ITEM DESCRIPTION QTY UNIT RATE

PROVISIONAL SUMS (INCLUSIVE OF 10% MAIN


CONTRACTOR'S ATTENDANCE, CO-ORDINATION, OH &
PROFIT)

A Allow a Provisional Sum of Dhs 66,000 for De-watering & 1.00 P.S.
Shoring works

A.1 Add: Profit & Overheads 1.00 Included in the ab

B Allow a Provisional Sum of Dhs. 100,000 for Sanitaryware, 1.00 P.S.


accessories including shower cubicles, shower doors &
mirrors
B.1 Add: Profit & Overheads 1.00 Included in the ab

C Allow a Provisional Sum of Dhs 50,000 for Light Fittings 1.00 P.S.
C.1 Add: Profit & Overheads 1.00 Included in the ab

D Allow a Provisional Sum of Dhs 27,500 for Electrical 1.00 P.S.


switches & sockets (Including lighting control)
D.1 Add: Profit & Overheads 1.00 Included in the ab

E Allow a Provisional Sum of Dhs 130,000 for Lift including 1.00 P.S.
interior fitout work
E.1 Add: Profit & Overheads 1.00 Included in the ab

F Allow a Provisional Sum of Dhs 16,500 for Video Intercom 1.00 P.S.
System
F.1 Add: Profit & Overheads 1.00 Included in the ab

G Allow a Provisional Sum of Dhs 82,500 for Steam room & 1.00 P.S.
Sauna in Gym Changing room including doors
G.1 Add: Profit & Overheads 1.00 Included in the ab

H Allow a Provisional Sum of Dhs 50,000 for Vanity Counters 1.00 P.S.
in Bathroom areas
H.1 Add: Profit & Overheads 1.00 Included in the ab

J Allow a Provisional Sum of Dhs 22,000 for All Ironmongery 1.00 P.S.
for Doors, Wardrobes, Kitchen Cabinets, etc.
J.1 Add: Profit & Overheads 1.00 Included in the ab

BILL NO.06 1/6


BILL No.6 - PROVISIONAL SUMS

ITEM DESCRIPTION QTY UNIT RATE

K Allow a Provisional Sum of Dhs 22,000 for WC marble back 1.00 P.S.
wall cladding & Top in Bathrooms
K.1 Add: Profit & Overheads 1.00 Included in the ab

L Allow a Provisional Sum of Dhs 58,000 for Vehicle entrance 1.00 P.S.
Gate, Pedestrian Gate & Wrought Iron Railing (Front) to
Boundary wall.
L.1 Add: Profit & Overheads 1.00 Included in the ab

M Allow a Provisional Sum of Dhs 50,000 for Hard 1.00 P.S.


Landscaping including lighting works
M.1 Add: Profit & Overheads 1.00 Included in the ab
Carried Forward Page 1
Brought Forward Page 2
A Allow a Provisional Sum of Dhs 50,000 for Soil Filling, 1.00 P.S.
External leveling, Sweet Soil, Soft Landscaping &
Irrigation works
A.1 Add: Profit & Overheads 1.00 Included in the ab

B Allow a Provisional Sum of Dhs 250,000 for Aluminium and 1.00 P.S.
Glazing works including Mechanical room & Pump room
doors
B.1 Add: Profit & Overheads 1.00 Included in the ab

C Allow a Provisional Sum of Dhs. 65,000/= Metal Works 1.00 P.S.


(Pipe/Glass/Wrought Iron railing for balcony, staircase
handrailng, Void area railing & Cat ladder, etc)

C.1 Add: Profit & Overheads 1.00 Included in the ab

D Allow a Provisional Sum of Dhs. 150,000/= for Wardrobes 1.00 P.S.

D.1 Add: Profit & Overheads 1.00 Included in the ab

E Allow a Provisional Sum of Dhs. 50,000/= Kitchen Cabinets 1.00 P.S.

E.1 Add: Profit & Overheads 1.00 Included in the ab

F Allow a Provisional Sum of Dhs. 100,000/= for Timber 1.00 P.S.


Doors
F.1 Add: Profit & Overheads 1.00 Included in the ab

G Allow a Provisional Sum of Dhs. 200,000/= for Ceiling 1.00 P.S.


Finishes
G.1 Add: Profit & Overheads 1.00 Included in the ab

BILL NO.06 2/6


BILL No.6 - PROVISIONAL SUMS

ITEM DESCRIPTION QTY UNIT RATE

H Allow a Provisional Sum of Dhs. 250,000/= for Heat 1.00 P.S.


Ventilation and Air Conditioning Works
H.1 Add: Profit & Overheads 1.00 Included in the ab

J Allow a Provisional Sum of Dhs. 200,000/= for Swimming 1.00 P.S.


Pool
J.1 Add: Profit & Overheads 1.00 Included in the ab

K Allow a Provisional Sum of Dhs. 50,000/= for Gym 1.00 P.S.


Equipments
K.1 Add: Profit & Overheads 1.00 Included in the ab

L Allow a Provisional Sum of Dhs. 20,000/= for CCTV 1.00 P.S.


L.1 Add: Profit & Overheads 1.00 Included in the ab

Carried to Grand Summary Page 2

BILL NO.06 3/6


LL No.6 - PROVISIONAL SUMS

TOTAL (Dhs.)

Included in the above Item-A

Included in the above Item-B

-
Included in the above Item-C

Included in the above Item-D

Included in the above Item-E

Included in the above Item-F

Included in the above Item-G

Included in the above Item-H

Included in the above Item-J

BILL NO.06 4/6


LL No.6 - PROVISIONAL SUMS

TOTAL (Dhs.)

Included in the above Item-K

Included in the above Item-L

Included in the above Item-M


-
-
-

Included in the above Item-A

Included in the above Item-B

Included in the above Item-C

Included in the above Item-D

Included in the above Item-E

Included in the above Item-F

Included in the above Item-G

BILL NO.06 5/6


LL No.6 - PROVISIONAL SUMS

TOTAL (Dhs.)

Included in the above Item-H

Included in the above Item-J

Included in the above Item-K

-
Included in the above Item-L

BILL NO.06 6/6