You are on page 1of 39

Question:

At runtime communication between the source system and BW is broken down


into the following steps: Identify them .

There are 2 correct answers to this question.

Response:

Master data

Projection data

Loading of data to info provider

BW and SAP

Running of analysis.

Score 0 of 1

Question:

Which of the following rules applies to user status in orders and notifications?
Please choose the correct answer.

Response:

When a user status is flagged as an initial status, it overrides the initial system status CRTD.

When you set a new user status with a status number, the previous user status with status numbe
deactivated.

The user status in the notification can be copied into the order.

Changes to the user status can affect authorizations.

Score 0 of 1
Question:

Your customer uses operating hours to execute a performance-based


maintenance plan.

Which of the following data must you assign in the maintenance plan header?

Please choose the correct answer.

Response:

A technical object with a measuring point

A task list for performance-based maintenance

An order type for performance-based maintenance

A cycle unit of measure with a corresponding characteristic from the measuring point

Score 0 of 1

Question:

Under which conditions you can change stock information in the serial number
manually.

There are 2 correct answers to this question.

Response:

BOM active

No stock check is active

Sterilization operation

All active

No plant has been entered


Score 0 of 1

Question:

You are using a maintenance plan for test equipment calibrations. When is an
inspection lot created?
Please choose the correct answer.

Response:

After entering measuring point data that is out of tolerance

When a follow-up action is triggered from a malfunction report

Before the calibration order is created

When the calibration order is created

Score 0 of 1

Question:

In order type Customizing, you can set the default for when the purchase
requisition is created to immediately, from release, or never. For which
combination must you set the default?

Please choose the correct answer.

Response:

Order type and responsible work center

Order type and plant

Order type and planner group

Order type and material type

Score 0 of 1

Question:
How does SAP make new functions of the SAP ERP application available to
customers?

Please choose the correct answer.

Response:

Via add-ons

Via enhancement packages

Via Support Packages

Via best practices

Score 0 of 1

Question:

How many types of catalog are there?

Please choose the correct answer.

Response:

Score 1 of 1

Question:

Identifies the various ways to navigate around SAP system.

There are 2 correct answers to this question.

Response:
Text

Using the menu entries

Using the favorites list

Insert

Clipboard

Score 0 of 1

Question:

Which rule applies to user status in orders and notifications?

Please choose the correct answer.

Response:

When a user status is flagged as an initial status, it overrides the initial system status CRTD.

When you set a new user status with a status number, the previous user status with status numbe
deactivated.

The user status in the notification can be copied into the order.

Every user, regardless of assigned authorizations, can assign a user status.

Score 0 of 1

Question:

The following entries are possible in the command field:

Choose the correct answer(s).

Response:
From SAP Easy Access: search_sap_menu

From SAP Easy Access: SM04

?SM04

/nsm04

/nex

/nend

Score 0 of 1

Question:

Identify the business purpose for which work center data is used

There are 2 correct answers to this question.

Response:

Public order

Personnel data

Notifications

Costing

External information

Score 0 of 1

Question:

Identify the possible external system.


There are 2 correct answers to this question.

Response:

Process control system

Positions

Items

Codes

Building control system

Score 0 of 1

Question:

What does the maintenance plan category determine?


Please choose the correct answer.

Response:

The grouping of similar maintenance plans together for reporting

The type of technical object for the maintenance plan

The type of maintenance call object the system generates for a due maintenance call

How maintenance call objects are generated for a due maintenance call

Score 0 of 1

Question:

Find out the elements responsible for performance management.

There are 3 correct answers to this question.

Response:
Project definition

Dispatch

Investment planning

Execution

Ordering

Score 1 of 1

Question:

How are the planned costs for the refurbished part or parts displayed in the
planned/actual order report?

Please choose the correct answer.

Response:

As costs with a negative value

As costs with a positive value

As revenue with a negative value

As revenue with a positive value

Score 0 of 1

Question:

What all are the steps sequenced for structuring of technical process?

There are 2 correct answers to this question.

Response:
Identify

Assign

Structure

Define

Execute

Score 1 of 1

Question:

Which of the following control characters is available in the edit mask of the
structure indicator?
Please choose the correct answer.

