You are on page 1of 33

8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.

0 - Full | ERPPrep

SAP Certified Application Associate - Quality


Management with SAP ERP 6.0 - Full

You got 77 of 80 possible points.


Your score: 96 %

Question Results

Question: Score 1 of 1

You use a sampling scheme if you want to-


Please choose the correct answer.

Response:

Rest all answers are correct

Determine the number of physical samples, based on the lot size

Store how a decision is made to accept or reject a characteristic

Determine the number of physical samples based on the number of containers in


an inspection lot in sample management

Determine the sample size on the basis of the lot size, inspection severity, or
combination of inspection severity and AQL

Question: Score 1 of 1

What must you do in configuration to enable defects recording during an


inspection with inspection lots?
There are 2 correct answers to this question.

Response:

Activate the work flow template

Define the defect report type

Activate reference to Existing notifications.

https://www.erpprep.com/node/4830/take 1/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Assign the notification type to the inspection type.

Question: Score 1 of 1

The quality inspector check the receipt of incoming certificates in the future,
they want to manage the inbox for quality certificates independently for goods
receipts.

What do you activate to fulfill this requirement?


Please choose the correct answer.

Response:

Certificate profiles in certificate type

Status profiles in the certificate type

Certificate Control in the Q- info record in procurement

Enhanced certificate processing in the certificate type.

Question: Score 1 of 1

Your customer wants to add the quality score of a material as criterion for the
vendor evaluation. Where do you set the calculation procedure for the quality
score?

Please choose the correct answer.

Response:

Vendor master

Material master

Quality info record in procurement

UD code

Question: Score 1 of 1

Which type of control charts are based on the specified tolerance and control
the share of scrap in the process?
https://www.erpprep.com/node/4830/take 2/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Please choose the correct answer.

Response:

Acceptance charts

Shewhart charts

Statistical Graphics

mean-value chart

Question: Score 1 of 1

Your customer wants to automatically valuate the overall results of an audit


using the standard …….. Which valuation method book scores for the overall
result?

There are 2 correct answers to this question.

Response:

Valuation mode

Qualitative valuation

Quantitative valuation

Non relevant indicator

Question: Score 1 of 1

In a quality notification for a customer complaint, you can specify one or more
reference objects. A reference object has a relationship to the problem in a
quality notification. A customer complaint may include the following
reference objects:

There are 3 correct answers to this question.

Response:

Device Data

Customer

https://www.erpprep.com/node/4830/take 3/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Inspection Lot

Vendor

Question: Score 1 of 1

The inspection characteristics in Quality Management are integrated to which of


the following functions in production planning component?

There are 2 correct answers to this question.

Response:

Work scheduling

Inspection points

Work shifts

Production processing

Question: Score 1 of 1

Which of the following conditions have to be fulfilled for the material to be


immediately posted to unrestricted-use stock? (Required settings are made in
the inspection setup)

Please choose the correct answer.

Response:

Worklist

Quality lot

Inspection lot completion

Skip-to-stock

Question: Score 1 of 1

When you save the characteristic results, you make the confirmations for the
operation. You make the confirmations in accordance with the following

https://www.erpprep.com/node/4830/take 4/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

indicators-
There are 3 correct answers to this question.

Response:

Final confirmation

No confirmation

None of the above

Partial confirmation

Question: Score 1 of 1

In the screen “Valuate inspection point”, the system proposes a usage decision
code. A user can-
There are 2 correct answers to this question.

Response:

Change the Usage Decision code within the predefined code-group

Change the partial lot valuation

Change the Usage Decision code even outside of the predefined code-group

Change the partial lot valuation and description

Question: Score 1 of 1

Which indicator is used to activate quality management in procurement for all


plants of a client?

Please choose the correct answer.

Response:

Inspection w/o plant

QM active

100% inspection

QM procurement active
https://www.erpprep.com/node/4830/take 5/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Question: Score 1 of 1

What will you do if an inspection lot already exists for a production version and
it is incomplete?

Please choose the correct answer.

Response:

You can ignore and directly create a new one

You can create a duplicate inspection

You can save the current inspection and create a new one

You must first complete the current inspection lot before you create a new one

Question: Score 1 of 1

During an audit you document a finding. In the audit structure, what can link
an audit and a quality notification?
Please choose the correct answer.

