Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both

Sides

CONTRACT PACKAGE NO. DS-2


Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)

GRAND SUMMARY FOR PART-1: CONSTRUCTION PHASE WORKS AND PART -2: MAINTENANCE PHASE WORKS

Serial No. Description BOQ Amount (BDT) Amount in Words

A Part -1: Construction Phase Works -

B Part-2: Maintenance Phase Works -

Total Bid Price -

Total Amount in Words:

(to be carried forward to Letter of Price Bid)

WP-01/ LOT No. DS-2 1 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL SUMMARY OF PART - 1: CONSTRUCTION PHASE WORKS

Bill No Description Amount (BDT) Amount in Words

Div 1 General & Site Facilities -

Div 2 Earthwork -

Div 3 Pavement Work -

Div 4 Foundation Work -

Div 5 Structures -

Div 6 Incidentals -

Div 7 Day works -

Sub-total of Bills (including Specified Provisional Sums) = (A) -

Specified Provisional Sums (Included in Total of Bills 1 to 7) = (B) Err:509 Taka Two hundred two crore forty four lac forty thousand only

Add: Physical Contingency (0.5%) on [(A) - (B)] = (C)

Total of Bills [(A) + (C)] = (D)

Notes on price adjustment: The amount for price adjustment shall be calculated according to Clause13.8 of Conditions of Contract which shall be added to / subtracted from the
total Contract amount/ Bills

Total Amount in Words: Taka:

(to be carried forward to Grand Summary)

WP-01/ LOT No. DS-2 2 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides

CONTRACT PACKAGE NO. DS-2


Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 2, Bill No - 2: Earthwork


Unit Rate (BDT)
Specification Pay Item
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words

Square
Div-2, Cl. 2.1 2/1/1 Clearing and Grubbing 734,400
Metre
Part. Spec. Div-2,
2/1A/1 Deduct Compensation for the cost of trees LS 1 Taka Sixty five lac only (6,500,000)
Cl 2.1
Roadway Excavation in Unsuitable Soil including
Cubic
Div-2, Cl. 2.2 2/2/1 stockpiling or disposal in a location agreed by 8,000
Metre
Engineer
Part. Spec. Div-2, Roadway Excavation in suitable Soil (cutting Cubic
2/2/2 2,987
Cl. 2.2 materials) Metre
Cubic
2/5/1 Excavation and Backfill for Structures 62,702
Metre
Div-2, Cl. 2.5
Cubic
2/5/3 Sand Backfill for Structures 3,631
Metre
Cubic
2/6/1(a) Embankment Fill from excavation on site. 2,987
Metre
Div-2, Cl. 2.6
Embankment Fill from Borrow pit in Contractor's Cubic
2/6/2 1,803,574
Arranged land Metre
Square
Div-2, Cl. 2.7 2/7/2 Preparation of Subgrade 450 mm Depth 646,964
Metre
Cubic
Div-2, Cl. 2.8 2/8/1 Improved Subgrade 177,092
Metre

WP-01/ LOT No. DS-2 3 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides

CONTRACT PACKAGE NO. DS-2


Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 2, Bill No - 2: Earthwork


Unit Rate (BDT)
Specification Pay Item
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words
Cubic
Div-2, Cl. 2.10 2/10/1 Construction of Soil Earthen Shoulders 61,880
Metre
2/13 Soft ground treatment
Provide dikes to cross-sectional area including Cubic
2/13/1 500
dewatering as instructed Metre
Removal and leveling of all dikes after Cubic
2/13/2 500
completion of embankment construction Metre
Supply and install 8-20m long PVD drains as Linear
2/13/3 18,000
detailed. Metre
Supply and lay geo-textile fabric in accordance Square
2/13/4 1,200
with drawings and specification. Metre
Part. Spec. Div-2,
Cl.2.13 Supply and install settlement Plates complete
2/13/7 Number 5
with rods at levels and locations as instructed.
Supply , install and monitoring displacement
2/13/9 Number 10
stakes at locations as instructed.
Secondary sub soil investigation(Borehole 10-
2/13/12 18m.depth including SPT, soil profile and Number 5
classification, natural moisture content…………..
Supply and laying drainage blanket materials in Cubic
2/13/13 3,120
accordance with the drawings and specification. Metre
Summary of Bill No - 2: Earthwork