Response:

D (numeric characters)

Y (special characters)

A (alpha characters)

M (alphanumeric characters)

Score 1 of 1

Question:

What are the purposes of technical object structures?


There are 3 correct answers to this question.

Response:

To support Asset Accounting in the description of fixed assets


To enable detailed cost analyses

To display the total number of an asset's individual parts from a design engineering perspective

To collect historical data for maintenance objects

To identify objects and object parts for maintenance

Score 1 of 1

Question:

What do you mean by the term PMIS.

Please choose the correct answer.

Response:

Project management system

Project maintenance information system

Process management system

Plant maintenance information system

Score 0 of 1

Question:

Users need to be able to select operations and work centers from the task list
when they create a maintenance order with task list selection.

In Customizing, how can you accomplish this requirement?

There are 2 correct answers to this question.

Response:

By setting the indicators for the order type only


By setting the indicators for the planning plant only

By activating the operation selection indicator

By activating the work center selection indicator

Score 1 of 1

Question:

Your customer needs to review costs in a maintenance order at operation level.

Which Customizing steps must you perform?

Please choose the correct answer.

Response:

Set the account assignment indicator for the order type and assign the order type to the plants.

Set the account assignment indicator for the valuation variant and assign the valuation variant to
cost variant.

Set the account assignment indicator for the settlement profile and assign the settlement profile t
order type.

Set the account assignment indicator for the costing sheet and assign the costing sheet to the ord
type.

Score 1 of 1

Question:

What does the structure indicator for a functional location determine?


There are 3 correct answers to this question.

Response:

The number of characters for each hierarchy level


The number of hierarchy levels for a particular structure

The functional location type

The edit mask

The functional location category

Score 0 of 1

Question:

What are the general settings of maintenance notification?

There are 3 correct answers to this question.

Response:

List editor

Field selection

Condition indicator

Catalog

Managerial values

Score 0 of 1

Question:

Which is not the phase of corrective Maintenance

Please choose the correct answer.

Response:

Control
Notification

Base

Planning

Score 0 of 1

Question:

Plant maintenance strategies involve the following steps. Identify them

There are 3 correct answers to this question.

Response:

TPM

RCM

CAA

BAT

RBI

Score 1 of 1

Question:

A maintenance technician replaces a defective counter with a new counter.


Before the users can create a standard measuring document for the new
counter, what step(s) must they perform?

Please choose the correct answer.

Response:
Dismantle the old measuring point and create a new measuring point.

Create a new measuring point and change the measuring point from which the measurement read
was transferred.

Create a new technical object to represent the new measuring point.

Create a special measuring document and set the Counter Replacement indicator.

Score 0 of 1

Question:

Identify the resource that enables you to represent the wear and tear of an
object.

Please choose the correct answer.

Response:

Control

Items

Points

Counters

Score 0 of 1

Question:

The F1 key will provide you with the explanations of….

There are 3 correct answers to this question.

Response:

Purpose
Field

Functions

Add

Menus

Score 1 of 1

Question:

How do you define operations for preventive maintenance tasks?


Please choose the correct answer.

Response:

By assigning the operations directly to the maintenance plan

By assigning the task list to the maintenance item

By assigning the task list to the maintenance plan

By assigning the operations directly to the maintenance item

Score 0 of 1

Question:

What is the info cube dimensions?

Please choose the correct answer.

Response:

Project analysis

Message reader
Controller

Functional location/equipment

Maintenance

Score 0 of 1

Question:

What do you use to set up a refurbishment order for external refurbishment?


Please choose the correct answer.

Response:

An external operation that contains a control key for refurbishment.

An order type for external refurbishment and a material item with item category External
Refurbishment.

An order type for external refurbishment and an assignment of a material with split valuation.

An external operation that contains a subcontracting indicator and a material item with a

material provision indicator activated.

Score 0 of 1

Question:

You customize an order type to release orders immediately upon creation, and
you assign the order type to a maintenance item.

How can a user override the automatic release of the order without creating a
new order type?

Please choose the correct answer.

Response:

Select a maintenance activity type and set the Do Not Release Immediately indicator.
Set the Do Not Release Immediately indicator in planning data for the maintenance item.

Select a maintenance planner group and set the Do Not Release Immediately indicator.

