalks on both sides are noted thus: “2 @
should include, but not be limited to the following: 5.0’.” If there are no sidewalks, note “None.”
a. Paragraph 1: Introduction and Background. (m) Clearances. A clearance diagram should
This paragraph must contain all the pertinent be made for each structure which restricts the
information for an inspection of a bridge: vertical clearance over the highway, such as over-
(1) The official request for conducting an in- crossings, underpasses, and through truss bridges.
spection. The minimum number of vertical measurements
(2) Individual conducting the inspection shown on the diagram will be at each edge of the
(name, position, and qualifications). traveled way and the minimum vertical clearance
(3) Criteria for an inspection (references and within the traveled way. The report will state the
documentation). minimum roadway clearance. This will include
b. Paragraph 2: Load Classification Summary. each roadway on a divided highway. When a
Load classification should be performed by a quali- structure is of a deck or point truss type so that no
tied engineer. vertical obstruction is present, the vertical clear-
c. Paragraph 3: Bridge Repair Cost Summary. ance shall be noted on the report as “unimpaired.”
The bridge repair costs in this paragraph are for Vertical measurements are to be made in feet and
the recommended maintenance and repairs which inches and any fraction of an inch will be dropped
should be accomplished over the next 2 years. The back to the nearest inch, i.e., a field measurement
estimated costs are based on the cost of materials of 15 feet, 7 3/4 inches will be recorded as 15 feet,
and labor required to complete the job. 7 inches. Horizonal measurements are to be re-
9-l
TM 5-600/AFJPAM 32-1088
corded to the nearest one-tenth of 1 foot. final portion of appendix C provides a space for
(n) Total length. This shall be the overall recommendations regarding deficient bridge com-
length to the nearest foot and shall be the length ponents.
of roadway which is supported on the bridge (4) Sketches.
structure. This will normally be the length from (a) Overall sketch. The first sketch schemat-
paving notch or between back faces of backwalls ically portrays the general layout of the bridge,
illustrating the structure plan and elevation data.
measured along centerline.
The immediate area, the stream or terrain obsta-
(o) Spans. The number of spans shall be
cle layout, major utilities, and any other pertinent
listed in the same direction as the log mile. Spans details should also be included.
crossing state highways will be normally listed (b) Bridge component sketches. These are
from left to right looking ahead on route. Spans necessary for a component condition rating of “6”
are noted as follows: e.g., “1 @ 24.0”’ or “3 @ or “7” (refer to appendix C).
45.0”’ or “1 @ 36.0’, 5 @ 50.0’, 1 @ 36.0’, 27.0’, (c) Substructures. Sketches or drawings of
12.0’.” Span lengths shall be recorded to the each substructure unit should be included. In
nearest one-tenth of 1 foot and it shall be noted many cases it will be sufficient to draw typical
whether the measurement is center to center (c/c> units which identify the principal elements of the
or clear open distance (clr) between piers, bents, or substructure. Each of the elements of a substruc-
abutments. Measurements shall be along center- ture unit should be numbered so that they can be
line. cross referenced to the information appearing on
(p) Skew. The skew angle is the angle be- the data page on the left-hand side of the sketch.
tween the centerline of a pier and a line normal to Items to be numbered include piling, footings,
the roadway centerline. Normally, the skew angle vertical supports, lateral bracing of members and
will be taken from the plans, and it is to be caps.
recorded to the nearest degree. If no plans are (d) Special sketches. Additional sketches
available, the angle is to be estimated. If the skew may have to be prepared of critical areas of certain
angle is 0 feet, it should be so stated. bridges.
(q) Plans available. State what plans are (5) Photos. At least two photographs of each
available, where they are filed, and if they are “as bridge, one showing a roadway view and one
built.” showing a side elevation view, should be provided.
(r) Inspection records. Record the year in- Other photos necessary to show major defects or
spected, inspector, and qualification. Under de- other important special features also may be in-
scription, briefly give all pertinent data concerning cluded. A photo showing utilities on the structure
the type of structure. The type of superstructure is desirable. All signs of distress, failure, or defects
will generally be given first followed by the type of worthy of mention, as well as description of condi-
piers and type of abutments along with their tion and appraisal, should be noted with sufficient
foundation. If the bridge is on piles, the type of accuracy so that another inspector at a future date
piles should be stated. If data are available, can easily make a comparison of condition or rate
indicate type of soil upon which footings are of disintegration. Photographs and sketches should
founded, maximum bearing pressures, and pile be used freely as needed to illustrate and clarify
capacities. conditions of structural elements. Good photos and
(2) Bridge component rating. Each component pictures are very helpful at future investigations
of the bridge should be numerically rated. A in determining progression of defects and to help
suggested format and rating system are provided determine changes and their magnitude. All rec-
in appendix C. ommendations and directions for corresponding
(3) Recommendations and repair costs. The repair and maintenance should be included.
9-2
TM 5-600/AFJPAM 32-1088
CHAPTER 10
Section I. INTRODUCTION
note: Chemical application is in pounds per mile of 2-lane road or 2 lanes of divided.
tant for moveable bridges that navigation lights, (2) Pull large pieces of debris clear with a
traffic control systems, and protective fender sys- crane.
tems be monitored regularly. This is a safety more (3) Clear large and small pieces of debris with
than a structural issue; however, it constitutes an a powerboat.
important component in providing a complete (4) Blast large jams to break them up.
maintenance program.
10-13. Bridge joint systems
10-11. Bearings and rollers a. General. Joints are designed to provide for
All rockers, pins, and rollers are to be kept free of rotation, translation, and transverse movements of
debris and corrosion, lubricated where necessary, the superstructure under live loading and thermal
and maintained in good working order. Depending expansion. The system should also prevent water
on the type of bearing (fixed or expansion), they leakage onto the components below the bridge
should permit the superstructure to undergo neces- deck. The two common joint systems are open and
sary movements without developing harmful over- closed joints.
stresses. A “frozen” or locked bearing that be- b. Open joints. The open joint provides for longi-
comes incapable of movement allows the stresses tudinal movement of the superstructure. The joint
generated to become excessive and may even cause construction is not watertight and should permit
a major failure in some affected member. traffic to cross smoothly.
(1) Finger joints. Interlocking steel fingers at-
10-12. Debris and removal
tached to a steel plate allow longitudinal but
a. Superstructure. Any debris left on the super- restrict transverse deck movements.
structure due to traffic or high water should be (a) Clogged joint and drain trough. Fre-
removed for safety reasons and to prevent deterio- quently flush and clean the joint and drainage
ration in areas were the debris will trap moisture system to remove debris accumulation in the
onto the superstructure. system. This will also help prevent corrosion and
b. Substructure. The substructure is susceptible concrete deterioration.
to debris or floating ice that forms drifts against (b) Loose joints. Remove loose or faulty bolts
its components. This can cause premature deterio- or rivets, reposition the expansion device, and
ration of these components and place excessive rebolt. It may be necessary to countersink the
lateral loads on the whole structure. The tech- bolts or rivets to avoid future problems.
niques available to remove drifts are: (c) Broken finger joints. Weld replacement
(1) Clear small debris with a pole or hook. fingers onto the joint.
10-3
TM 5-600/AFJPAM 32-1088
(d) Fingers closed. Trim the expansion fin- common failure associated with this joint sealant
gers or remove the system, reposition, and rein- and requires replacement of the deficient compres-
stall. sion joint sealant (figure 10-1).
(2) Armored joints. These consist of steel an-
10-14. Scour protection
gles at concrete edges which are left open or filled
with a mastic or other material to prevent intru- The excavation or removal of the soil foundation
sion of debris. If the joints are clogged, clean out from beneath the substructure undermines the
the joint, repair any broken angles, and apply a load carrying capacity of the bridge. It can also
liquid polyurethane or preformed compression joint cause excessive settlement if proper preventive
sealant for waterproofing and to prevent debris maintenance is not practiced. A foundation may be
intrusion. protected against scour in the initial design and
(3) Sliding plate. A horizontally positioned after construction has been completed.
steel plate is anchored to the deck and allowed to a. Design.
slide across an angle anchored to the opposite face (1) Locate bents and piers parallel to the
of the opening. direction of the water flow.
(a) Clogged expansion gap. Remove any dirt, (2) Use long piles driven to a depth which
debris, or asphalt from the gap to ensure that provides sufficient bearing and accounts for scour-
sliding plate interacts properly with its angle seat. ing.
(b) Joint closed. Trim the steel plate. (3) Drive a row of closely spaced fender piles
c. Closed joints. The closed joint is a watertight perpendicular to the stream flow at the upstream
arrangement of various materials which allow end of the substructure. This may not protect the
longitudinal movement of the superstructure. downstream end since eddies and increased veloc-
(1) Elastomeric. A sealed, waterproof joint sys- ity may produce erosion on the downstream end.
tem which uses steel plates and angles molded Their greatest effectiveness is for narrow piers and
into neoprene coverings to provide an anchorage larger spans structures.
and load transfer (figure 10-1). b. After construction.
(a) Faulty section. Remove and replace. (1) Place sandbags around the base of bents,
(b) Inadequate seal. Apply new sealant or piers, and abutments, particularly at the upstream
remove and reinstall using proper sealing tech- end.
niques. (2) Place riprap consisting of stones weighing
(c) Loose or broken bolts. Remove broken at least 50 pounds or bags filled with stones or
bolts and replace with “J” bolts. cement.
(2) Compression seal. Extruded neoprene with (3) Divert drainage lines when scouring is due
cross-sectional design and elasticity to provide for to local ground drainage or drainage from the deck
retention of its original shape. Leakage is the most itself.
10-4
TM 5-600/AFJPAM 32-1088
tasks generally involve repair to the foundation or columns of the system from the impact of the
substructure of the bridge. debris on the substructure. A common repair to
minimize this problem is to install dolphins and/or
10-16. Abutment stability fender systems upstream of the piers to adsorb the
a. In addition to providing end support for the energy of the physical contact with the drift and to
bridge deck, an abutment also acts as a retaining help break it up.
wall and is subject to horizontal earth pressures. a. Pile cluster dolphins. This type of dolphin
consists of a cluster of piles with the tops pulled
These pressures coupled with the dynamic loading
together and fixed into position (figure 10-3).
of vehicle traffic has the tendency to push out the
Dolphins can be constructed from:
abutment. If the abutment is unstable, it may be
(1) Timber. The top is lashed together with
shored or fixed using guylines from shore anchor- wire rope. Timber piles can be protected from
ages or a deadman tie-back system. impact damage by banding the piles with sheet
b. The procedure for this process is as follows metal.
(figure 10-2): Emplace a deadman or drive a pile (2) Steel tube. Dolphin system is connected
anchor approximately 3 feet on either side of the with bracing and fender arrangement.
approach to the bridge. These anchors should be (3) Caisson. Sheet-pile cylinders of large diam-
from 60 to 100 feet from the face of the existing eter filled with sand or concrete and topped with a
abutment. Drill a hole in the wing-wall on both concrete slab. Fendering can also be attached to
sides of the abutment and in a position outside the outside sheets, if needed.
and in line with the abutment cap. Run a restrain- b. Fenders. Fenders are designed to divert the
ing rod or cable from the deadman through the flow of drift and ice around the piers. These
hole in the wall. Place a beam (example: steel fenders generally form a wedge on the upstream
wafer) on the outside of the cap. The beam must side of the pier to divert the flow.
extend a distance at least greater than the posi- (1) Timber/steel bents. A series of piles with
tion of the drilled holes in the wingwall on both timber wales and braces are attached to the top
sides of the abutment cap. Connect the retain- portion of the bent system. The steel piles may be
ing rod or cable to the beam and place tension tied together using a concrete slab (figure 3-19).
on the rods or cables. This technique can be used (2) Steel or concrete frames. Steel or concrete
on smaller abutments to help draw the abutment frames are sometimes cantilevered from the pier
back to its original position and to hold it in place. and faced with timber or rubber cushioning to
reduce collision impact from surface craft and
10-17. Drift and floating ice debris.