Response:

Attached document

Business partner

Corrective/preventive action

Audit question

Rest all answers are correct

Question: Score 1 of 1

Which of the following have to be assigned to an inspection lot if you want to


record inspection results for inspection characteristics?

Please choose the correct answer.

https://www.erpprep.com/node/4830/take 6/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Response:

Inspection specification

Inspection characteristics

Inspection tasks

Inspection materials

Question: Score 1 of 1

Batch Management works in tandem with the Quality Management processes-


There are 2 correct answers to this question.

Response:

For Batch Management to work properly, the lot has to be full

In case of Batch Management, there cannot be any auto-creation of inspection-


lots

If a delivery is made up of batch requirement materials, partial lots can be


automatically formed for the inspection lot

The inspection of the individual batches is carried out with reference to the
relevant partial lot

Question: Score 1 of 1

Which of the following conditions should be met to be able to make a usage


decision when creating a task list with QM data?

Please choose the correct answer.

Response:

Assign a measuring point or counter to this piece of equipment

Rest all are correct

Create a piece of equipment as test equipment

You must have created the characteristic of the measuring point/counter with

https://www.erpprep.com/node/4830/take 7/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

reference to a class characteristic of the classification system.

You have created a master inspection characteristics in QM

Question: Score 1 of 1

You want to print a certificate for an outbound delivery, at which level is a


certificate printed?
Please choose the correct answer.

Response:

Delivery Item level

Shipping point level

Delivery header level

material level

Question: Score 1 of 1

On the basis of the vendor or manufacturer quality information stored for a


particular material

Please choose the correct answer.

Response:

The purchasing department can draw on quality-related information even if the


material has not been activated from Quality-point-of-view

The purchasing department can draw on quality-related information but not the
standard criteria (price, and so on) when selecting a vendor

The purchasing department cannot draw pricing related information from the
Info-records

The purchasing department can draw on quality-related information in addition to


the standard criteria (price, and so on) when selecting a vendor

Rest all answers are correct

https://www.erpprep.com/node/4830/take 8/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Question: Score 1 of 1

If a customer master record has been created for a customer, you can use the
quality information record in sales to define inspection-relevant specifications
for the customer-

Please choose the correct answer.

Response:

These specifications apply to all materials that are delivered to the customer and
include the control parameters quality inspection, delivery category and
documents.

These specifications don’t apply to all materials that are delivered to the
customer and includes only those which where the Inspection-lot was cleared
lastly

These specifications apply to all materials that are delivered to the customer but
don’t include the control parameters as there is a different provision for this
inclusion

These specifications don’t apply to all materials that are delivered to the
customer
and includes only those which where the Inspection-lot was passed lastly

Rest all answers are correct

Question: Score 1 of 1

Which inspection lot setting will you use for goods movement if you are
working with materials that are subject to batch management?

Please choose the correct answer.

Response:

‘X’ One inspection lot for each purchase order item/order item

‘2’ One inspection lot for each material and batch

‘1’ One inspection lot for each material document and material

‘ ’One inspection lot for each material document item

https://www.erpprep.com/node/4830/take 9/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Question: Score 0 of 1

Your customer wants to periodically calibrate the quality management test


equipment used in an inspection plan. Which type of test equipment must used?
Please choose the correct answer.

Response:

Equipment

Materials

Documents

Production resource/ tools PRTs

Question: Score 1 of 1

Which catalogue types require the use of selection sets?


There are 2 correct answers to this question.

Response:

Actions

Defect type

Usage decision

Characteristic

Tasks

Question: Score 1 of 1

In sample-drawing procedure the following are applicable:


There are 3 correct answers to this question.

Response:

Reserved Samples

Primary Samples

https://www.erpprep.com/node/4830/take 10/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Pooled Samples

Standard Samples

Question: Score 1 of 1

What are the various options available to mange test equipment?

There are 3 correct answers to this question.

Response:

Equipment

Services

Material master

Document master

Question: Score 1 of 1

In an inspection during production, the system creates an inspection lot for a


production order. The system can create inspection lots for the following order
types-

There are 3 correct answers to this question.

Response:

Maintenance task list

Run Schedule Headers (Rate routing)

Process Orders (Master recipe)

Production Orders (Routing)

Question: Score 1 of 1

Your customer requires the lab to use quantitate characteristics during a


production result recording. Which result confirmation control indicators are
available for quantitative results?

https://www.erpprep.com/node/4830/take 11/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

There are 3 correct answers to this question.