Set the Do Not Release Immediately indicator in the task list header.

Score 0 of 1

Question:

What does the serial number profile control?


Please choose the correct answer.

Response:

Whether an individual part is assigned to a special stock

Whether split valuation is used to describe the value of an individual part

Whether serial numbers must be assigned for a business transaction

Whether a master batch is used for a serial number

Score 1 of 1

Question:

What is a method for loading data from source system datasets to a Data
Source extraction structure?

Please choose the correct answer.

Response:

Transfer structure

Info source

Info provider
Extractor

Score 1 of 1

Question:

What all are the 2 inputs of structure indicators

There are 2 correct answers to this question

Response:

The hierarchy levels

Middle levels

The edit screen

Upper levels

Bottom levels

Score 0 of 1

Question:

Which object do you use to assign number ranges for maintenance plans in
Customizing?
Please choose the correct answer.

Response:

Maintenance planner group

Maintenance plan category

Technical object
Maintenance item

Score 0 of 1

Question:

Your customer needs a maintenance order type for use with Test Equipment
Management in a maintenance plan.

Which Customizing setting must you make for the order type?

Please choose the correct answer.

Response:

Create a plant for inspection lots.

Assign an inspection lot to order type only.

Create an order type for Test Equipment Management.

Assign an inspection type to an order type with plant assignment.

Score 1 of 1

Question:

What do you mean by the term LIS.

Please choose the correct answer.

Response:

Logistic management

Logistic information system

Leveling system
Logistic controlling system

Score 1 of 1

Question:

When a user creates a notification or an order and enters a functional location


as the reference object, you want the system to suggest the subordinate
equipment automatically.

In addition to setting the reference object view in the order or the notification,
what other settings

must you make?

There are 2 correct answers to this question.

Response:

Set the Equipment-Installation Allowed indicator in the Functional Location master data record.

Set the Single Installation indicator in the equipment master data record.

Set the Single Installation indicator in the Functional Location master data record.

Set View Profiles for Technical Objects in Customizing.

Score 0 of 1

Question:

How can you maintain a distribution rule?


There are 2 correct answers to this question.

Response:

Automatically, according to value categories in the order

Automatically, based on a combination of Customizing and object master data

Manually, after the business completion for the order


Manually, prior to the first settlement

Score 1 of 1

Question:

For what maintenance manager is responsible.


Please choose the correct answer.

Response:

Execute the planning process

Multiple tasks

None of the above

Defining, controlling and triggering the budget planning process

Score 0 of 1

Question:

What is the definition of a Data Source?


Please choose the correct answer

Response:

An extraction structure for data transfer to SAP BusinessWarehouse

All available data of a business transaction type

A superordinate term for BI objects that can be analyzed using BEx queries

A superordinate term for characteristics, key figures, and units

Score 1 of 1
Question:

What does the cycle set sequence in a multiple-counter maintenance plan


determine?
Please choose the correct answer.

Response:

The scheduling sequence for a group of maintenance plans

The scheduling sequence of a maintenance item

The operation sequence of a maintenance order

The operation sequence of a task list

Score 1 of 1

Question:

Which task list can have both external and internal number assignment for the
task list group number?
Please choose the correct answer.

Response:

Functional location task list

General task list

Equipment task list

Bill of material task list

Score 1 of 1

Question:

The maintenance of a technical system comprises the following tasks:

Please choose the correct answer.


Response:

Construction

Project assistance

Closed system

Inspection

Evaluation

Score 0 of 1

Question:

What does the functional location category determine?


There are 2 correct answers to this question.

Response:

Whether a fixed asset from Asset Accounting can be assigned

The partner determination procedure

The functional location class

Whether you can create linear data for a functional location

Score 0 of 1

Question:

Which of the following information can the shift report display?


There are 3 correct answers to this question.

Response:

Digital signatures for approval of a shift report


Maintenance plans and task lists

Planned and actual costs for shifts

Measurement documents and goods movements

Maintenance orders and notifications

Score 0 of 1

Question:

Which of the following are maintenance work center functions?


There are 3 correct answers to this question.

Response:

Material planning

Capacity planning

Scheduling

Costing

Production resources/tools (PRT) allocation

Score 0 of 1

Question:

In a refurbishment order for external processing, where can you find


information about the defective part after the goods issue has been posted?