Drift and floating ice place forces on the piers and (3) Timber grids. Timber grids, consisting of
frame bent of bridges. They can also cause struc- post and wales, are attached directly to the pier
tural damage to the cross section of the piles or (figure 3-19).
10-5
TM 5-600/AFJPAM 32-1088
c. Abutments. Scour around the base of abut- (1) Riprap (figure 10-8). Fill the scour hole
ments can be repaired in a similar fashion as the with riprap. Extend the riprap above the face of
pier footing as follows (figure 10-7): the concrete to protect from future scouring. Slope
(1) Shore up the abutment to prevent settle- the riprap level down from the edge of the protec-
ment during the repair, tor to the face of the concrete protector.
(2) Remove any loose material from the (2) Protector extension (figure 10-9). Remove
scoured area, loose material from the scour hole. Backfill with
(3) Set bolts into the abutment face along the sand or gravel. Form a ground mold in the backfill
length of the abutment. These bolts should extend for the extended slope protector. Place concrete
3 to 6 inches from the abutment face and be into the ground mold. Add the following steps for
spaced 2 feet apart. Use the bolts installed in step an undermine protector: cut a hole in the protector
3 to connect an expansion shield to the abutment. above the erosion cavity, backfill or grout through
Place concrete behind the shield to fill the erosion this hole, and repair the holes.
cavity and the space between the shield and
abutment face. Place riprap on a 2 to 1 slope to
10-19. Settlement
prevent future scouring.
d. Bank slope. Erosion under and around a Foundation settlement usually is caused by
concrete slope protector can be repaired using a structural failure of the foundation material or
riprap till or may require extending the protector. scour.
10-7
TM 5-600/AFJPAM 32-1088
10-8
TM 5-600/AFJPAM 32-1088
function in nearly the same manner as A-frames. ing existing capacity to be used for carrying
However, the reaction of the span is not that of a increased live load. Significant dead load reduc-
continuous span and must be analyzed as support tions can be obtained by removing an existing
bracing (figure 10-11, part b). concrete deck and replacing it with a lighter deck.
A reinforced concrete deck 8 inches thick weighs
10-23. Add stringers approximately 100 pounds per square foot. This
The addition of stringers may require respacing weight is compared to the weights of lightweight
existing stringers. The procedure increases the decks in table 10-2.
capacity of the existing deck and redistributes the
loads carried by the stringers. When the deck is 10-26. Posttensioned bridge components
not replaced, special techniques must be used to Posttensioning can be used to:
place the new stringers. With the increase of the a. Relieve tension, shear, bending, and torsion
load carrying capacity of the superstructure, it is overstress.
imperative to check the substructure for the same b. Add ultimate strength to the bridge struc-
loading conditions. ture.
c. Reverse displacements.
10-24. Strengthen piers d. Change simple span to continuous span be-
a. Add piles. Drive additional piles and tie into havior. Various methods and configurations for
the existing pier system. posttensioning are shown in table 10-3.
b. Add or increase a footing. Once the footing is
10-27. Strengthen individual members
established, columns can be added between the
new footing and the existing cap to provide a In many cases the bridge classification can be
greater column strength in the pier. increased by strengthening the individual mem-
c. Add or enlarge columns. The load carrying bers of the structure. The drawbacks to this
capacity of a pier or bent system can be increased method are that it generally increases the dead
by adding more columns or by adding material to load of the structure and the added material shall
the existing column cross sections. be considered effective in carrying the added dead
load and live load only. Methods for strengthening
10-25. Reduce deadload individual members are dependent upon the mate-
The live load capacity of a bridge can be increased rial type and are thus discussed in the following
by reducing the applied dead load, thereby allow- chapters.
A. A-FRAME B. KNEE-BRACES
Figure 10-11. Expedient methods of span length reduction.
10-10
TM 5-600/AFJPAM 32-1088
10-11
TM 5-600/AFJPAM 32-1088
Concentric Tendon
Relieves tension
members by applying
axial compression.
Polygonal Tendon
Induces axial com-
pression,nonuniform
negative bending in the
posttensioned region,
and shear opposite to
load shear.
Polygonal Tendon with a
Compression Strut
Similar to polygonal but
doesn't add axial
compression into the
existing structure.
King Post
Combination of eccen-
tric and polygonal ten-
don configurations. The
moment to axial force
ratio is large due to
the king post.
Queen Post-uses 2 post.
External Stirrup
Timber - S e c t . 1 3 - 7 c ( 2 )
Concrete - S e c t . 1 4 - 7 2 ( 1 )
Box beam - S e c t . 1 4 - 7 e ( 2 )
10-12
TM 5-600/AFJPAM 32-1088
CHAPTER 11
11-3. General and life cycle costs. The physical condition of the
a. Repair decision. Each repair decision must structure must first be determined by a detailed
carefully weigh the long-term operational require- inspection. The structural capacity of the steel
ments and existing environmental factors that can should be known. Once the physical condition of
help accelerate corrosion prior to evaluating initial the bridge is evaluated, a determination of
11-l
TM 5-600/AFJPAM 32-1088
whether damaged bridge components should be metal, the following rules are applied:
repaired or replaced is made. (1) Metal added to stringers, floorbeams, or
b. Common repairs. The most common steel girders shall be considered effective in carrying its
repairs are: portion of the live loads only.
(1) Adding metal to strengthen cross sections (2) New metal added to trusses, viaducts, etc.,
that have been reduced by corrosion or external shall be considered effective in carrying its portion
forces. of the live load only. The exception is when: The
(2) Welding or adding cover-plates to repair dead load stress is temporarily removed from these
structural steel cracks caused by fatigue and vehi- members until the new metal is applied, or the
cle loads. dead load stress is applied to the new metal when
(3) Retrofitting connections. it is applied.
c. Rules for adding steel. When steel members (3) The added material shall be applied to
are strengthened to carry a specified load, the produce a balanced section, thus eliminating or
permissible stresses in the added material must minimizing the effect of eccentricity on the
comply with the load design stresses. To properly strengthened member. Where balanced sections
analyze and design repairs that involve adding cannot be obtained economically, the eccentricity
11-2
TM 5-600/AFJPAM 32-1088
of the member shall be taken into account in distance (d) is less than 4,000 multiplied by t
determining the stresses. divided by Fy, where t = plate thickness in inches
(4) Strengthened members shall be investi- and Fy = yield stress in pounds per square inch.
gated for any decrease in strength resulting from This prevents local buckling of the attached plate
temporary removal of rivets, cover plates, or other when loaded in compression (figure 11-2). Apply
parts. In some cases falsework or temporary mem- paint or a corrosion protector to welded area and
bers may be required. Where compression mem- added steel.
bers are being reinforced, lacing bars or tie plates b. Rivets. Riveted connections can be repaired
shall be replaced before allowing traffic over the using many different methods. The most common
bridge. repair requirements are for loose or missing rivets
or an understrength connection. The repair tech-
11-4. Connections niques for each are as follows:
Primary connections involve the use of welds, (1) Loose or missing rivets. Clean working
bolts, or rivets. However, pin connections and surface. Replace all missing rivets with high-
threaded fasteners are used commonly in tension strength bolts of the same size and draw the nut
members. up tight. This will help support the connection
a. Welds. Electric arc welding may be employed during the repair operations. Tighten or remove
subject to the approval of the engineer. In general, and replace loose rivets with high-strength bolts or
welding can be used to repair broken or cracked new rivets. Work on only one rivet at a time to
welds, strengthen rivet connections, and add metal help maintain the proper load distribution to the
to existing steel members. rivets. Remove and replace high-strength bolts
(1) Broken or cracked welds. Remove all dirt, with rivets, one at a time, if the engineer requires
rust, and paint for a distance of 2 inches from the rivets for the repair work (high-strength bolts can
damaged weld. File or grind down the damaged be substituted for rivets). Check all bolts and/or
weld to ensure the weld will bond with the steel rivets to ensure tightness. Apply paint or corrosion
surfaces being welded together. For cracks, grind protector.
down the cracked weld until the crack is no longer (2) Understrength connection. Several options
visible then check the weld with dye penetrant to exist for an understrength connection:
ensure the crack has been completely ground out. (a) Rivets or bolts can be added to the
Replace the weld. Apply paint or a corrosion existing connection plate.
protector to welded area. (b) A longer connection plate can be added
(2) Welded rivet connections. Remove all dirt, to allow for more rivets.
rust, and paint for a distance of 2 inches from the (c) Larger rivets or bolts can be substituted
steel surfaces in which the weld is to be applied. for the existing ones.
Apply welds to join the steel surfaces. Where (d) Welds can be added to the connection
overstressed rivets/bolts can carry the dead load, plate of sufficient strength to carry impact and
the weld is designed to carry the impact and live live loads or the total load depending on the
loads. Where overstressed rivets/bolts cannot carry condition of the connection.
the dead load, the weld is designed to carry the c. Pin connection. The pin connections discussed
total load. Apply paint or a corrosion protector to herein refer to those used in tension members and
welded area. military assault bridges. The repair of such con-
(3) Added metal for strength. Clean the steel
surfaces in which metal is to be added and remove
any severely damaged or corroded steel portions.
Use welds to fill cracks and holes, to replace
removed steel portions, or to add coverplates to
strengthen individual members. With cracks, en-
sure the weld penetrates the full depth of the
crack. With holes, work the weld from the steel
surface to the center of the hole ensuring no voids
are allowed in the weld. Replace removed steel
portions with steel of the same strength, and, if a
torch is used to cut the steel, ensure the edges are
ground smooth to ensure a good welding surface.
When adding coverplates that will be subjected to
compression, ensure the maximum clear spacing Figure 11-2. Local buckling under compression.
11-3
TM 5-600/AFJPAM 32-1088
nections may involve the pin itself or the pin a. Bars. Structural bars can be either round or
housing. To repair or replace the pin or housing, rectangular and have a pin or threaded connec-
the load must be shifted from the connection tion. Repair of the bar itself involves tightening
through use of jacks or winches. The pin can then the bar to account for elongation, adding metal to
be removed from the housing. Repair the housing the eye of a pin connection, or splicing the bar to
using welds or by adding metal to build up the repair breakage.
(1) Tightening adjustable connections or turn-
connection, as necessary. The pin can either be
buckles. Clean the components and attempt to
replaced or a bolt of the same size can be used.
tighten the bar. If adjustments cannot be made,
The pin connection should be replaced with a adjustments can be made to the eyes or turnbuck-
welded or riveted connection if it is functioning as les can be added as follows:
a fixed connection or if the bridge is considered a (a) Adjustments to the eyes. For slack of less
permanent structure. than 1 inch, the pin connection can be shimmed to
d. Threaded fastener. Threaded fasteners are take up any slack between the pin and the eye of
used primarily in conjunction with a tension rod or the bar. Shimming is accomplished by removing
cable. Typical problems with these fasteners in- the pin from the housing and placing a metal
volve stripped threads, a rust frozen shaft, or a sleeve snugly around the pin and the inside of the
broken threaded shaft. eye of the bar. The metal sleeve will take up the
(1) Stripped threads. Remove the threaded slack between the pin and the eye of the bar.
shaft and rethread if necessary. Drill out the (b) Add turnbuckle. A turnbuckle can be
threads in the female housing. Place the rethread- added to a round bar which previously had no
ed shaft through the female housing and retighten adjustable tension system (figure 11-3). This is
the fastener with a bolt on the backside of the accomplished by cutting a section out of the
housing. existing bar, threading both adjacent ends of the
(2) Rust frozen shaft. Clean the shaft and cut, and screwing on a turnbuckle.
housing of external rust and apply a lubricant to (2) Broken/damaged bars. Repair broken or
the threads. Attempt to rotate the shaft; if the damaged bars as follows:
shaft still refuses to rotate, the fastener must be (a) Add turnbuckle. Cut out the damaged
replaced. Cut the threaded portion of the shaft area and use the same technique discussed in
from the tension member and splice a new paragraph 11-5a(1)(b) above.
threaded shaft to the member. Remove the frozen (b) Splice bars. Broken bars can be spliced
portion of the shaft from the housing using a by welding bars or plates on both sides of the
torch. Place a bolt on the backside of the housing damaged area as shown in figure 11-3. Bolts and
and pull the tension member tight. rivets can also be used if desired.
