Securityclassification:BPInternal
Organisation
B02 Issued for Use Mike T Brown 4 Oct 2013 Michael Ho 4 Oct 2013 Mike T Brown 4 Oct 2013
B01 Issued for Use Mike T Brown 8 Apr 2013 Michael Ho 8 Apr 2013 Mike T Brown 8 Apr 2013
Rev Reason for Issue Author Date Checked Date Approved Date
Refresh Cycle Code (years) N/A Expiry Date N/A
Retention Code (years) N/A Delete Date N/A
This document is copyright and shall not Rev
be reproduced without the permission of
BP GPO-EN-SPE-36103 B02
Foreword
ThisisarevisedissueofGIS36-103.Thisfollowingsummarisesthemain
technicalchanges:
• CrossreferencestoGIS36-041,GIS36-042andGIS36-320have
beenremoved.
• Requirementsrelatingtopre-definedquantificationofPMI
examinationhavebeenremoved.
• Requirementsrelatingtowetchemistrymethodshavebeen
removed
• QA/QCrequirementshavebeenremoved.
• Requirementsforfabricatedcomponentsandfieldpipinghavebeen
revised.
Technicalchangestothisdocumentareindicatedbyabarintheleftmargin.
GIS 36-103
04October2013
EngineeringTechnicalPractice
Engineering
SpecificationforPositiveMaterialsIdentification(PMI)
Table of Contents
Page
1 Scope .................................................................................................................................... 3
2 Normative references............................................................................................................. 3
3 Terms and definitions............................................................................................................. 3
4 Symbols and abbreviations .................................................................................................... 4
5 Order of precedence .............................................................................................................. 5
6 PMI requirements .................................................................................................................. 5
7 PMI personnel........................................................................................................................ 5
8 General PMI considerations ................................................................................................... 6
9 Requirements for coverage, marking and reporting................................................................ 7
10 Custom and specialty engineered components ...................................................................... 8
11 Fabricated components ......................................................................................................... 9
12 Deliverables ........................................................................................................................... 9
Annex A (Informative) PMI report form template ........................................................................... 11
Bibliography .................................................................................................................................. 12
List of Tables
Page2of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
1 Scope
a. This Specification provides requirements for the positive materials identification (PMI)
verification process of low and medium alloy steels, high alloy steels, stainless steels, nickel
base alloys, copper based alloy and titanium solid base metal, during both procurement and
construction.
b. This Specification provides requirements for the PMI of materials owned or purchased for
use either by Company or by suppliers.
c. This Specification provides requirements for PMI undertaken at supplier’s works or at
request of Company responsible engineer.
d. This Specification provides requirements for the use of PMI on a construction or operations
site for application to received materials and installed equipment fabrications or assemblies,
and for identification of suspect rogue materials.
e. This Specification does not apply to primary material sources, only for intermediates or
fabricators, as stated by Company in the Purchase Order documentation.
f. This Specification excludes requirements for:
1. Alloy quantitative analysis, either for composition certification or composition pass/fail
(i.e. in situ composition analysis).
2. Checks of non-metallic materials.
3. Measurement of carbon content using laboratory wet chemistry methods as used to
identify low carbon grades of 300 series austenitic stainless steels (304L, 316L, etc.).
4. Weld metal deposit cladding or overlay.
g. This Specification may be used for equipment associated with drilling, subsea and marine
systems under the supervision of a Company responsible engineer.
2 Normative references
The following documents are referenced in one or more requirements in this document. For dated
references, only the version cited applies. For undated references, the latest version of the referenced
document (including any amendments) applies.
For the purpose of this Specification, the following terms and definitions apply:
Alloy materials
Any metals other than carbon steel, cast or ductile iron, copper, and copper alloys.
Company
BP p.l.c., an associate or subsidiary, or other organisation acting as owner, purchaser, or customer as
designated in the Purchase Order.
Page3of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
Company documents
Shall mean any document provided by Company.
Heat
Primary melt of a metal (this generally determines the chemistry. If the material is remelted then the
remelt composition becomes the heat).
Company inspector
Company appointed engineer or inspector.