Please choose the correct answer.

Response:
In special stock type R (refurbishment stock), after the return from the service company and a

goods receipt posting

In special stock type F (customer order stock)

In special stock type O (parts provided to vendor)

In special stock type B (batch) after the return from the service company and a goods receipt

posting

Score 1 of 1

Question:

TO create a BOM for a functional location/ equipment BOM. You can use

Please choose the correct answer.

Response:

Material BOMs

Objects

Planning

Accounting

Score 0 of 1

Question:

What information does the value category provide in the maintenance order?
Please choose the correct answer.

Response:

A summary of costs for multiple cost elements


The material costs by valuation category

The costs details for individual technical objects

The costs by work center

Score 1 of 1

Question:

Which of the following are prerequisites for business completion?


There are 2 correct answers to this question.

Response:

The balance of the order must be zero.

The order must be fully settled.

The order must have planned costs.

The order must have actual costs.

Score 0 of 1

Question:

A user has planned an operation with labor costs and material costs; however,
the material cost element is not assigned to a value category. Where do the
material costs appear in the value categories for the order?

Please choose the correct answer.

Response:

In a new, automatically created value category

In the overhead value category


In the unassigned value category

In the internal activity value category

Score 0 of 1

Question:

Your customer wants to subdivide the maintenance organization by production


responsibility.

What do you use to designate the contact person for coordination between
production and plant maintenance?

Please choose the correct answer.

Response:

Production cost center

Work center

Plant section

Controlling area

Score 0 of 1

Question:

To which maintenance object types can you link a priority type?


There are 2 correct answers to this question.

Response:

The combination of the notification category and notification type

The order type only

The combination of the order category and order type


The notification type only

Score 0 of 1

Question:

What do maintenance planner groups represent?


Please choose the correct answer.

Response:

A group of persons who plan maintenance task lists

A group of persons responsible for maintenance plans

A group of persons who plan maintenance capacities

A group of persons who plan maintenance activities for technical assets

Score 1 of 1

Question:

Name the data which is created during the monitoring, controlling, regulation
and optimization of a technical process.

Please choose the correct answer.

Response:

Process control system

Measurement system

WAMP

Document entry
Score 0 of 1

Question:

In Customizing, to what data must you assign digital signatures in addition to


the order type?
Please choose the correct answer.

Response:

Maintenance plant

Work center

Maintenance planner group

Planning plant

Score 1 of 1

Question:

What do you mean by the term MCB

Please choose the correct answer.

Response:

Management cost breaker

Multiple cost breaker

Maintenance cost breaker

Maintenance cost budgeting

Score 1 of 1
Question:

You want to record changes to equipment master data fields in the usage
history. For which of the following objects can you activate the usage history?
Please choose the correct answer.

Response:

Planning plant

Equipment class

Equipment category

Object type

Score 1 of 1

Question:

Which of the following can you assign to a maintenance order operation?


There are 3 correct answers to this question.

Response:

Equipment

Maintenance order

Asset

WBS element

Measuring point

Score 0 of 1

Question:
Your customer wants to view a list of all planned materials in multiple
maintenance orders with order status CRTD.

Which of the following standard reports can you use to find the information
required?

There are 3 correct answers to this question.

Response:

The operation list

The material availability report

The order list

The order and operation list

The materials where-used report

Score 1 of 1

Question:

Your customer uses the dynamic availability check for stock material.

Where does the system check material availability for an operation?

Please choose the correct answer.

Response:

Only in the plant where the material is flagged with the special stock indicator for maintenance s

In all plants where the material is managed with serial numbers

Only in the plant where the material has been reserved

In all plants where material inventory exists


Score 0 of 1

Question:

Your customer wants to generate costing for internal activities.

For which of the following can you define various rates in Activity Type/Price
Planning transaction?

There are 3 correct answers to this question.

Response:

Plant

Value category

Cost center

Plan/actual version

Period

Score 0 of 1

Question:

What are the 2 reasons of the maintenance Bill of Material

There are 2 correct answers to this question.

Response:

Clearance

Structuring of the object

Planning in task list

Object identification
Distribution

Score 0 of 1

Question:

The view profile enables you to create a customized selection of tabs for use
with technical objects.