(3) Broken shaft. Splice the shaft as shown in (3) Reinforcement of eyebars with loop bars.
figure 11-3. Eyebars can be reinforced with loop bars in the
following manner. Release tension from the eye or
11-5. Repair of structural members consider the added metal for carrying live load and
Structural steel members are generally classified impact loading only. Weld a plate onto the exist-
by the function they perform. The primary mem- ing eyebar. This plate can be used to attach a
bers are tension members, compression members, supplemental eye (loop or forged bar which rein-
beams, and beam-columns. The repair of various forces the eye of the bar). Place loop bars around
structural members is discussed in the following the pin and weld to the steel plate (figure 11-4,
paragraphs. part a). Reapply tension and paint repaired area.
11-4
TM 5-600/AFJPAM 32-1088
(4) Reinforcement of eyebars with steel plates (c) Attach a plate to the bars below the
(figure 11-4, part b). Eyebars can be reinforced bottom flange.
with steel plates by the following procedure. Re- (d) Tighten the nuts on the top plate to
lease tension from the eye. Place a supplemental draw the bottom plate up tight to the bottom
eye around the existing eyebar. Slide a new plate flange and adjust the tension on the hanger.
between the arms of the supplemental eye. The (2) Once the temporary hanger is in place, the
thickness of the new plate should be equal to that connection can be cleaned and repaired as follows:
of the supplemental eye. Its width should be equal (a) Attach a safety cable to the outside
to the diameter of the pin for the approximate hanger and remove the hanger from the pins.
length of the arms of the supplemental eye, and (b) Clean the pins and hanger thoroughly
then it should widen to a width greater than the and repair any damage to these components.
existing eyebar. Its length should be determined (c) Spot paint the inside face of the hanger
by the load carrying capacity requirements of the with light layers of paint and allow time for the
welds. Weld the supplemental eye, new plate, and paint to dry while working on the pins.
eyebar together. Replace the pin, reapply tension, (d) Lubricate the pins and replace the
hanger.
and paint the repair.
(e) Repaint the outside face of the hanger.
b. Hanger plates. Pin and hanger connections
(f) Repeat the procedure for the inside
are especially vulnerable to corrosion, which may
hanger.
freeze the connection and increase the internal
(3) Remove the temporary hanger.
stresses in the hanger, causing cracks to form. If
c. Cable. The most common damage that occurs
the hanger must be removed for cleaning or to cable is fraying of the steel wires forming the
repair, a technique which can be used is: cable. Any repair requiring strengthening the
(1) Fashion a temporary hanger to support the damaged portion of the cable involves removing
dead load normally carried by the hanger. This the tension on the cable. There are three repair
can be accomplished as follows: techniques that can be used on damaged cables.
(a) Place a steel plate across the expansion (1) If the cable still retains adequate strength
dam on the road surface. The plate should have to carry its design loading despite the frayed area,
two holes running the length of the dam and at a then clip off the frayed wires, clean any rust and
distance slightly greater than the flange width of debris from the cable, and paint or wrap the
the girder apart. damaged portion of the cable with a protective
(b) Run two threaded bars capped with nuts coating.
through the holes to the bottom of the girder’s (2) If the cable requires strengthening, then
bottom flange. replace the cable, run an additional cable parallel
11-5
TM 5-600/AFJPAM 32-1088
to the existing cable to carry the balance of the flange, or the web of the member to increase the
load, or cut the cable and emplace a turnbuckle. load capacity of a steel member.
d. Rolled sections or plate girders. The most (c) Bridging or strengthening steel sections
common repairs to these sections are repairing damaged by corrosion or collisions (figure 11-5).
cracks in welds and strengthening the sections (3) Rules for using cover plates.
with cover plates. In some cases, bent steel sec- (a) When one or more cover plates must be
tions are repaired using a technique called struc- renewed, consideration must be made for replacing
tural steel flame straightening. the defective plates with one plate of adequate
(1) Crack repair. The typical cracks that occur size.
in rolled sections and plate girders are caused by (b) Cover plates should be connected by
fatigue and overloading. The cracks generally be- continuous fillet welds, high-strength bolts, or
gin in the flange and propagate through the flange rivets.
into the web. To properly repair these cracks, the (c) Where the exposed surface of old plates
cracks must first be closed and then a weld are rough or uneven from corrosion and wear, they
applied. The importance of closing the crack is to should be replaced with new plates.
ensure that the dead load is properly transferred (d) Welded cover plates should be of suffi-
across the entire cross section of the steel member. cient thickness to prevent buckling without inter-
There are various methods which can be used to mediate fasteners.
close these cracks: (e) Where the web was not originally spliced
(a) Posttensioning the member (see para- to resist moment, it may be spliced by adding
graph 11-10). cover plates or side plates.
(b) Jacking the load off the member (see (f) Where fatigue cracking can occur at the
paragraph 12-7). top of welds on the ends of the cover plate, it is
(c) Using a heated cover plate across the recommended that bolting be used at the cover
crack and following these steps. Weld a cover plate plate ends.
to the member along only one side of the crack. (g) When cover plates are used in compres-
Heat the cover plate to expand the plate’s length. sion members, care must be taken to maintain
While still heated, weld the opposite side of the symmetry of the section to avoid eccentrical load-
plate to the member and allow the plate to cool ings.
and contract. This will pull the crack together. (4) Alternative to cover plates. Where the cost
Weld the crack and apply a continuous fillet to the of removal and replacement of the deck would be
cover plate. excessive, as in ballasted-deck bridges, flange sec-
(2) Cover plates. The cover plate is a relatively tions may be increased by adding full-length longi-
easy and inexpensive technique to use in steel tudinal angles, plates, or channels just below the
repair. It can be used to bridge over a crack and flange angles. First remove the stiffener angles
transfer the dead load throughout the cross section and then replace them with new stiffeners after
of the steel member or to just add strength to the the flange steel is added (figure 11-6).
member’s cross section. A key dilemma when (5) Stiffeners. Stiffeners are used to reinforce
adding steel cover plates is the method used to areas of the beam which are suspectable to web
introduce dead load stresses into the new material. buckling (intermediate transverse stiffeners), con-
The most common method used with major mem- centrated loads greater than allowable stresses
bers (i.e., W-sections) is to calculate the amount of (bearing stiffeners), and web buckling due to bend-
shorting required to produce the dead-load stresses ing (longitudinal stiffeners).
in the existing member. Holes are drilled into the (a) Intermediate stiffeners. Additional stiff-
old and new members in such a way that the new eners may be added by riveting, high-strength
members will be shortened by drifting, as the bolting, or welding angles or metal plates perpen-
sections are bolted together. Another method is dicular to the top flange and web. These stiffeners
heating the cover plate after welding one end and should not be connected to the tension flange of
then welding the expanded plate into place as the member.
discussed. As the plate cools and contracts, (b) Bearing stiffeners. These stiffeners can
stresses will be added to the cover plate. Examples be reinforced by adding angles or plates to the
of various uses of the cover plate are: existing stiffeners, grinding the bearing ends of
(a) Extending an existing cover plate to the new parts to make them fit closely, or welding
bridge a welded crack (Refer to paragraph the bearing ends to the flanges.
11-4a(3)). (c) Longitudinal stiffeners. Stiffness may be
(b) Building up the bottom flange, top added to the member by bolting or welding longi-
11-6
TM 5-600/AFJPAM 32-1088
tudinal angles to the web of the steel mem- that additional steel support is required, cover
ber. plates can be added to the pile prior to placing the
(6) Piles. jacket or a reinforced concrete jacket can be
(a) When steel piles require additional sup- designed.
port or protection, an integral pile jacket can be (b) A procedure for installing an integral
placed around the steel piling. The encasement of pile jacket follows (figure 11-7). Sandblast the
the steel piles is accomplished by filling a fiber- surfaces clean of oil, grease, dirt, and corrosion
glass form with Portland-cement grout. After the (near white metal). Place the pile jacket form
concrete hardens, the fiberglass form remains in around the pile. Ensure standoffs are attached to
place as part of the jacket. The integral jacket the form. Seal all joints with an epoxy bonding
provides protection to steel piles above and below compound and seal the bottom of the form to the
the water. If the pile has deteriorated to the point pile. Brace and band the exterior of the form to
11-7
TM 5-600/AFJPAM 32-1088
hold the form in place. Dewater the form. Fill the as rolled sections discussed previously. A combina-
bottom 6 inches of the form with epoxy grout tion of cover plates, plates, angles, and other rolled
filler. Fill the form to within 6 inches of the top sections can be used to reinforce or strengthen the
with a Portland-cement grout filler. Cap the form built-up member. Adding metal to these sections
with a 6-inch fill of epoxy grout. Slope the cap to increases the cross-sectional steel area in tension
allow water to run off. Remove the external members, reduces the slenderness ratio in com-
bracing and banding and clean off the form of any pression members, and increases the sectional
deposited material. modulus in beams. Examples of strengthened
(7) Flame straightening. Flame straightening members are shown in table 11-1.
has been used for over 40 years to straighten bent f. Composite sections. Composite action is devel-
beams or align members for proper connections. oped when two load-carrying structural members
This process involves using “V” heats or triangle such as a concrete deck and the supporting steel
heats on flanges in conjunction with jacking de- beams are integrally connected and deflect as a
vices to shrink the beam in the desired direction. single unit. To ensure that no relative slippage
The “V” heat is not heated completely, nor is it occurs between the slab and beam, the beam’s
gone over again until cooled. The base of the “V” flange is imbedded into the concrete or shear
heat should not exceed 6 inches to avoid warping connectors are used to develop a composite action
of the flange. The heat used in the process should between the surfaces. Three areas may require
not exceed 1,200 o F and in most areas will proba- repair on a composite bridge: the concrete deck,
bly be less. It is usually necessary to heat the the steel beam, or the composite action between
webs of damaged beams in conjunction with the the deck and beam.
flange. Overheating and jacking can cause the (1) Concrete deck. Concrete deck damage or
flange to exceed its yield strength and move faults can decrease the bridge’s load capacity by
vertically, instead of the desired horizontal direc- reducing the composite action of the section. The
tion. For these reasons, this process should be concrete maintenance and repair techniques dis-
conducted with trained and qualified operators cussed in chapter 13 should ensure that the deck
only to direct and monitor all heats, jack place- will carry the compressive forces required by the
ments, and to supervise the program’s sequence of composite action.
events. (2) Steel beam. Any cracks or damage to the
e. Built-up sections. These sections are primarily steel section should be repaired (paragraph
used to form truss systems. Cracks due to fatigue 11-5d(1)) to ensure that, the correct composite
and overloading are repaired in the same manner action is received.