Response:

Summarized

Mean value

Class confirmation

Tolerance keys

Single value

Question: Score 1 of 1

You can define default values for users for the following data (Quality
Notifications):
There are 3 correct answers to this question.

Response:

Purchasing/internal data (for example, purchasing organization or work center)

General data (for example, notification type, reference object, or contact person)

Sales and distribution data (for example, sales organization)

Plant Maintenance data (for example work orders)

Question: Score 1 of 1

Under which of the following conditions the posting of the goods issue does
not necessarily have to wait until the usage decision has been made and the
goods have been accepted?

Please choose the correct answer.

Response:

Inspection performed parallel to shipping

Inspection performed after shipping

Inspection by customer is present in the system


https://www.erpprep.com/node/4830/take 12/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Goods have been issued

Question: Score 1 of 1

All physical samples processed in a stability study are associated with exactly
one physical-sample drawing number, which is created automatically by the
system when you create the initial sample.
Please choose the correct answer.

Response:

Rest all answers are correct

This physical-sample drawing number applies to all of the physical samples that
are created and processed over the entire course of a stability study.

This physical-sample drawing number applies to all of the physical samples that
are created and processed only during the active course of a stability study.

This physical-sample drawing number applies to all of the physical samples that
are created but not processed during the active course of a stability study.

This physical-sample drawing number applies to all of the physical samples that
are created but not processed during the entire course of a stability study.

Question: Score 1 of 1

Which inspection origin creates only unplanned physical samples?


Please choose the correct answer.

Response:

16 stability study

15 sample management

03 production

02 goods issue

Question: Score 1 of 1
https://www.erpprep.com/node/4830/take 13/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

The basis of stability study is:


Please choose the correct answer.

Response:

Quality information record

Quality management plan

Rest all answers are correct

Quality notification

Quality inspection plan

Question: Score 1 of 1

Wich partner role is available in a standard vendor notification?


Please choose the correct answer.

Response:

shipping point

sold to party

work center

coordinator

Question: Score 1 of 1

Which of the following is used as a basis after an inspection lot has been
released in order for inspection results to be recorded, and you need to make
allowances for additional characteristics for results recording?

Please choose the correct answer.

Response:

Fully maintained master inspection characteristics

sampling procedure

Partially maintained master inspection characteristics


https://www.erpprep.com/node/4830/take 14/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Master inspection task list

Question: Score 1 of 1

Which of the following documents can you use as a reference document. When
creating a vender notification?
There are 3 correct answers to this question.

Response:

Framework order

Quotation

Outline agreement

purchase order

Material order

Question: Score 1 of 1

You have assigned a dynamic modification level to an inspection plan Which


dynamic modification criterion is pre-defined and not editable?
Please choose the correct answer.

Response:

Manufacturer

Material

Vendor

Customer

Question: Score 1 of 1

During which of the following steps in a business process does a dynamic


modification rule change severely?
Please choose the correct answer.

https://www.erpprep.com/node/4830/take 15/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Response:

the creation of a certification

The creation of a notification

Creation of a batch

The creation of a inspection Lot

Question: Score 1 of 1

When you plan an audit for which component can you define partners?
There are 2 correct answers to this question.

Response:

Question

CAPA

Audit Question

Audit

Question: Score 1 of 1

The overall stability study process supports the following activities:


There are 3 correct answers to this question.

Response:

Creating the Stability Study

Performing the stability tests

Creating, confirming, but not testing the initial sample as that is taken care
through the “Test data Management”

Planning the stability tests

https://www.erpprep.com/node/4830/take 16/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Question: Score 1 of 1

While creating a production version for an inspection lot, how the quality will
be affected if the dynamic modification rule specifies that the quality level must
be updated when the usage decision is made?

Please choose the correct answer.

Response:

the system creates one

the system deletes quality level now

the system updates the quality level now

the system does not update the quality level now

Question: Score 1 of 1

The following specifications can only be changed at inspection lot creation


There are 2 correct answers to this question.

Response:

Control indicator-Required characteristic only

Operation short text

Sampling procedure

Control indicator optional characteristic only

Question: Score 1 of 1

________ are used to track quality issues and trigger further actions, such as
rework or scrapping. Please choose the correct answer(s) to fill the blank

Please choose the correct answer.