WP-01/ LOT No. DS-2 4 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS
Err:509
Division 1, Bill No -1: General & Site Facilities
Unit Rate (BDT)
Specification Pay Item
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words

Kilometre-
1/1/1 a Protection of Traffic during Construction Phase 816
Part. Spec. Div-1, Month
Cl 1.1 Maintenance of existing Road during Construction Provisional
1/1/1 b Taka Seven Crore only 70,000,000
Phase Sum
1/2/1 Engineer's Office and other Facilities
Provide Engineer’s Permanent
1/2/1a Square Metre 300
Office Building

Provide Engineer’s Semi-permanent Residential


1/2/1b(i) Square Metre 350
Accommodation.
Provide Engineer’s Semi- Permanent
1/2/1c Square Metre 100
Field Laboratory Building
1/2/1d Provide Inspection Hut Number 1
Part. Spec. Div-1, 1/2/2 Maintenance and Service Buildings
Cl 1.2
1/2/2a Maintain and Service Engineer’s Permanent Office Month 60

Maintain and Service Engineer’s Semi-Permanent


1/2/2b Month 60
Field Office
Maintain and Service Engineer’s Semi-Permanent
1/2/2b(i) Month 60
Residential Accommodation
Maintain and Service Engineer’s Semi-Permanent
1/2/2c Month 48
Field Laboratory
1/2/2d Maintain and Service Inspection Hut Hut-Month 48

WP-01/ LOT No. DS-2 5 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS
Err:509
Division 1, Bill No -1: General & Site Facilities
Unit Rate (BDT)
Specification Pay Item
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words
1/2/3 Furnish and Equip
Furnish and Equip Engineer’s Permanent
1/2/3a Lump Sum 1
Office
Furnish and Equip Engineer’s Semi-permanent
1/2/3b(i) Lump Sum 1
Accommodation
Maintain Office Furniture , Equipment and
1/2/4
Supply of Office Consumables
Maintain Office Furniture , Equipment and Supply of
1/2/4a Office Consumables for Engineer’s Permanent Month 60
Part. Spec. Div-1, Office
Cl 1.2
Maintain Office Furniture and Equipment , Supply of
1/2/4b Office Consumables for Engineer’s Semi- Month 60
Permanent Field Office
Maintain Furniture , Equipment for Engineer’s
1/2/4b(i) Month 60
Semi-Permanent Accommodation.
Maintain Office Furniture , Equipment and Supply of
1/2/4c Office Consumables for Engineer’s Semi- Month 48
Permanent Field laboratory
1/2/5 Furnish and Equip Engineer's Laboratory Lump Sum 1

WP-01/ LOT No. DS-2 6 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS
Err:509
Division 1, Bill No -1: General & Site Facilities
Unit Rate (BDT)
Specification Pay Item
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words
1/2/6 Engineer's Communication
Part. Spec. Div-1, 1/2/6a Provide and Maintain Land Phones Month 48
Cl 1.2 1/2/6b Provide and Maintain Mobile Telephone s Month 60
1/2/6c Provide and Maintain Internet Service Month 60
Additional Special Test Provisional
Part. Spec. Div-1, Taka five lac only 500,000
1/3/1 Sum
Cl 1.3
( Mark up17% of item 1/3/1 ) Taka eighty five thousand only 85,000
1/4/1 Engineer's Transport
1/4/1a Provide 4WD Jeep Number 2
1/4/1b Provide 4WD Pickup with covered canopy Number 5
1/4/1c Provide Microbus Number 1
Part. Spec. Div-1, 1/4/1 d Provide Motorcycle Number 6
Cl 1.4
1/4/2 Operate and Maintain
1/4/2a Operate and Maintain 4WD Jeep Vehicle Month 120
Operate and Maintain 4WD Pickup with covered
1/4/2b Vehicle Month 252
canopy
1/4/2c Operate and Maintain Microbus Vehicle Month 48
1/4/2d Operate and Maintain Motorcycle Vehicle month 360
Relocation of Services, Social and Religious Provisional
1/5/1 Taka Seven crore fifteen lac only 71,500,000
Part. Spec. Div-1, structures etc. Sum
Cl 1.5 Taka One crore twenty one lac fifty
( Mark up17% of item 1/5/1 ) 12,155,000
five thousand only
Part. Spec. Div-1,
1/10/1 Environmental Management by Contractor Lump Sum 1
Cl 1.10
Summary of Bill No -1: General and Site Facilities