Lot or batch
A quantity of the same or similar items made in a grouping, for example made at similar time, using the
same source components (such as steel from the same heat), and/or with same manufacturing process.
Fabricator
Entity or sub-supplier assembling an item.
Supplier
Entity entering into a contract with Company to provide materials, goods, supplies, equipment, or plant
and includes the successors and (or) permitted assigns of such entity.
For the purpose of this Specification, the following symbols and abbreviations apply:
Page4of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
5 Order of precedence
a. The order of precedence of the codes and standards quoted in the specifications shall be:
1. International and local statutory regulations.
2. Project data sheets.
3. Project specifications.
4. This Specification.
5. Referenced Company documents.
6. Referenced national and international codes.
b. Areas of apparent conflict between documents shall be brought to the attention of Company
for resolution.
c. In the event of a conflict between this document and a relevant law or regulation, the
relevant law or regulation shall be followed. If the document creates a higher obligation, it
shall be followed as long as this also achieves full compliance with the law or regulation.
d. Design, engineering, procurement, and construction for equipment shall comply with the
statutory laws and regulations of the final location of the asset. Refer to documents identified
in the Purchase Order for a list of these regulations.
6 PMI requirements
7 PMI personnel
Page5of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
a. PMI results shall verify the presence of the chemical elements listed in Table 1 and as
identified in the MTR for that specific component.
b. Company responsible engineer shall be consulted for materials not listed in Table 1.
Page6of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
Page7of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
a. PMI shall be completed on custom and speciality engineered components, if required by the
Purchase Order.
b. Written procedures for in-house QA/QC for PMI shall be submitted for Company approval.
Page8of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
11 Fabricated components
a. Quantitive PMI of welds shall be undertaken if specified in the Purchase Order, or requested
by Company responsible engineer or Company inspector.
b. If Company inspector discovers unidentified welding consumables being used on materials
subject to PMI examination, the welds in question shall immediately be placed on hold until
the consumable material is established using the criteria in this Specification.
c. For welds which fail PMI.
1. All remaining welds in the piece of equipment or piping shall receive PMI.
2. Other components being fabricated by the same supplier using the same qualified and
approved welding procedure in the same workshop or field location shall be reviewed
for the need of additional PMI.
d. Company may elect to perform additional PMI on high alloy weld root pass, if accessible,
from the root side or prior to weld fill-out, to confirm the use of the correct consumable.
12 Deliverables
a. Technical data, registers, documents, and drawings that together define the scope of the
Purchase Order shall conform to the requirements for supplier information identified in the
Purchase Order.
b. The following documents shall be submitted for agreement by Company before starting the
work:
1. PMI procedure.
2. PMI programme.
3. PMI operator qualification certificates.
4. PMI test report (blank template).
c. PMI reports shall be included in the final data package.
d. A log shall be maintained to document material and welding PMI.
e. PMI test reports shall be traceable to the certified material test certificates.
f. Each PMI test report shall include the following information in the typical format shown in
Annex A.
1. Name and address of Supplier.
2. Purchase Order number, or contract number.
3. Date of test and location.
4. Technician name.
5. Technician signature.
6. Equipment used its serial number and calibration date.
7. Procedure number.
8. Description of the inspected components.
9. Item tag number, line number, line item number and weld number.
10. Reference to UNS number and grade of the inspected materials specification or
welding consumable.
11. Heat and lot number.
Page9of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
Page10of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
Annex A
(Informative)
PMI report form template
* "Component" refers to the specific elbow fitting, pipe segment, plate, etc. being inspected.
Revision Register
Date Inspector Name & Signature Rev Date Aproval - Name & Signature
Page11of12 GIS36-103
04October2013
SpecificationforPositiveMaterialsIdentification(PMI)
Bibliography
[1] ASME II Part C, Boiler and Pressure Vessel Code, Section II: Materials - Part C: Specifications for
Welding Rods, Electrodes and Filler Metals.
[3] DWGOM GIS 36-103-1, Positive Material Identification (PMI) for Pressure Vessels, Piping, and Other
Components Rev 0, 14th June 2011.
[4] GIS 18-012, Specification for Procurement, Storage, and Control of Welding Consumables.
Page12of12 GIS36-103
04October2013