11-8
TM 5-600/AFJPAM 32-1088
(3) Composite action. Several repair tech- the concrete from around the shear connector.
niques exist to address the loss of composite Repair the existing connectors or replace with
action: welded studs. If welding is not feasible, high-
(a) Allow for noncomposite action. Build up strength bolts can be used as the shear stud as
the steel beam to carry the load neglecting com- demonstrated in figure 11-8. High-strength bolts
posite action. Angles can be added to the bottom of may also be added to increase the composite
the top flange, cover plates can be added to the action.
bottom flange, and/or stiffeners can be used to (c) Deck replacement. The deck can be com-
offset web buckling. pletely replaced to renew the bond between the
(b) Repair shear connectors. The composite concrete and the shear connectors. A new deck can
action of the section can be reactivated by repair- be poured or a new precast deck can be emplaced
ing the shear connectors in the following manner. with holes cast for the connectors, using grout in
Use bridge diagrams and plans to determine the the holes around the connectors (paragraph 11-9).
location and type of the shear connectors. Remove Note that the composite action is normally de-
ll-9
TM 5-600/AFJPAM 32-1088
whether the beam/deck system is composite or the lower portion of the beam (web and bottom
noncomposite. flange) from the fixed top flange. Grind the cut
a. Noncomposite beams. Place jacks under the area of the top flange smooth. Weld a new stringer
deck or under the beams that are not being to the old stringer top flange for continuity.
replaced and jack the deck off the beam to be
removed. Remove beam or repair the damaged end
of the beam. The beam may be cut to facilitate
removal. The beam may be jacked out of position
or a lift truck used to lower the beam. Lift or jack
the replacement beam into place. To use a lift
truck or cable system, a hole must be cut or drilled
into the deck to run the cable through. Position
the beam on the bearing plates, jack the deck
down onto the new beam and check for distress in
the beam and deck. Remove jacks, temporary
supports, and repair any holes in the deck.
b. Composite beams (figure 11-10). Use jacks to Figure 11-10. Replacement of a steel beam in a
lift the composite beam off its bearing. Burn or cut composite section.
d. Compute section properties as required. j. Check other design factors (beam shear, shear
e. Compute stress to be relieved by posttension- connectors, fatigue, deflection, beam flexural
ing at all critical locations. strength, other, as required).
f. Design posttensioning (tendon force, tendon 11-11. Truss systems
eccentricity, distribution of axial forces and mo-
These systems can be strengthened by adding sup-
ments, and tendon length).
plementary members to change to a stiffer system
f = FF (P/A) + MF (Pet/I) (eq 11-1)
or superposition another system onto the existing
where:
structure. In cases where the dead load is increased,
f = stress at extreme fiber the substructure must be checked to ensure that it
P = tendon force is adequate for the new loading requirements.
A = area of stringer (composite area if bridge a. Add supplementary members. This technique
is composite) is most often applied to Warren and Pratt trusses
e = eccentricity of tendon with respect stringer (figure 11-13). The most common use of supple-
or bridge mentary members is to reduce the unbraced length
c = distance to extreme fiber of the top chords in the plane of the truss.
I = stringer moment of inertia (composite sec- Additional lateral bracing may be required to
tion moment of inertia) reduce the effective length in the plane perpendic-
FF = force fraction (similar to load fraction for ular to the truss. The load capacity of the top
live load) chords in compression can be increased by 15 to 20
MF = moment fraction (similar to load fraction percent using this technique.
for live load) b. Doubling a truss.
g. Select tendons, accounting for losses and (1) Steel arch superposition on a through truss.
gains: A method of upgrading through-truss bridges is to
P adjusted = P / (1 - losses % + gains %) (eq 11-2) reinforce the existing truss with a steel arch
Assume a 4-percent loss for relaxation of tendon (figure 11-14). A lightweight arch superimposed
steel, 7-percent loss for potential error in distribu- onto the truss carries part of the dead and live
tion fractions, 2-percent loss for an approximate loads normally carried by the truss alone. The
10°F temperature differential between tendons truss provides lateral support to the arch. There
and bridge. Assume a 25-percent gain from truck are two methods of attaching the steel arch to the
live load. truss and both methods may require the end panel
h. Check stresses at all critical locations. verticals to be strengthened to ensure adequate
i. Design anchorages and brackets. Typical ones lateral support to the arch. In method 1, the
are shown in figure 11-12. Experience has shown existing floorbeams and stringers are assumed
brackets should be about 2 feet long. adequate to carry the increased live load. In this
11-12
TM 5-600/AFJPAM 32-1088
11-13
TM 5-600/AFJPAM 32-1088
CHAPTER 12
12-1. General pile to absorb the creosote, remove the ring, and
When adequately protected, timber is a very dura- cap the pile.
ble building material. The preventive maintenance (5) Debris. Accumulated debris should be re-
program for timber involves protection from water moved from any timber surface. Debris holds mois-
and insect damage and the repair of damage from ture which will penetrate into the timber member.
these sources and mechanical abrasion. (6) Bark. The bark of native logs should be
a. Water damage. Timbers placed on the ground removed if it is not removed during construction.
or at the waterline and continually exposed to wet This prevents moisture from being trapped be-
and dry cycles are subject to rotting. It is helpful tween the wood and bark.
to elevate these members with concrete footings or b. Insect attack. The insects that attack timber
enclose them in concrete. To prevent water from can be classified as either dry land insects (ter-
penetrating the wood, the timber itself must be mites, carpenter ants, and powder-post beetles) or
treated as well as any holes or sawed ends of the marine borers (wood louse or limnoria). The most
timber. common treatment for dry land insects is to
(1) Preservatives for timber treatments. The pressure treat the wood with the proper poison and
penetration of the preservative normally ranges keep careful watch for reinfestation. Marine borers
from 1 to 3 inches into the surface. commonly enter the wood through bruises, breaks,
(a) Creosote pressure treatment. This is the or unplugged bolt holes. The area of infestation
most effective method of protection for bridge generally runs from the mudline to the water level
timbers. at high tide. The best method of control of marine
(b) Pentachlorophenol (penta-oil treatment). borers is prevention of infestation. Preventive
This is a heavy oil solvent applied using pressure maintenance for marine borers is conducted for
methods. several different stages of infestation.
(c) Inorganic salt solutions. The salt solution (1) Prevent bruises. Install buttresses to pro-
is applied using pressure and provides less water tect the structural members from damage by wave
repelling than other treatments. The salt solution action, current flow, or floating debris.
can corrode any hardware used to construct the (2) Treat damaged wood. Plug or coat all
bridge. holes, bruises, and freshly sawed ends with heavy
(2) Holes. Anchor bolts, drift pins, and lag creosote.
bolts create holes where decay and deterioration (3) Flexible barrier. Install a flexible PVC
often begins. These holes should be protected from barrier when a pile loses approximately 10 to 15
moisture penetration by swabbing with hot as- percent of its cross-sectional area.
phalt or treating with creosote using a pressure (a) Piles. Piles should be protected 1 foot
bolt-hole technique. below the mudline and 1 foot above high tide
(3) Timber ends. The natural opening in the (figure 12-2, part a). Sheath the pile with a 30-mil
grain of timber ends allows easier water penetra- PVC sheet. A half-round wood pole piece is at-
tion. If the end is cut, it should be painted with a tached to the vertical edge of the PVC sheet to
preservative or swabbed with hot asphalt. The help in the wrapping process. (Note: A pile with
ends of the exposed members should be capped creosote bleeding from its surface must first be
with a thin sheet of aluminum, tin, or similar wrapped with a sheet of polyethylene film prior to
material (figure 12-1). installing the PVC wrap to prevent a reaction
(4) Pile ends. Two options exist for treatment between the PVC and the creosote.) Staple lengths
of pile ends. of polyethylene foam, ½ by 3 inches, about 1 inch
(a) Drill ¾-inch holes evenly spaced into the from the upper and lower horizontal edges of the
pile top 1½ inches deep, fill holes with creosote, sheet. Fit the pole pieces together with one in-
and cap with lead sheeting (figure 12-1). serted into a pocket attached to the bottom of the
(b) Clamp an iron ring around the top of the other pole. Roll the excess material onto the
pile, pour hot creosote into the ring, and allow the combined pole pieces and tighten around the pile
12-1
TM 5-600/AFJPAM 32-1088
12-2
TM 5-600/AFJPAM 32-1088
the creosote to leach from the surface before the bucket to distribute water can be placed in con-
asphalt is applied. venient locations. The danger of fire can also be
12-2. Fire protection
. reduced by a thin coating of tar or asphalt covered
To prevent tire, covered water barrels with a with sand, gravel, or stone chips.
plate must be replaced, the wood surface may be a. Scabbing. Scabbing can be used when the
too damaged for the teeth of the new plate to member is moderately damaged and the addition
provide a shear interface. In this case, wood of the scabbing allows the member to carry its
scabbing can be used to replace the steel plate or a design load. The method of scabbing used depends
new steel plate can be emplaced using nails to upon the type of timber member:
provide the interface. A loose plate can also be (1) All members. Clean and treat damaged
tightened and strengthened by adding nails or area. Relieve the member of any load, if possible.
screws to the plate. Place scabbing on the sides and/or the top and
d. Nails, spikes, and screws. These are the most bottom of the member to transmit the load across
common hardware items used to form wood con- the damaged area. The scabbing can be of a like
nections. When these items become loose the only wood, steel plate with bolt holes, or a steel plate
options are to: connector.
(1) Replace the nail or screw with a larger (2) Beams and stringers. A steel plate can be
one. scabbed onto these members to repair longitudinal
(2) Drive or screw the connector back in place, cracks as follows (refer to figure 12-4): drill holes
and add nails or screws to help carry the load of through the deck on either side of the stringer at a
the loose connector. minimum distance equal to the beam depth past
e. Deck connectors. Timber decking is connected the damaged area; drill an additional set of deck
to steel stringers with floor clips (figure 12-3) or holes past the other end of the damaged area;
nails driven into the under side of the decking and place draw-up bolts through the holes that extend
bent around the top flange of the steel member past the bottom of the existing beam (use washers
(figure 12-3). Composite action is achieved be- or support straps to help prevent pull through);
tween a concrete deck and timber stringers by place a steel retaining plate on the bottom of the
either castelled dapping, consisting of ½ to ¾-inch stringer and hold it in place with support straps
cuts in the top of the stringer; castelled dapping in and nuts on the draw-up bolts; and tighten the
conjunction with nails or spikes partially driven retainer plate in place. This process will
into the top of the stringer; lag bolts at a 45- strengthen the damaged area by providing a steel
degree inclination to horizontal; or epoxies. cover plate across the damage, closing any slits or
cracks in the wood, and by creating a composite
12-5. Repair of graded lumber action between the stringer and the deck.
When lumber is damaged to the point that the (3) Piles. A reinforced concrete scab or jacket
structural integrity of the member is in question, can be placed around a partially deteriorated pile
scabbing or slicing of the member may be required to restore the strength. The procedure is the same
to bridge the damaged area. as placing protective cover around a pile with the
12-4
TM 5-600/AFJPAM 32-1088
exception that reinforcing bars are placed inside b. Splicing. Splicing is required when the lum-
the form for added strength (see paragraph 12-1). ber is too severely damaged to carry its design
(4) Caps. Caps can be scabbed to extend the load (figure 12-6). To splice, remove the damaged
bearing area where the bottoms of stringers or portion of the wood member. Treat the freshly cut
laminated decking has deteriorated over the cap. end of the member and the replacement member.
The repair consists of attaching 6-inch-thick tim- Then, nail, screw, or bolt scabbing onto the exist-
bers with a depth equal to the cap to each side of ing timber and replacement to join them together.
the existing cap as follows (figure 12-5). Use a
12-6. Repair of piles
template to lay out 4-inch O-ring connectors on the
cap and scabs. Cut O-rings and drill ¾-foot holes When piles are damaged or deteriorated to the
through the cap and scabs. Insert O-rings in the point that the structural integrity of the pile is in
cap. Position scabs and clamp or bolt into place. question, it may be more advantageous to repair
Insert bolts through scabs and cap using O.G. the existing pile than to drive a replacement. The
washers on both ends of the bolt, and tighten into key to pile repair is that the existing pile must
place. have good bearing as part of the foundation. The
12-5
TM 5-600/AFJPAM 32-1088
method of repair chosen depends upon the type of cap ½ inch to 1 inch. Cut the dowel connecting the
pile damage: cap to the pile. Cut the deteriorated pile off below
a. Pile damage extending below the waterline. the permanent moisture line. Make cut at a right
(1) Single-pile steel reinforced splice (figure angle to the centerline of the pile. Cut the new
12-7, part a). Sever the pile approximately 2 feet pile ¼ inch longer than the removed section. Place
below the mudline. Cut a stub pile the length of the concrete form and reinforcing bars into posi-
the defective portion. Connect the ends of the stub tion. The form must allow a minimum of 6 inches
pile and the existing pile with a center drift pin or of cover around the pile. The form can be made
dowel with a ¾-inch diameter and 18 inches long. from steel culvert or steel drums and need not be
Reinforce the joint by placing three angle sections removed. Place the new pile section on the exist-
2 feet long (1.5 inches by 1.5 inches or 2 inches by ing pile stump. Ensure an even contact at the
2 inches) at each third point around the circumfer- bearing points and check to make sure the rebar
ence of the pile connection. The angles will be held has not shifted. Pour Class II concrete into the
in place by a minimum of four lag screws (4 inches form and slope the top of the pour to allow water
long) per angle. to run off. Reattach the cap to the pile with a
(2) Multiple pile steel reinforced splice (figure dowel or an exterior steel plate.