Response:

Quality Notifications

Certificates of Acceptance/Rejection

https://www.erpprep.com/node/4830/take 17/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Certificates of Approval

Quality Certificates

Question: Score 1 of 1

When you complete the stability study:


There are 2 correct answers to this question.

Response:

The system deactivates the testing schedule.

The system locks all of the physical samples that belong to the study (initial
sample and stability samples) including any outstanding inspection lots
remaining.

The system sets the user status COMP (completed) in the stability study. This
status cannot be revoked and it prevents any other user statuses from being
set in the study.

The system locks all of the physical samples that belong to the study (initial
sample and stability samples). If there are any outstanding inspection lots
remaining, you must cancel these or make the usage decision for them.

Question: Score 1 of 1

Which type of inspection lot do you use to inspect the completed production
goods before the stocks are posted to the warehouse stock in a goods receipt?

Please choose the correct answer.

Response:

Inspection lot for a production inspection (lot origin 03)

Inspection lot for a goods receipt from production (lot origin 03)

Inspection lot for process inspection (lot origin 03)

Inspection lot for a goods receipt from production (lot origin 04)

https://www.erpprep.com/node/4830/take 18/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Question: Score 1 of 1

Regarding Sales Order creation in a Process-Industry scenario, what all apply-


There are 3 correct answers to this question.

Response:

A sales order is created with make-to-order (MTO)

A sales order is not relevant to the Process-Industry scenario

A sales order is created using a material variant

A sales order is created using product-describing attributes

Question: Score 0 of 1

In Audit Management, the information relevant to the data elements becomes


available if the-

Please choose the correct answer.

Response:

Audit objects are cleared through the Quality Management processes

Rest all answers are correct

Audit object can be defined by Data elements from repository resulting from the
Information Record maintained

Audit object can be defined by Data elements from repository such as


combination of supplier and material

Pre-Audit approvals are in place

Question: Score 1 of 1

While maintaining Default settings at plant-level for QM, a user-field definition


for inspection points has to be specified-
There are 2 correct answers to this question.

Response:

By specifying a user field combination in the task list header of each task list, the

https://www.erpprep.com/node/4830/take 19/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

plant-dependent settings defined in Customizing can’t be overwritten

By specifying a user field combination in the task list header of each task list, you
can override the plant-dependent settings defined in Customizing

If you do not maintain this field in the task list header, the system copies the
respective settings defined in Customizing into the inspection lot

The Settings defined in Customizing cannot be copied into the inspection lot as
both become de-linked when a user-field definition for inspection points is
specified

Question: Score 1 of 1

Which of the following charts take into account only internal process
parameters and not external tolerance specifications?
Please choose the correct answer.

Response:

Western Electric Chart

Acceptance Chart

Shewhart Chart

Planning Control Chart

Question: Score 1 of 1

To which notification structure elements or objects can you assign catalog


types?
There are 3 correct answers to this question.

Response:

Action

Documents

Header

Task

https://www.erpprep.com/node/4830/take 20/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Partner

Question: Score 1 of 1

When the quality certificates are created, the system retrieves information from
its environment, this includes data from-

There are 2 correct answers to this question.

Response:

Quality Management (Inspection lot, Usage decision, Inspection results)

Sales and Distribution (Sales Order)

Materials Management (Delivery)

Production Planning (Batch Master)

Question: Score 1 of 1

What is required in inspection planning to transfer a characteristic value from


results recording of inspection lot processing ………
Please choose the correct answer.

Response:

Master inspection characteristic linked to class characteristics

Usage of the class characteristics in the task list

Settings for the inspection type activated in the material level

Configuration settings

Question: Score 1 of 1

The pre-requisite(s) to create inspection lots in the production order or


process order is/are-
There are 3 correct answers to this question.

Response:

https://www.erpprep.com/node/4830/take 21/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

The inspection data for the material to be produced has been maintained in the
Quality management view of the material master. The corresponding inspection
types can be activated even after creation of Inspection lots

The order has not been completed technically

The inspection data for the material to be produced has been maintained in the
Quality management view of the material master and the corresponding
inspection types have been activated

The order does not contain a deletion indicator or deletion flag in the header

Question: Score 1 of 1

What are procedures available for operation-based results recording?