WP-01/ LOT No. DS-2 7 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS
Err:509
Division 3, Bill No- 3: Pavement Work

Specification ref. Pay Item Unit Rate (BDT)


Description Unit Quantity Amount (BDT)
no. No. In Figures In Words

Part. Spec. Div-3, Supplying, spreading & compacting Sub base Cubic
3/2/1a 148,796
Cl 3.2 materials. Metre

Part. Spec. Div-3, Cubic


3/3/1 Aggregate Base Type - I (WMM) 174,794
Cl 3.3 Metre
Cubic
Div-3, Cl. 3.3 3/3/2 Aggregate Base Type II 7,419
Metre
Square
Div-3, Cl. 3.6 3/6/1(a) Bituminous Prime Coat (Plant placed ) 614,672
Metre
Square
Div-3, Cl. 3.7 3/7/1(a) Bituminous Tack Coat (Plant work ) 601,438
Metre
Dense Bituminous Surfacing-Base Course Cubic
3/10/1a 66,440
Part. Spec. Div-3, (Polymer Modified Bitumen - PMB ) Metre
Cl 3.10 Dense Bituminous Surfacing - Wearing Course Cubic
3/10/2b 31,193
(Polymer Modified Bitumen - PMB ) Metre
Part. Spec. Div-3, Cubic
3/14/1(a) Concrete Class 15 3,735
Cl 3.14 Metre

Jointed Reinforced Concrete Slab- Concrete


Part. Spec. Div-3, Cubic
3/15/3 Class 40 with minimum flexural strength 4.5 Mpa 10,201
Cl 3.15 Metre
for Cement Concrete Pavement

Summary of Bill No - 3: Pavement work

WP-01/ LOT No. DS-2 8 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS
Err:509
Division 4, Bill No - 4: Foundation Work
Specification ref. Unit Rate (BDT)
Pay Item No. Description Unit Quantity Amount (BDT)
no. In Figures In Words

Linear
04/01/01(f) Bored cast in place piles (Dia 1200mm ) 35,312
Part. Spec. Div-4, Metre
Cl 4.1
04/01/04(a) High Yield Deformed Steel Reinforcing Bars Tonne 3,917

Load Test on cast in place bored piles


Part. Spec. Div-4, Static Load Test on Pilot Pile for two times of Service
Cl 4.4 04/04/01(d) Number 4
load
04/04a/01 High Strain Dynamic Test (HSDT) Number 69

Part. Spec. Div-4,


04/10/01 Lateral Load Test Number 4
Cl 4.10

Summary of Bill No - 4: Foundation work

WP-01/ LOT No. DS-2 9 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 5, Bill No - 5: Structures


Specification ref. Unit Rate (BDT)
Pay Item No. Description Unit Quantity Amount (BDT)
no. In Figures In Words
Culvert
Square
Div-5, Cl. 5.1 05/01/01 Single Layer Brick Flat Soling 7,019
Metre
Cubic
05/01/02a Concrete Class 15 as per Drawings 702
Part. Spec. Div-5, Metre
Cl 5.1 Concrete Class - 35 for the different component of Cubic
05/01/02b 8,641
culverts as per drawing Metre
Part. Spec. Div-5, High Yield Deformed Steel Reinforcing Bars (500
05/02/02(b) Tonne 1,221
Cl. 5.2 N/mm2)
Manufacture, supply and placing different sizes of CC
Part. Spec. Div-5, Square
05/14/01 blocks including Geotextile in locations as per drawing 13,335
Cl 5.14 Metre
and specification .

