You are on page 1of 2

BILL No.

4 - MEP WORKS

ITEM
DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

MEP WORKS
A Plumbing & Drainage works as per the drawings 1 Item -

B Electrical works as per the drawings 1 Item -

Heat Ventilation and Air Conditioning works (covered


C under the provisonal sum item) 1 Item -

D Builder's works for the above MEP works 1.00 Item -

BILL NO.04 1/2


BILL No.4 - MEP WORKS

ITEM
DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to Grand Summary Page 1 -

BILL NO.04 2/2

You might also like