There are 2 correct answers to this question.

Response:

choose Results -> for an operation

direct entry to results recording using the worklist function

choose Results -> results recording

choose Results -> worklist function

Question: Score 1 of 1

Your consumer want the section of a usage decision code to automatically


trigger a goods movement. Where do you make the settings to enable this?
Please choose the correct answer.

Response:

in the code groups and code

in the movement type

in the inspection type

in the selected set.

https://www.erpprep.com/node/4830/take 22/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Question: Score 0 of 1

How does the system handle equipment and functional locations in an


inspection lot in calibration inspection?
Please choose the correct answer.

Response:

As a characteristic

As a inspection point

As physical sample

As a material

Question: Score 1 of 1

You store the quality-based control information for the combination of vendor
or manufacturer and material in the quality information record procurement:

There are 3 correct answers to this question.

Response:

Certificate processing but not Inspection control

Release status type (model, vendor of regular deliveries etc.)

Release quantity

Release periods

Question: Score 1 of 1

To monitor the production process continuously with respect to the inspection


characteristics what do you recommend from the below?

Please choose the correct answer.

Response:

Partial lots do apply, but the Usage Decisions can’t be linked to partial lots

Allocate inspection points with the different usage decisions to partial lots

https://www.erpprep.com/node/4830/take 23/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Partial lots do not apply in the scenario in picture

Allocate inspection points with the same usage decision to partial lots

Question: Score 1 of 1

Your business requirements demand production triggers. Which of the


following events in production can create an inspection lot?
There are 3 correct answers to this question.

Response:

Goods Movement

Dead line monitoring /batch monitoring

ATP check

Order Creation

Order Release

Question: Score 1 of 1

Which settings are required for the immediate creation of inspection instruction
during goods receipt process?
There are 3 correct answers to this question.

Response:

Inspection type settings in the implementation guide (IMG)

Settings for print control in implementation Guide (IMG)

Control setting in characteristic of the task list

Control setting in quality info record

Inspection type settings in Material master

Question: Score 1 of 1

https://www.erpprep.com/node/4830/take 24/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

In SAP, there is a provision to create Quality Notification for a production


Order. Which of the following hold true regarding this provision-

There are 3 correct answers to this question.

Response:

The transaction ‘CO11N’ is blocked in this provision due to Quality restrictions

If you are creating a new quality notification, you can freely define the notification
type

You can do so from the operation confirmation for the production order

If notifications already exist for the production order (for example, notifications
related to defects recording), then you can process these notifications

Question: Score 1 of 1

For what type of cost collector does an inspection lot capture appraisal and non
conformity costing?
Please choose the correct answer.

Response:

A company code general ledger

A quality Notification

A quality management order

A controlling general ledger

Question: Score 1 of 1

Which type of task list defines process steps independently of the inspection
lot?
Please choose the correct answer.

Response:

Routing

Reference object set

https://www.erpprep.com/node/4830/take 25/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Master recipe

Inspection plan

Question: Score 1 of 1

Which of the following determines how the sample is calculated in the sampling
procedure?

Please choose the correct answer.

Response:

Variable sampling parameter

Fixed sampling parameter

Valuation mode

Sampling type

Question: Score 1 of 1

For which structure elements of a quality notification can you assign a status
profile?
There are 2 correct answers to this question.

Response:

Items

Activities

Follow up actions

Header

Tasks

Question: Score 1 of 1

https://www.erpprep.com/node/4830/take 26/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

While calculating the share of defects, which distribution category is only used
for characteristics with at least one tolerance limit for which the measured
values are confirmed?

Please choose the correct answer.

Response:

Binomial distribution

Poisson distribution

Normal distribution

Multiple distribution

Question: Score 1 of 1

You have to carry-out “Inspection Planning” in the Automobile Industry space.


What cross-application data will you focus on?
There are 2 correct answers to this question.

Response:

Material specification

Customer Info record

Batch Classification

Quality Info record-Procurement

Question: Score 1 of 1

Which of the following conditions should be satisfied for an inspection lot to be


created automatically as soon as the warehouse receipt is posted?

Please choose the correct answer.

Response:

Inspection plan indicator set

Appropriate inspection plan is entered in the material

https://www.erpprep.com/node/4830/take 27/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Appropriate inspection type is entered in the material

Warehouse receipt indicator set

Question: Score 1 of 1

What happens to the characteristics that are valuated for the configuration but
do not exist in the task list or material specification?