12-7, part b). Sever the piles about 2 feet below c. Settlement and bearing loss of a pile due to
the mudline. Place a mudsill on the portion of the deterioration. Place cribbing or struts adjacent
piles left in place. Secure even bearing on the to the pier and jack the stringers off the cap to
piles. Tamp earth between piles for an even sill an elevation ½ inch higher than desired. Cut
support. Ensure that the cross section of mudsill the tops off the decayed pile. Cut a shim ¼ inch
equals the bent cap and extends 3 feet beyond the less than the space between the cap and the pile
piles. Connect pile stubs between the mudsill and head and treat the pile head and shim. Place
cap using the drift pins and angles described for the shim into position. Lower jacks and fix the
the single pile. If the pile damage extends above shim into position (figure 12-9). Toenail the shim
the waterline, sever the pile about 2 feet below the to the pile. Dowel through the cap and repair. Nail
damage and proceed as previously described for a fish plates across the repair and remove the
below-water single pile. Seal the joint with creo- cribbing.
sote or asphalt. d. Damage to fender piles. Piles that have been
b. Single pile damage above the groundline broken between the top and bottom wales (figure
(figure 12-8). Remove the soil around the pile to 12-10) can be repaired as follows: cut off the pile
below moisture line. Construct cribbing or place below the break; install a new section, secured
struts for support jacks. Place jacks and jack up with epoxy; fit a strongback into position behind
12-6
TM 5-600/AFJPAM 32-1088
12-7
TM 5-600/AFJPAM 32-1088
12-9. Replacement of tension timber compo- jack on the block system, and jack the cap off the
nents piles. Cut the new pile ¼ inch below the cap, and
These members can be replaced using the same place copper sheeting on the pile head. Pull the
procedures outlined in paragraph 11-6 for steel pile into position. Lower jacks and dowel or strap
members. the cap to the pile. Repair and replace bracing and
deck.
12-10. Replacement of compression timber (3) Leave the existing pile in place and add
components new piles as follows (figure 12-12): cut holes in the
a. Piles. There are three methods that can be deck to drive piles, and drive piles on either side of
used to replace a damaged pile: the damaged pile, perpendicular to the bent. The
(1) Pull the existing pile and drive a new pile. new pile should off set at least one pile width to
(2) Drive a new pile along side the existing one side of the damaged pile. Cut the tops of the
pile as follows (figure 12-11, part a): locate the new piles and place a support across the tops of
centerline of the stringers nearest to the pile to be the new piles to form a cap under the existing pile
replaced, cut a hole through the deck to drive the cap. The two caps should be in contact with each
new pile, remove bracing which interferes with other. Use wedges to ensure that the load is
pile driving. Set pile at a slight batter so that it is transferred to the new bent.
plumb when pulled into position. Drive to a speci- b. Bent post. Replace as follows: install a tempo-
fied bearing. Install U clamps and blocking around rary support parallel to the damaged post, remove
the pile being replaced or on adjacent piles if the the existing post, install a new post and wedge
existing pile has no load carrying capacity. Place a into place to ensure proper load transfer, drive a
12-8
TM 5-600/AFJPAM 32-1088
drift pin through the pile cap, wedge into the post tween the new and old stringers. When selecting
to secure into position or nail the wedge into place, material for new stringers, it should be of the
cut the wedges off flush with the cap, post and same width and depth as the other stringers in the
connect the post to the sill, and cap with scabs. panel; however, in case of emergency, the best
c. Caps. To replace caps, temporary or false available size may be used temporarily. The
bents should be constructed to support the deck stringers should be wedged as tightly against the
and floor during the replacement operation (figure deck at the center of the span as they are at the
12-11). The new caps should be given a free, even end; do not attempt to fit to the deck sag by
bearing on each pile or post support. The cap adzing. As the new stringers acquire sag, the
should be fastened to each post or pile by drift pins wedges will be tightened to compensate. The proce-
and spikes. dure for adding or replacing stringers is as follows:
a. Under-the-deck method (figure 12-13). Place
12-11. Replacement of flexural timber compo- two jacks on each cap in adjoining bays next to the
nents (stringers)
stringer being replaced. Use steel plates between
the jack faces and the timber. Stop traffic during
Stringers should be lined up to a true plane for the jacking operation and jack the deck up ¼ to ½
new or replacement wood (figure 12-13). Stringers inch to clear the stringer. Cut a wedge out of one
in good condition and of proper size may be end of the stringer, and bevel the corners on the
salvaged and reused. New and salvaged stringers other end. If the replacement timber is warped,
should not be used together in any one panel place the camber up to provide bearing on all the
because of differences in sag and shrinkage be- deck members. Place the stringer’s wedged end on
12-9
TM 5-600/AFJPAM 32-1088
its cap, and push it far enough onto the cap to 12-12. Replacement of timber decking
allow the opposite end to be placed on its cap.
Lift the beveled end of the stringer onto the cap. a. Timber flooring. Floor planks should be laid
Anchor a “come-along” to the cap under the with the heart side down because it is more resis-
beveled end, and attach the cable to the wedged tant to decay. A ¼-inch spacing should be provided
end of the replacement stringer. With the come- between planks for drainage, expansion, and air
along, pull the new stringer into a final position circulation. Structural grade hardwood planks, 6
that provides an equal bearing on each cap and to 10 inches wide, are preferred as decking mate-
wedge the under side of the stringer to provide rial because wider planks have a tendency to curl.
contact with the deck. Remove the support equip- All nails or spikes should be driven so that their
ment, and nail the wedge into position in such a heads are imbedded into the plank. Planks of the
fashion that the nails can be removed and the same thickness should be placed adjacent to each
wedges adjusted to account for sag. other with a full, even bearing on the stringers.
b. Above-the-deck method. Cut the deck along Wedges should not be used to level flooring be-
each side of the stringer to be replaced. Remove cause they are easily dislodged and leave the
enough decking to allow one end of the stringer to flooring in a loose and uneven condition.
rotate on the cap enough for the other end to clear b. Wheel guards. Replacements should use the
the far side cap when it is lifted. Lift the far end of same size sections as the original and be fastened
the stringer with a cable through a precut hole in with the same bolt spacing. The bolts should be
the deck clear of the cap. Jack or pull the stringer extended through the riser or scupper blocks and
into final position. Replace the decking. floor planks (figure 12-14).
NEWSTRINGER
12-10
TM 5-600/AFJPAM 3 2 - 1 0 8 8
12-13. Strengthen intermediate supports beams and mark the positions of the helper bent
(piers) piles parallel to the pier. Cut holes in only one
a. Bent post. Bent posts can be strengthened by traffic lane at a time. For timber decks, make a
nailing 2-inch thick planks to the cap and sill and cut along the centerline of the stringers and
the post between them. The planks should be remove enough decking to drive the pile. For
approximately the width of the pier component to reinforced concrete decks, remove sufficient con-
which it is nailed. This has the effect of increasing crete in a square pattern to drive the piles. Cut
the reinforcing steel at the center of the hole and
the cross sectional wood area carrying the com-
bend out of the way. Set the piling and drive to
pressive loads of the bridge.
the required bearing. Cut the pile ¼ inch above
b. Concrete encased piles. Paragraph 12-4 dis-
the existing cap (make allowances for grade differ-
cusses the process of encasing a timber pile in
entials due to settlement). Place cover plates over
concrete to shore up a timber splice. The same
the deck holes and move to the next position.
type of technique can be used to extend the Repeat the same operation until all the piles are
reinforced concrete casing the full length of the driven. Jack up the superstructure ½ inch using
timber pile. The procedure involves the same steps the existing pier. Place a timber cap onto the
required in jacketing steel or concrete piles (Refer pilings. Lower the superstructure onto the caps of
to paragraphs 11-4 and 13-5). the new piers and strap the caps to the pilings.
c. Helper bents. Shim between the superstructure and the cap as
(1) This system can be used to strengthen an required to obtain the proper bearing. Remove the
entire pier section. It is used when existing piling deck plates and repair the deck. Construct cross-
have lost their bearing and settlement occurs, bracing on the new pile bents and between the
when the load capacity of the piling is in question, bents for intermediate bents.
or when the load bearing capacity of an existing
pier is increasing. Timber piles are driven through 12-14. Shorten span length
the deck parallel and adjacent to the pile bent and The strength increase obtained from shortening a
topped with a cap to interface with the stringers. timber span is fairly large due to the short spans
In essence, a new pier is constructed adjacent to generally associated with timber bridges. Shorten-
the existing pier to help carry the loads (figure ing is accomplished by adding one of the following:
12-15). a. Intermediate piers. Paragraph 10-22b.
(2) Helper bents are installed in the following b. A-Frame. Paragraph 10-22c.
manner. Locate the centerline of stringers or c. Knee brace. Paragraph 10-22d.
12-11
TM 5-600/AFJPAM 32-1088
12-12
TM 5-600/AFJPAM 32-1088
12-13
TM 5-600/AFJPAM 32-1088
CHAPTER 13
the failure is extensive, it is necessary to remove stringers, and abutments. During the installation
and replace the sealant. The sealant can be re- ensure that the reinforcing bars are in good
moved using handtools or on large projects by contact with one another; this will allow the
routing or plowing using suitable tools. Sawing current to flow through the reinforcing system.
can be used to enlarge the joint to improve the This system can be used to protect the exposed
shape factor for the new sealant. After the joint reinforcing bar; however, it is usually not an
has been cleaned it can be resealed. For more economical option in this special case. A common
information on joints see paragraph 12-12. power source used in the system is a rectifier
which provides DC power from an AC source.
13-4. Cathodic protection b. Galvanic system. This system requires no
external power source but uses anodes of a special
The only remedial procedure other than replace-
alloy to generate the current required to suppress
ment that has proved effective in stopping the
the corrosion process. Three common alloys are
corrosion process in contaminated concrete is ca-
zinc, magnesium, and aluminum. A procedure
thodic protection. Compared with the cost of re- used to protect exposed reinforcing bars in con-
placement, it is normally much less expensive. crete piles follows (figure 13-l): Clean an area
There are two types of cathodic protection systems on the exposed reinforcing bar on which to attach
that can be used to prevent corrosion in reinforc- a zinc anode (figure 13-1, part a). Attach one
ing bar. The systems are the impressed current 7-pound anode to every 6 feet of reinforcing bar
system and the galvanic system. exposed to brackish or salt water (figure 13-1,
a. Impressed current system. This system uses part b). Note that additional site testing may be
low-voltage, high-amperage direct current from an required to adjust the weight of the anode to
external power source to make the reinforcing bar ensure a 2-year life for the anodes. Less brackish
into a cathode. This system is most effective when water or fast moving water will affect this life
installed during the construction of decks, piers, expectancy.