Bridge/Flyover/Rail Overpass
Square
Div-5, Cl. 5.1 05/01/01 Single Layer Brick Flat Soling 11,131
Metre
Cubic
05/01/02c Concrete Class 15 as per Drawings 1,113
Metre
Part. Spec. Div-5,
Cl 5.1 Concrete Class - 35 for the different component of
Cubic
05/01/02d bridges, flyover and pedestrian overpasses as per 53,199
Metre
drawing

WP-01/ LOT No. DS-2 10 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 5, Bill No - 5: Structures


Specification ref. Unit Rate (BDT)
Pay Item No. Description Unit Quantity Amount (BDT)
no. In Figures In Words
High Yield Deformed Steel Reinforcing Bars (420
05/02/02(a) Tonne 2,498
Part. Spec. Div-5, N/mm2)
Cl 5.2 High Yield Deformed Steel Reinforcing Bars (500
05/02/02(b) Tonne 5,957
N/mm2)
05/03/01 Prestressed Concrete Girders
Type -2, girder span greater than 25 m but not
05/03/01b Number 30
Part. Spec. Div-5, exceeding 27.50 m
Cl 5.3 Type -4, girder span greater than 30.50 m but not
05/03/01d Number 180
exceeding 33.50 m
Type -6, girder span greater than 37 m but not
05/03/01f Number 385
exceeding 40 m
Supply and erect including cutting, welding,
fabrication of M.S. railing ,fixing to position and all
Part. Spec. Div-5, Linear
05/07/07 types of materials,equipment,labour and others as 4,662
Cl 5.7 Metre
necessary and complete as per drawing and direction
of the Engineer.
Expansion Joint - Complete as detailed on the Linear
Div-5, Cl.5.8 5/8/1 1,260
drawings. Metre
05/09/02 Drainage Pipe
150 mm dia UPVC down pipe (wall thickness 4.5 mm)
05/09/02a Number 1,093
complete as per drawing.
Part. Spec. Div-5, 200 mm dia UPVC down pipe (wall thickness 4.5 mm) Linear
Cl 5.9 05/09/02b 1,283
complete as per drawing. Metre
05/09/03a Provide Weep holes in abutment and wing walls Number 1,144
Cubic
05/09/03b Filling granular materials behind abutments 3,374
Metre

WP-01/ LOT No. DS-2 11 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 5, Bill No - 5: Structures


Specification ref. Unit Rate (BDT)
Pay Item No. Description Unit Quantity Amount (BDT)
no. In Figures In Words

Part. Spec. Div-5, 05/11/01 Supply and Installation of Elastomeric bearings.


Cl 5.11 05/11/01(a) Elastomeric bearing, above 400 x400 mm size Number 1,178
Manufacture, supply and placing different sizes of CC
Part. Spec. Div-5, Square
05/14/01 blocks including Geotextile in locations as per drawing 20,916
Cl 5.14 Metre
and specification .
Foot Over Bridge
Cubic
05/01/02c Concrete Class 15 as per Drawings 6
Part. Spec. Div-5, Metre
Cl 5.1 Concrete Class - 35 for the different component of
Cubic
05/01/02d bridges, flyover and pedestrian overpasses as per 74
Metre
drawing
Part. Spec. Div-5, High Yield Deformed Steel Reinforcing Bars (500
05/02/02(b) Tonne 4
Cl 5.2 N/mm2)
Supplying, fabricating, assembling & erection of steel Square
05/07/08a 156
stair including Railing. Metre
Part. Spec. Div-5, Supplying, fabricating, assembling & erection of steel Square
05/07/08b 280
Cl 5.7 deck including Railing. Metre
Supplying, fabricating, assembling & erection of steel Square
05/07/08c 84
column including bracing. Metre

WP-01/ LOT No. DS-2 12 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 5, Bill No - 5: Structures