Please choose the correct answer.

Response:

Set to pending status

They are not inspected

Inspected

Set to deletion status

Question: Score 1 of 1

During an in process inspection for production orders, such as inspection type


09, which inventory posting is possible?
Please choose the correct answer.

Response:

Blocked stock

Unrestricted Stock

None

Quality stock

Question: Score 1 of 1

A dynamic modification rule contains the definition of the inspection stages, the
dynamic modification time, and the conditions that lead to an inspection stage
change. The functions for maintaining and displaying dynamic modification

https://www.erpprep.com/node/4830/take 28/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

rules are primarily contained on three screens. Please select what are
appropriate for these screens:

There are 3 correct answers to this question.

Response:

On the initial screen, you enter the identifier for the dynamic modification rule

On the header data screen, you maintain a short text and the blocking indicator

On the inspection stages screen, you edit the inspection stage data but cannot
create the rules for the inspection stage change on this screen

On the inspection stages screen, you edit the inspection stage data and can also
create the rules for the inspection stage change on this screen

Question: Score 1 of 1

If a delivery for a product or a material is created, then QM automatically


generates an inspection lot for the inspection relevant delivery items-

There are 2 correct answers to this question.

Response:

If the delivery is not received, the delivery-item doesn’t become inspection


relevant

A delivery item can be inspection relevant even if it has not been so indicated in
the master record

W hen a delivery is created, the Quality-relevant settings start to apply

A delivery item is inspection relevant if the corresponding control parameters are


active in the sales processes and in QM

Question: Score 1 of 1

In the material master, at which organizational level do you create Quality


management (QM) data for inspection type.
Please choose the correct answer.

Response:

Plant level

https://www.erpprep.com/node/4830/take 29/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Business area level

Client level

Company code level

Question: Score 1 of 1

Physical-sample drawing data of a sample record covers information about


physical drawing. This can cover-

There are 2 correct answers to this question.

Response:

Status of the physical sample

Sample type

Storage duration

Lot sample container unit

Question: Score 1 of 1

In procurement, the QM component has functions for managing, controlling,


and processing the following objects

There are 3 correct answers to this question.

Response:

Vendor and manufacturer

Material and vendor

Quota Arrangement

Material

Question: Score 1 of 1

https://www.erpprep.com/node/4830/take 30/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

Which of the following according to PP customizing settings can the system


propose if the inspection point completion variant allows confirmation?

There are 3 correct answers to this question.

Response:

Partial confirmation

Final confirmation

Automatic confirmation

No confirmation

Question: Score 1 of 1

How do you determine the stage at which quality control takes place for
particular combination of material and customer?

Please choose the correct answer.

Response:

Customer info record

Delivery category

Preliminary series

Quality info record

Question: Score 1 of 1

The IMG includes a customizing activity in which you assign object categories
to a notification type. Which of the following object category already exist in
standard setting?

There are 2 correct answers to this question.

Response:

Order(pp-pi)

Serial number

https://www.erpprep.com/node/4830/take 31/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

material

Purchase order item

Batch

Question: Score 1 of 1

You can user business application programing interface (BAPIs) for different
tests. Which of the following statements describes a BAPI?
Please choose the correct answer.

Response:

A customer exit

An enhancement point

A reporting transaction

Complex function module

Question: Score 1 of 1

The Pre-requisite(s) for “Quality Management in Discrete Manufacturing”


is/are-
There are 2 correct answers to this question.

Response:

Both ‘a’ and ‘b’ above, but ‘b’ preceding ‘a’

Both ‘a’ and ‘b’ above, but a preceding b (special characteristic of “Quality
Management in Discrete Manufacturing”)

Execute the Material Requirements Planning

Run the Cost-Run

Question: Score 1 of 1

https://www.erpprep.com/node/4830/take 32/33
8/13/2020 SAP Certified Application Associate - Quality Management with SAP ERP 6.0 - Full | ERPPrep

What happens if the batch or storage location differs from the planned batch or
storage location at the time of goods receipt?

Please choose the correct answer.

Response:

Inspection lot gives an error

New inspection lot is created

Inspection lot marked as defective

Inspection lot is deleted

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us