13-5. General the causes and not the symptoms of the problem
are dealt with. The types of concrete damage, the
The repair and strengthen methods discussed in causes, and the means of determining the causes
the following paragraphs apply only to convention- are discussed in chapters 5 and 8. The repair of
ally reinforced concrete and specifically do not deteriorated concrete can be categorized into re-
apply to prestressed concrete. Refer to paragraph pairs suited for cracking and those suited for
13-17 for a discussion of prestressed concrete spalling and disintegration. Repair of deteriorated
members. In concrete repair it is imperative that concrete is required when: (1) The deterioration
13-2
TM 5-600/AFJPAM 32-1088
affects the structural design performance of the effective on isolated cracks that run in a straight
bridge; (2) The deterioration exposes the reinforc- line and are accessible at one end (figure 13-3). To
ing steel to corrosive action; (3) The lack of a accomplish, proceed as follows: drill a hole (2- to
repair will make the bridge unsafe for traffic 3-inch diameter) centered on and following the
under normal operating conditions. (Examples: pot- crack its full depth, and clean out the drill hole.
holes, extensive spalling of the deck, damaged The specifics of the remaining procedure are given
parapets, etc.) for:
(1) Dormant cracks. Fill the drill hole and
13-6. Crack repairs
crack with a cement grout. If watertightness is
The large variety of crack types prevents a single required over the bond transfer, fill the hole with
repair method. Active cracking may require asphalt or a like material. When both watertight-
strengthening of the concrete across the crack to ness and a keying action is required, drill two
prevent further crack expansion and the applica- holes along the crack and fill one with grout and
tion of a flexible sealant that will expand with the the other with asphalt.
crack. Dormant cracks basically require bonding (2) Active cracks. Fill the hole with precast
across the crack for the load carrying portion of concrete or mortar plugs set in bitumen. The
the concrete and sealing in all other areas. bitumen is used to break the bond between the
a. Conventional reinforcement. This method is plug and the hole to prevent cracking of the plug
primarily used to bridge isolated cracks in the by subsequent movement of the crack.
load-bearing portion of the structure for active and d. Dry packing. This process consists of ram-
dormant cracks. This repair bonds the cracked ming or tamping a low water content mortar into
surfaces together into one monolithic form (figure a confined space. This technique is effective in
13-2). Proceed as follows: clean and seal the patching holes with a high depth-to-area ratio or
existing crack with an elastic sealant applied to a dormant cracks. To accomplish, proceed as follows:
thickness of 1/16 to 3/32 inch and extending at least Undercut the area to be repaired so that the base
¾ inch on either side of the crack, drill ¾-inch width is slightly greater than the surface width.
holes at 90 degrees to the crack plane, fill the hole For dormant cracks, a slot should be cut along the
and crack plane with epoxy pumped under low surface of the crack 1 inch wide and 1 inch deep
pressure (50 to 80 psi), and place a reinforcing bar with a slight undercut. A sawtooth bit is a good
(No. 4 or No. 5) into the drilled hole with at least tool to use for this purpose. Clean and dry the slot.
an 18-inch development length on each side of the Apply a cement slurry bond coat of equal parts of
crack. cement and fine sand to the faces of the slot. Place
b. Prestressing steel. This technique uses pre- dry pack mortar in the slot in 3/8-inch layers and
stressing strands or rods to compress the crack to compact each layer with a hard wood stick work-
close it. (Refer to paragraph 13-12c). ing from the middle out or a T-shaped rammer for
c. Drilling and plugging. This repair consists of larger areas. If the mortar becomes spongy during
drilling down the length of the crack and grouting the compaction process, allow the surface of the
the hole to form a key that resists transverse dry pack to stiffen and then continue the compac-
movement of the section. This technique is most tion. Fill the slot completely and strike flush with
13-3
TM 5-600/AFJPAM 32-1088
the concrete surface using a board or the hardwood Figure 13-4. Epoxy injection used to seal cracks.
compaction stick.
e. Epoxy injection. into the crack using hydraulic pumps, paint pres-
(1) Cracks as narrow as 0.002 inch can be sure pots, or air-actuated caulking guns. Vertical
bonded by injection of epoxy along the crack cracks should be injected starting with the port at
(figure 13-4). This technique also has been used to the lowest elevation and working up. Horizontal
repair delamination in bridge decks. cracks can proceed from either end of the crack
(2) To accomplish, proceed with the following and run to the far end of the crack. Remove the
steps. Clean the crack of all oil, grease, dirt, or epoxy seal by grinding or some other means and
substances that may retard the bonding process. paint over the injection ports with an epoxy
Seal the surface of the crack by brushing an epoxy patching compound.
along the surface of the crack and allowing it to f. Flexible sealing. This repair method involves
harden. If high-pressure injection is required, cut a routing and cleaning the crack and fitting it with
V-shaped groove along the crack ½ inch deep and a field-molded flexible sealant. It is used for active
¾ inch wide, and fill the groove with epoxy. Install cracks in which the crack is the indication of a
epoxy injection ports. There are three procedures joint requirement in the concrete, and the forma-
in current use for the installation of injection tion of a joint does not impair the capacity of the
ports: structure. To install, proceed as follows (figure
(a) Drilled holes with fittings. This method 13-5): Rout out the active crack to the dimensions
is used in conjunction with V-grooves and involves that comply with the width and shape factor
drilling ¾-inch-diameter holes to a depth of ½ inch requirements of a joint having the same move-
below the apex of the groove. An injection fitting ment. Clean the crack and routed area by sand-
(small-diameter pipe, plastic tubing, valve stem, blasting and/or water jetting. Apply a bond
etc.) is bonded into the hole. breaker at the bottom of the slot to allow the
(b) Bonded flush fittings. When cracks are sealant to change shape without forming a stress
not V-grooved, injection ports are bonded flush concentration on the bottom of the sealant. Com-
with the concrete face. This type of port would be mon bond breakers are polyethylene strips and
seated directly into the crack, and the face of the pressure sensitive tape. Fill the slot with a suit-
port would be flush with the concrete face. able field-molded flexible sealant in accordance
(c) Interruption in seal. A portion of the seal with the proper American Concrete Institute (ACI)
is omitted from the crack. For this method, the specification. Narrow cracks can be sealed without
epoxy injector must have a gasket system that routing by applying a bond breaker over the crack
covers the unsealed portion of the crack and allows and overlapping the sealant across the bond
the epoxy to be injected into the gap without breaker to seal the crack (figure 13-5).
leaking. g. Routing and sealing. This method is used to
(3) After installation of the injection ports, seal dormant cracks that do not affect the struc-
mix the epoxy to conform to the current American tural integrity of the bridge member. The seal
Society of Testing and Materials specification for prevents water from reaching the reinforcing steel.
Type I, low-viscosity grade epoxy. Inject the epoxy Proceed as follows (figure 13-6): Rout along the
13-4
TM 5-600/AFJPAM 32-1088
crack to provide a minimum surface width of ¼ (1) Stitching is the process of drilling holes on
inch. Clean the cut and allow the surface of the both sides of the crack and grouting in stitching
cut to dry. Apply sealant (ACI 504R). dogs (U-shaped steel bars with short legs) that
h. Grouting (hydraulic-cement). Dormant cracks bridge the crack (figure 13-7). Stitching is used to
can be repaired with portland cement containing reestablish tensile strength across the crack. Adja-
slag or pozzolans for strength gain. The grout can cent sections to the cracked section may require
be sanded or unsanded. Proceed as follows: Clean strengthening to prevent a crack from forming in
the concrete along the crack. Install built-up seats the adjacent sections of the concrete.
(grout nipples) at intervals astride the crack to (2) Install stitching as follows: Drill a hole at
provide contact with the pressure injection appara- each end of the crack to blunt it and relieve the
tus. Seal the crack between the grout nipples with stress concentrations. Clean and seal the crack,
a cement paint or grout. Pump grout into the use a flexible seal for active cracks. Drill holes on
crack through the nipples. Maintain the pressure both sides of the crack. The holes should not be in
for several minutes to ensure good penetration of a single plane and the spacing should be reduced
the grout. The grout should have a water-cement near the ends of the crack. Clean the holes and
ratio of one part cement to one to five parts water. anchor the legs of the dogs in the holes with a
The water-cement ratio can be varied to improve nonshrink grout or an epoxy. The stitching dogs
the penetration into the crack. Chemical grouts should vary in length and orientation to prevent
can also be used. They consist of solutions of two transmitting the tensile forces to a single plane.
or more chemicals that react to form a gel or solid (3) The following considerations should be
precipitate as opposed to cement grouts that con- made when using stitching: Stitch both sides of
sist of suspensions of solid particles in a fluid. the concrete section where possible to prevent
Guidance regarding the use of chemical grouts can bending or prying of the stitching dogs. Bending
be found in EM 1110-2-3504. members may only require stitching on the ten-
i. Stitching. sion side of the member. Members in axial tension
13-5
TM 5-600/AFJPAM 32-1088
must have the stitching placed symmetrically. concrete to be removed is all unsound concrete,
Stitching does not close the crack, but can prevent including all delaminated areas.
its propagation. Stitching that may be placed in c. The patch area must be cleaned to remove all
compression must be stiffened and/or strengthened debris from the concrete removal process. The
to carry this force, such as encasement of the existing concrete surface and reinforcing steel
stitching dogs in a concrete overlay. should then be blast cleaned. The repair is cleaned
again and inspected. Any aggregate particles that
13-7. Spall repair
have been cracked or fractured by scarifying or
Spa11 is repaired primarily by removing the deteri- chipping should be removed to sound concrete.
orated concrete and replacing it with new concrete d. Patches should be reinforced with wire mesh
of similar characteristics. The process involves the attached either to reinforcing bars or dowels to
following: secure the patch to the old concrete. Loose rein-
a. Analyze the structure to determine the effect forcing bars should be tied at each intersection
of removing the deteriorated concrete down to point to prevent relative movement of the bars and
sound concrete will have on the structure. Deter- repaired concrete due to the action of traffic in
mine the need for and the design of any shoring adjacent lanes during the curing period. If new
and bracing required to support the structure reinforcement is required, an adequate length to
during the repair. attain a lap splice (30 times the bar diameter)
b. The concrete must be removed down to sound must extend from the existing section. If a proper
concrete or to a depth where the patch is at least splice is not possible, holes must be drilled into the
¾ inch thick. Sharp edges, at least 1 inch deep, existing concrete and dowels or anchors installed.
should be formed around the area to be patched to e. An interface must be established between the
avoid feather-edging the concrete patch. It is also existing and new concrete. Options for this in-
advantageous to make the bottom of the removed clude:
concrete areas slightly wider than the surface to (1) Epoxy bonding. Ensure the surface is
form a keying effect with the new concrete patch. clean, dry, and free of oil. Apply the epoxy agent
If a large surface area is to be overlaid with new to the prepared surface.
concrete, a minimum of ¼ inch should be removed (2) Grout or slurry. Clean the prepared surface
from the surface. The edges of the overlay should and saturate with water. Remove all freestanding
be chipped or cut at about 45 degrees to prevent water with a blast of compressed air, and apply a
entrapping air under the overlay. Tools that can thin coat of grout.
be used to remove concrete are: jackhammers, f. After surface preparation, the new concrete
diamond saws, rotary head cutters, high-pressure must be promptly applied to the repair and fin-
water jets, thermal lances, and hydraulic splitters. ished.
Clean sound surfaces are required for any repair g. The new concrete should be moist cured for a
operation, and the absolute minimum amount of minimum of 7 days to prevent drying shrinkage
13-6
TM 5-600/AFJPAM 32-1088
and to allow proper strength development. This is and remove debris; place sealant in accordance
most easily accomplished by covering the patch with the manufacturer’s installation procedure.
with plastic or wet burlap. b. Expansion joint seal. This seal can be used to
h. Shotcrete can also be used to replace concrete seal open joints, replace failed preformed joint
in spalled areas. Shotcrete is a mixture of portland material, and reseal joints sealed with elastomeric
cement, sand, and water shot in place by com- seals. The installation procedure is as follows.
pressed air. It is best used for thin repair sections Determine the required elastomeric seal size in
(less than 6 inches deep) or large irregular sur- accordance with the guidelines in table 13-l:
faces. Shotcrete requires a proper surface treat- Table 13-1. Elastomeric seal size guidelines
ment similar to that required for a concrete over-
lay and no form work is needed to confine the mix.