Which Customizing step(s) must you perform to make a view profile available?

Please choose the correct answer.

Response:

Activate customized tabs for each equipment category or functional location category.

Create the view profile in the master record of either equipment or functional location.

Create the view profile for a particular screen group and then assign it to a functional location
category or equipment category.

Create the view profile and assign it to an object type.

Score 0 of 1

Question:

What purpose does the maintenance planner group serve?


Please choose the correct answer.

Response:

It identifies a person or a group of persons who is responsible for planning maintenance

activities for a number of technical objects.

It identifies a person who is part of the main work center and who acts as the supervisor.

It represents a person or a group of persons who is responsible for maintaining task lists.
It determines which maintenance call object the system generates for a due maintenance call.

Score 0 of 1

Question:

All maintenance plans in your systems are scheduled automatically via deadline
monitoring. What happens when you set a manual call?
Please choose the correct answer.

Response:

The waiting call dates are re-scheduled on the basis of the manual call.

All scheduled calls on hold are deleted.

The original scheduled dates of the maintenance plan remain.

All scheduled calls on hold are skipped.

Score 0 of 1

Question:

Identify the conditions required for Project work

There are 3 correct answers to this question.

Response:

Time

Completion

Ability to solve issues.

Resource

Cost
Score 0 of 1

Question:

When you create a refurbishment order, which reference objects can you use?
There are 3 correct answers to this question.

Response:

Equipment with serial number

Material without serial number

Material with serial number

Functional location

Equipment without serial number

Score 1 of 1

Question:

What options are available in the maintenance order when you analyze costs
using value categories?

There are 2 correct answers to this question.

Response:

Display of values in an alternate currency

Display of costs by responsible work center

Display of costs by individual operations

Summary of actual costs across multiple cost elements


Score 0 of 1

Question:

What does the scheduling period determine in the maintenance plan scheduling
parameters?
Please choose the correct answer.

Response:

The duration for which the system generates maintenance orders immediately

The duration for which the system generates maintenance notifications immediately

The validity period of the maintenance plan

The duration for which the system generates planned or call dates during scheduling

Score 0 of 1

Question:

Which of the following components is included in SAP Solution Manager?


Please choose the correct answer.

Response:

SAP NetWeaver Business Warehouse

Service Desk

SAP NetWeaver Enterprise Search

Master data management

Score 1 of 1

Question:
Which of the following combinations must you use to create a single-cycle
maintenance plan for an external service?

Please choose the correct answer.

Response:

A framework order and a maintenance order for settlement

A maintenance order for settlement and an outline agreement

A framework order and a subcontract purchase order

A subcontract purchase order and an outline agreement

Score 0 of 1

Question:

What are the 2 options available for archiving order?

There are 2 correct answers to this question.

Response:

Copy orders

Order settlement

Manually enter historical orders

Refurbishment

Recognize orders.

Score 0 of 1

Question:
To display overhead costs in a maintenance order, you need to assign a costing
sheet in Customizing. To which parameter do you assign the costing sheet?

Please choose the correct answer.

Response:

Version for cost estimates

Valuation variant

Valuation categories

Costing type

Score 0 of 1

Question:

The SAP GUI offers you the following personalization options:

Choose the correct answer(s).

Response:

Changing the font size of the SAP GUI within certain limitations.

Displaying system messages in a dialog box.

Disabling the display of images in the SAP GUI.

Users can integrate a picture of their own in the SAP Easy Access screen.

Use of a personal input history on your front end.

Varying the size of input fields.

Score 0 of 1
Question:

When the user creates a maintenance plan for a call object (order), which value
in the planning data determines the order type?

Please choose the correct answer.

Response:

Main work center

Maintenance activity type

Priority

Maintenance planner group

Score 0 of 1

Question:

Your customer plans a plant shutdown and wants to use the Maintenance Event
Builder to plan revisions and create maintenance orders automatically. What
must you do in Customizing?

Please choose the correct answer.

Response:

Create a revision type and select WPS-Controlled.

Create a revision type and select Not WPS-Controlled.

Define transfer of project or investment program

Define field values for PM/PS Reference Element

You might also like