This makes shotcrete useful in the repair of
vertical walls, beams, and the underside of decks.
This technique requires specialized training and
guidance on the use of shotcrete as a repair
material is given in EM 1110-2-2005.
13-7
TM 5-600/AFJPAM 32-1088
follows (figure 13-8, part c). Drill three ½-inch- small portion of concrete, welding a steel strap to
diameter holes on line in the elastomeric seal. The the dam and the deck’s reinforcing steel, and
holes should be spaced at intervals of 1/3H (H = replacing the concrete (figure 13-10, part a). The
height of the seal) on lines 2/3H from the bottom of procedure is as follows. Identify the loose portions
the seal. Cut the lower section of the seal from the of the expansion joints requiring repair. Mark 12-
bottom, and seal the hole in all three locations. by 8-inch rectangles immediately adjacent to the
dam on 18-inch centers, and saw cut around the
Bend the seal in the desired position and install
perimeter of the rectangle to a l-inch depth.
following normal sealing procedures. To make a Remove the concrete inside the rectangle to a
downward turn with the seal, proceed as follows depth required to expose the deck’s reinforcing
(figure 13-8, part c). Drill a M-inch hole along the steel with an air hammer. Cut a slot 1 inch wide
seal at the location of the bend in the seal in a into the dam and weld a ¼- by l- by 12-inch steel
position 2/3H from the bottom of the seal. Cut a Z-strap into the slot and to the deck’s reinforcing
wedge from the underside of the seal by making steel. Sandblast the rectangular opening in the
two intersecting angled cuts (45 degrees) from the concrete and blow out all debris. Apply an epoxy
bottom of the seal to the ½-inch hole. Bend the bonding compound to the exposed concrete and fill
seal down and install using normal sealing proce- the rectangle with a compacted latex modified
dures. portland cement concrete.
c. Expansion joint seals with an asphalt overlay. (2) Sliding joint. This repair can also be used
The installation procedure is as follows (figure on armored and finger joints. The repair places
13-9). Saw cut along lines parallel to and 1 foot on l-inch diameter bolts on 2-foot centers through the
either side of the joint at a 60-degree angle away bridge deck and the bolt is welded to the expan-
from the joint. Remove the asphalt inside the cut sion dam. The bolt is anchored to the bottom of the
area and clean the concrete deck. Place a filler in deck with a steel plate, wedge washer, and nut
the joint to maintain an area between the joint (figure 13-10, part b). The repair procedure is as
and asphalt. Apply an epoxy bonding compound to follows. Burn holes through the top flange of the
the cleaned concrete surface. Place latex modified expansion dam on 2-foot centers across the area to
concrete in the cut area and finish off flush with be repaired. Below the holes in the top flange, drill
the existing asphalt. After the concrete has set, 1¼-inch hole through the deck at a 45-degree
saw cut a joint to the required width and depth. angle. Saw cut a 6- by 6-inch area, 1 inch deep
Remove all debris and filler from the joint. Apply around the exit of the drilled hole on the under-
adhesive to the joint faces and install the seal. side of the deck. Remove the concrete inside the
d. Expansion dam repair. scored area to the reinforcing steel. Place a l-inch-
(1) Open armored joint. This repair method diameter bolt through the hole in the flange and
can be used to spot repair a loose expansion dam the deck. Cut the head of the bolt flush with the
or across the full length of armored, finger, and top flange and weld to the flange with a full
sliding joints. The repair involves removing a penetration weld. The bolt should extend through
13-8
TM 5-600/AFJPAM 32-1088
13-9. Abutments and wingwalls Figure 13-11. Repair of abutment and wingwall faces
using a jacket.
The concrete in abutments and wingwalls may
deteriorate from the effects of water, deicing chem- the specific cause of the problems should be deter-
icals, freeze cracking, or impact by debris which mined to properly repair the damage. A detailed
results in breaking off the edges or portions of the plan of the jacking requirements should be made.
face. These conditions require that repairs be Several repair procedures are as follows:
made to prevent continued deterioration, particu- a. Abutment and cap seats (figure 13-13). Re-
larly increased spalling due to moisture reaching move traffic from structure during jacking opera-
the rebar and causing corrosion. The following tions. Lift jacks in unison to prevent a concentra-
steps in the rehabilitation procedure are normally tion of stress in one area and possible damage to
required (figures 13-11 and 13-12). Establish traf- the superstructure. Restrict vehicle traffic during
fic control, as necessary. Excavate as required to the repair as much as possible. Saw cut around
set dowels and forms. Remove deteriorated con- concrete to be removed and avoid cutting reinforc-
crete by chipping and blast cleaning. Drill and set ing steel. Remove deteriorated concrete to the
tie screws and log studs to support the form work. horizontal and vertical planes ensuring that sound
Set reinforcing steel and forms. Apply epoxy- concrete is exposed. Add reinforcing steel as re-
bonding agent to the concrete surface. Place con- quired and construct forms to confine the new
crete, cure, and remove forms. Install erosion concrete. Apply bonding material to the prepared
control material as necessary. surface that will interface with the new concrete.
Place and cure new concrete. Service, repair, or
13-10. Bridge seats
replace bearings as necessary.
Problems often found in concrete bridge seats b. Concrete cap extension. This repair restores
include deterioration of concrete, corrosion of the adequate bearing for beams that deteriorated or
reinforcing bars, friction from the beam or bearing sheared at the point of bearing by anchoring an
devices sliding directly on the seat, and the im- extension to the existing cap. The procedure is as
proper design of the seat which results in shear follows (figure 13-14). Locate and drill 6-inch-deep
failure. During the preliminary planning stage, holes to form a grid in the existing cap and install
13-9
TM 5-600/AFJPAM 32-1088
concrete anchors that will accept a ¾-inch bolt. member to protect it from further deterioration or
Place ¾- by 9-inch bolts 4 inches into the concrete to restore the structural integrity of the member.
anchors. Wire a reinforcing steel (No. 4 bars) grid The repair can be made with a standard wood or
to the inside head of the anchor bolts. Construct a metal form work which is removed after curing or
form around the reinforcing steel grid with a a fiberglass form that remains in place and helps
minimum of 4 inches cover around the sides of the protect the surface of the member.
a. Standard formwork. This repair method is
bolts and a minimum of 2 inches cover for the face
used for piles that have been damaged or deterio-
of the extension. Place roofing paper against the
rated to the point that structural integrity of the
bottom of the beam and place Class IV concrete in member is in question. In this procedure, the pile
the form. Remove forms after 3 days. The exten- is encased with a concrete jacket reinforced with
sion should not carry any load during curing. epoxy coated reinforcing steel (figure 13-16). The
Repair any damage to the end of the beam. construction procedure is as follows. Remove all
c. Beam saddle. The saddle restores bearing for deteriorated concrete to a sound base. Clean the
beams and caps where they have deteriorated or pile to ensure proper bonding with the jacket.
been damaged in the bearing area. The procedure Sand-blast rebars to remove corrosion and rust.
is as follows (figure 13-15). Obtain measurements Place a rebar cage around the pile to reinforce the
of the cap and beam width, and have an engineer pile. Treat the inside face of the forms with a
design the saddle. Prepare the top of the cap and release agent, and set the forms for the concrete
the beams for good bearing contact with the jacket around the rebar cage and pile. Dewater the
saddle. Use neoprene bearing pads for contact forms and place Class III concrete. Allow a mini-
points between the saddle and the beam and cap. mum of 72 hours for curing.
Place saddle members in contact with the cap b. Fiberglass forms. These forms can be used to
across the cap on each side of the beam. Drop one prevent further deterioration or restore structural
bolt through a hole at each end of the two saddle integrity to piles and columns. The repair involves
cap contact members, and bolt the saddle bearing the encasement of the pile or column in the
members in place under the beam. Place neoprene fiberglass form and filling the form with epoxy
bearing pads under the beam, and tighten the grout, cement grout, or Class III concrete. The
bolts in place. Install and tighten the remaining fiberglass forms should be a minimum of 1/8-inch
bolts. in thickness with noncorrosive standoffs and a
compressible sealing strip at the bottom. Installa-
13-11. Columns and piles tion procedures will vary depending upon the
The typical repair involving concrete columns and degree and location of damage and the specific
piles is to place a concrete jacket around the jacket manufacturer’s recommendations. The basic
13-10
TM 5-600/AFJPAM 32-1088
SECTION A-A
procedure for using fiberglass forms is as follows. a. Conventional repair. Refer to paragraph 13-7.
Clean pile surfaces of materials which prevent b. Conventional reinforcement. Refer to para-
bonding. Remove deteriorated concrete down to a graph 13-6a.
sound concrete base. Sandblast exposed rebar to a c. Prestressing steel. This method can be used to
“near-white metal” finish. Place the jacket form close a crack and/or provide external reinforcing
work around the pile. The form should have built steel to support the beam loading (figure 13-17).
in standoffs, concrete blocks attached to the inside Install as follows. Clean the crack and any exposed
face, or double-nut bolts placed through drilled rebar. Drill holes through the side of the beam
holes to provide the proper standoff. Seal the (missing existing rebar) for the prestressing anchor
form’s joints and bottom with an epoxy compound. at both ends of the beam. Install anchors on both
Place external bracing and bonding materials to sides and at both ends of the beam by running
help prevent form movement and bulging. De- bolts through prepared holes in the anchors and
water form and fill the space between the pile and beam. The anchor should be designed by an engi-
form with the appropriate tiller. Cure, remove neer and generally consist of a reinforced angle
external bracing and banding, and clean any filler section with holes in the flanges to receive the
material from the form’s faces. through bolts and the tension tie. Connect the
tension tie to each set of anchors on either side of
13-12. Stringers and beams
the beam. Apply tension to the ties using a
Spall in beams can be dealt with in a similar turnbuckle or torquing nuts. Tension should be
manner as walls by constructing a form around applied across both sides of the beam evenly.
the damaged area and replacing the lost concrete Increase tension until the crack closes and seal
(paragraph 13-10a). Shotcrete is an excellent ma- with a flexible seal. This method can also be used
terial to use in this type of repair. The major in conjunction with a patch to replace deteriorated
problem caused by concrete deterioration is the steel.
loss of effective reinforcing bar diameter due to
corrosion. This is also true of cracks which allow 13-13. Decks
water to penetrate to the reinforcing steel. Due to a. Spall. Spa11 repair on bridge decks can be
the criticality of reinforcing bars in beams, it is broken into three categories based on the overall
important to repair or replace any damaged rein- condition of the deck, as is shown further into this
forcing bars. There are three methods available to paragraph. The categories are identified according
reestablish the reinforcing steel required for to the amount of spall, the extent of total deterio-
proper beam performance: ration (spall, delaminations, and corrosion poten-
13-11
TM 5-600/AFJPAM 32-1088
Figure 13-15. Typical beam saddle design using standard steel W-sections.
tials over -0.35 volts), and total percentage of (2) Moderate active corrosion.
concrete samples containing at least 2 pounds of (a) Spa11 covers from 0 to 5 percent of total
chloride per cubic yard of concrete: deck area.
(1) Extensive active corrosion. (b) Deterioration covers from 5 to 40 percent
(a) Spa11 covers more than 5 percent of total of total deck area.
deck area. (c) Chlorides high in 5 to 40 percent of
(b) Deterioration covers more than 40 per- samples.
cent of total deck area. (3) Light to no active corrosion.
(c) Chlorides high in over 40 percent of (a) No spa11 present.
samples.
13-12
TM 5-600/AFJPAM 32-1088
Figure 13-16. Standard concrete pile jacket with steel reinforcing cage.
13-13
TM 5-600/AFJPAM 32-1088
13-14
TM 5-600/AFJPAM 32-1088
consists of placing a tie rod across the deck crack. (1) Cast in place. Remove the deteriorated
The tie rod is emplaced through drilled holes in deck. Construct the form work for the new deck.
the beams on either side of the cracked deck. The Shore the form work to carry the dead load of the
torquing nuts or turnbuckles on the tie rods are deck. Install reinforcing steel. Place the concrete
then tightened to close the crack in the deck and allow to cure long enough to achieve its
(figure 13-18). design strength.
(2) Precast. Remove the deck area to be re-
13-14. Replacement of concrete members
placed with the precast section. Place the precast
a. Decks. After the deteriorated portion of the sections with a crane, being careful to overlap
deck has been removed, replacement decks can be extended rebar when placing adjacent panels and
cast in place or precast sections can be fixed into wire together. Form around the connection be-
position. The advantage to using precast sections tween adjacent panels and apply an epoxy agent to
is that no form work is required, and smaller interface between the sides of the panels and the
portions of the deck can be removed and replaced, new concrete.
thereby minimizing traffic disruption. The proce- b. Piles. Piles which cannot be jacketed can be
dures for both types of deck replacement are replaced in much the same manner as timber piles
outlined: (chapter 12).
13-15
TM 5-600/AFJPAM 32-1088
13-16
TM 5-600/AFJPAM 32-1088
blast the concrete to remove the surface laitance 13-17. Prestressed concrete members
and to expose coarse aggregates. Drill holes in By design, prestressed concrete members behave
the slab or beam to emplace anchor bolts for differently than conventionally reinforced mem-
the ends of the steel plates. Mix adhesive and bers. As a result, many of the methods discussed
apply to the steel plate with a thickness between in the preceding paragraphs do not apply to
1/16th to 1/8th inch. The adhesive should be thicker prestressed concrete members. Due to its complex-
along the centerline of the plate to prevent air ity, the repair of prestressed concrete members is
pockets from forming between the plate and con- not covered in this manual. The following reports
crete faces. Place the steel plate on the underside by the Transportation Research Board should be
of the beam or slab and bolt the ends to hold into referred to for the evaluation and repair of pre-
place. Supplemental bolting is used at the plate stressed concrete members:
ends to reduce peel failures and hold the plate in (1) National Cooperative Highway Research
place in case of failure. Apply pressure along the Program (NCHRP) Report Number 226, “Damage
full length of the plate using secondary supports Evaluation and Repair Methods for Prestressed
and wedges. Tighten the end bolts into place and Concrete Bridge Members.”
allow the adhesive to cure (normally 24 hours). (2) NCHRP Report Number 280, “Guidelines
Remove secondary supports and paint the steel for Evaluation and Repair of Prestressed Concrete
plate. Bridge Members.”
13-18
TM 5-600/AFJPAM 32-1088
APPENDIX A
A-1. References
Government Publications
Departments of the Army, Navy, and Air Force
AR 420-72 Surfaced Areas, Bridges, Railroad Track and Associated
Appurtenances
FM 5-446 Military Nonstandard Fixed Bridging
TM 5-628 Railroad Track Standards
FM 5-277 Bailey Bridge
Coast Guard
Pamphlet CG204 Aids to Navigation
Department of Transportation, Federal Highway Administration
Bridge Inspector’s Training Manual 70
Inspection of Fracture Critical Bridge Members
Nongovernment Publications
American Association of State Highway Transportation Officials (AASHTO), 444 North Capitol
Street, Washington, DC 20001
Standard Specifications for Highway Bridges, Fourteenth Edition, 1989
Manual on Uniform Traffic Control Devices
Manual for Maintenance Inspection of Bridges
National Cooperative Highway Research Program (NCHRP), Transportation Research Board,
National Research Council, Washington, DC
Report 280 Guidelines for Evaluation and Repair of Prestressed
Concrete Bridge Members, December 1985
Report 293 Damage Evaluation and Repair Methods for Prestressed
Concrete Bridge Members, November 1980
A-2. Bibliography
Manuals
AASHTO Maintenance Manual, 1987. American Association of State Highway and Transportation
Officials, Washington, DC (1987).
AASHTO Manual for Bridge Maintenance, 1987. American Association of State Highway and Transporta-
tion Officials, Washington, DC (1987).
American Concrete Institute (ACI) Manual of Concrete Practice, 1988. American Concrete Institute, Detroit,
MI.
Annual Book of American Society for Testing and Materials (ASTM) Specification, 1990. American Society
for Testing and Materials, 1961 Race Street, Philadelphia, PA.
Guide Specifications for Strength Evaluation of Existing Steel and Concrete Bridges, 1989. American
Association of State Highway and Transportation Officials, Washington, DC (1989).
Guide Specifications for Fracture Critical Non-Redundant Steel Bridge Members, 1978. American Associa-
tion of State Highway and Transportation Officials, Washington, DC (1989).
Manual for Railway Engineering, American Railway Engineering Association (AREA), Washington, DC
(1989).
Manual for Bridge Maintenance Planning and Repair Methods, Volume I. Florida Department of
Transportation, State Maintenance Office.
A-l
TM 5-600/AFJPAM 32-1088
Journal Articles
American Concrete Institute Committee 201, “Guide to Durable Concrete,” Journal of the American
Concrete Institute, Number 12, Proceedings Volume 74, pages 573-609, December 1977.
A-2
TM 5-600/AFJPAM 32-1088
APPENDIX B
For the following components, address each appropriate inspection item and make notes of any observed
deficiencies and recommendations:
A. Timber Abutments
1. Signs of settlement.
2. Rusting of steel rods.
3. Decay of end dam, wingpost, post, and/or cap.
4. Deterioration of block (bearing and anchor).
5. Decay of sill and footing.
6. Loose timbers.
7. Decay of breakage of piles (wing or bearing).
B. Steel Pile Abutments
1. Settlement.
2. Rusting of end dam, pile and/or cap.
3. Section loss of steel members.
4. Missing, loose, or rusting bolts.
C. Concrete Abutments, Wingwalls, and Retaining Walls
1. Settlement.
2. Proper function of weep holes.
3. Cracking or spalling of bearing seats.
4. Deterioration of cracking of concrete.
5. Exposed reinforcing steel.
D. Timber Piers and Bents
1. Settlement.
2. Decay of caps, bracing, scabbing, or corbels.
3. Missing posts or piles.
4. Decay of posts or piles.
5. Debris around or against piers.
6. Section loss of sills or footings.
7. Erosion around piers.
8. Rusting of wire-rope cross bracing.
9. Loose or missing bolts.
10. Splitting or crushing of the timber when:
a. The cap bears directly upon the cap, or
b. Beam bears directly upon the cap.
11. Excessive deflection or movement of members.
E. Steel Piers and Bents
1. Settlement or misalignment.
2. Rusting of steel members or bearings.
B-l
TM 5-600/AFJPAM 32-1088
3. Debris.
4. Rotation of steel cap due to eccentric connection.
5. Braces with broken connections or loose rivets or bolts.
6. Member damage from collision.
7. Need for painting.
8. Signs of excessive deflection or movement of members.
F. Concrete Piers and Bents
1. Settlement.
2. Deterioration or spalling of concrete.
3. Cracking of pier columns and/or pier caps.
4. Cracking or spalling of bearing seats.
5. Exposed reinforcing steel.
6. Debris around piers or bents.
7. Section loss of footings.
8. Erosion around piers.
9. Collision damage.
G. Concrete (girders, beams, frames, etc.)
1. Spalling (give special attention to points of bearing).
2. Diagonal cracking, especially near supports.
3. Vertical cracks or disintegration of concrete, especially in the area of the tension steel.
4. Excessive vibration or deflection during vehicle passage.
5. Corrosion or exposure of reinforcing steel.
6. Corroded, misaligned, frozen, or loose metal bearings.
7. Tearing, splitting, bulging of elastomeric bearing pads.
H. Timber (trusses, beams, stringers, etc.)
1. Broken, deteriorated, or loose shear connectors.
2. Failure, bowing, or joint separation of individual members of trusses.
3. Loose, broken, or worn planks on the timber deck.
4. Improper functioning of members.
5. Rotting or deterioration of members.
I. Steel (girders, stringers, floor beams, diaphragms, cross frames, portals, sway frames, lateral
bracing, truss members, bearing and anchorage, eyebars, cables, and fittings)
1. Corrosion and deterioration along:
a. Web flange.
b. Around bolts and rivets heads.
c. Under deck joints.
d. Any other points which may be exposed to roadway drainage.
e. Eyebars, cables, and fittings.
2. Signs of misalignment or distortion due to overstress, collision, or fire.
3. Wrinkles, waves, cracks, or damage in the web and flange of steel beam, particularly near points of
bearing.
4. Unusual vibration or excessive deflection occurring during the passage of heavy loads.
5. Frozen or loose bearings.
6. Splitting, tearing, or bulging in elastomeric bearing pads.
J. Concrete Appurtenances
1. Cracking, scaling, and spalling on the:
a. Deck surface.
b. Deck underside.
c. Wearing surface (map cracking, potholes, etc.).
NOTE: If deterioration is suspected, remove a small section of the wearing surface in order to check the
condition of the concrete deck.
2. Exposed and/or rusting reinforcing steel.
3. Loose or deteriorated joint sealant.
B-2
TM 5-600/AFJPAM 32-1088
B-3
TM 5-600/AFJPAM 32-1088
APPENDIX C
b. Transitions.
c. Approach guardrail.
d. Approach guardrail terminal.
2. Deck.
a. Wearing surface.
b. Deck structural condition.
c. Curbs.
d. Median.
e. Sidewalk.
f. Parapet.
g. Railings.
h. Drains.
i. Lighting.
j. Utilities.
k. Expansion joints.
3. Load bearing components.
a. Bearing devices.
b. Stringers.
c. Girders or beams.
(1) General.
(2) Cross frames.
(3) Bracing.
d. Floor beams.
e. Trusses.
(1) General.
(2) Portals.
(3) Bracing.
f. Paint.
4. Abutments.
a. Wings.
b. Backwall.
c. Bearing seats.
d. Breast wall.
e. Weep holes.
f. Footing.
g. Piles.
h. Bracing.
i. Erosion or scour.
j. Settlement.
5. Piers/bents or pile bents.
a. Caps.
b. Bearing seats.
c. Column, stem, or wall.
d. Footing.
e. Piles.
f. Bracing.
g. Erosion or scour.
h. Settlement.
6. Channel and channel protection.
a. Channel scour.
b. Embankment erosion.
c. Drift.
d. Vegetation.
e. Fender system.
f. Spur dikes and jetties.
C-2
TM 5-600/AFJPAM 32-1088
g. Rip rap.
h. Adequacy of opening.
7. Approach.
a. Alignment.
b. Approach.
c. Relief joints.
d. Approach.
(1) Guardrail.
(2) Pavement.
(3) Embankment.
C-3
TM 5-600/AFJPAM 32-1088
Code Description
4 Bank and embankment protection is severely undermined. River control devices have se-
vere damage. Large deposits of debris are in the waterways.
3 Bank protection has failed. River control devices have been destroyed. Stream bed aggra-
dation, degradation, or lateral movement has changed the waterway to now threaten the
bridge or approach roadway.
2 The waterway has changed to the extent the bridge is near a state of collapse.
1 Bridge is closed because of channel failure. Corrective action may put it back in light ser-
vice.
0 Bridge is closed because of channel failure. Replacement is necessary.
4. Supplemental for Approach Roadway Alignment (Use in conjunction with part 2 above):
Code Description
8 Speed reduction is NOT required.
6 A VERY MINOR speed reduction is required.
3 A SUBSTANTIAL speed reduction is required.
C-4
TM 5-600/AFJPAM 32-1088
GORDON R. SULLIVAN
General, United States Army
Official: Chief of Staff
MILTON H. HAMILTON
Administrative Assistant to the
Secretary of the Army
OFFICIAL
JAMES E. MCCARTHY
Major General, United States Air Force
The Civil Engineer
DISTRIBUTION:
Army: To be distributed in accordance with DA Form 12-34-E, block
number 0721, for TM 5-600.
Air Force: F
*U.S. G.P.O.:1994-386-731:120