Specification ref. Unit Rate (BDT)
Pay Item No. Description Unit Quantity Amount (BDT)
no. In Figures In Words
Reinforced Earth Wall
Cubic
05/01/02c Concrete Class 15 as per Drawings 294
Metre
Part. Spec.
Div-5, Cl 5.1 Concrete Class - 35 for the different components of
Cubic
05/01/02d bridges, flyover and pedestrian overpasses as per 3,375
Metre
drawing
Part. Spec. High Yield Deformed Steel Reinforcing Bars (500
05/02/02(b) Tonne 397
Div-5, Cl 5.2 N/mm2)
Investigation, Design and Certification of Design of
05/13/01 Lump Sum 1
Reinforced Earth Wall approaches
Cubic
Part. Spec. Div-5, 05/13/02 Providing and laying Reinforced earth as per drawings 61,591
Metre
Cl. 5.13
Providing and laying Precast RCC Wall Panels
Square
05/13/03 including geotextiles, Rebars and all completed as per 10,395
Metre
drawing
Part. Spec. Div-5, Lighting and lightning protection in Bridges /Over
Prov. Sum Taka Six Crore only 60,000,000
Cl. 5.15 Passes / Fly Over / Foot Over Bridges/ Builtup Areas
05/15/01
Taka One crore two lac
( Mark up 17% of item 05/15/01 ) 10,200,000
only
An Overpass / Grade Separated Intersection at the
Part. Spec. Div-5,
05/16/01 Junction with Japanese Economic Zone access road Prov. Sum One Hundred Eighty Crore 1,800,000,000
Cl. 5.16
as per the instruction of the Engineer

Summary of Bill No - 5: Structures

WP-01/ LOT No. DS-2 13 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 6, Bill No - 6: Incidentals


Specification Pay Item Unit Rate (BDT)
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words
Reinforced Concrete Culvert Pipe - Class A
06/02/01
Part. Sp. Div-6, bedding (Concrete cradle)
Cl 6.2 Linear
06/02/01b Reinforced Concrete Culvert Pipes - 600 mm dia 510
Metre
Square
06/03/05l Single Layer Brick Flat Soling
Metre 20,940
Cubic
06/03/05m Concrete Class C-15 as per Drawing
Metre 1,050
Cubic
06/03/05n Concrete Class C-25
Metre 11,390
Part. Sp. Div-6, High Yield Deformed Steel Reinforcing Bars (500
06/03/05p Tonne 440
Cl 6.3 N/mm2 )
Interlocking batter channel in embankment slope
06/03/05f including inlet and outlet height (H) up to 3.00 m Number 280
complete as per drawing
Interlocking batter channel in embankment slope
06/03/05g including inlet and outlet height (H) exceeding 3.00 m Number 140
complete as per drawing
Precast Kerb as per drawing for median/ lane divider Linear
06/04/01a 94,107
as per direction of Engineer Metre
Part. Sp. Div-6,
Cl. 6.4 Precast Kerb as per drawing for Passenger shed Linear
06/04/01b 1,764
Island, Footpath etc. Metre
Square
Div-6, Cl. 6.5 06/05/01 Road Marking - Thermoplastic Material 13,886
Metre
06/05/03 Reflecting Road Studs Number 4,156
Square
Div-6, Cl. 6.7 06/07/02 Grass Turfing 459,000
Metre

WP-01/ LOT No. DS-2 14 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 6, Bill No - 6: Incidentals


Specification Pay Item Unit Rate (BDT)
Description Unit Quantity Amount (BDT)
ref. no. No. In Figures In Words
Guard rail - Double flex (W) Beam as per drawing Linear
06/08/01a 11,260
Part. Sp. Div-6, and direction of the Engineer Metre
Cl. 6.8 Guard rail - Single flex (W) Beam as per drawing and Linear
06/08/01b 32,706
direction of the Engineer Metre

Manufacturing & fixing passenger shed including


Part. Sp. Div-6,
06/08/03 foundation and complete all as per drawing and Number 6
Cl 6.8
specification. .

Div-6, Cl. 6.9 06/09/02 Concrete Post Number 244

06/10/03 Traffic Signs

06/10/03a Regulatory/Warning sign as per drawing Number 50


Part. Sp. Div-6,
Cl 6.10
06/10/03b Information sign as per drawing Number 20
Advance Direction Sign (mounted overhead) as per
06/10/03c Number 1
drawing
Cubic
Div-6, Cl. 6.11 06/11/01 Rumble strips (Bituminous Concrete Volume) 100
Metre
Part. Sp. Div-6, Supply and fixing of Rigid guide post completed as
06/15/01a Number 2,797
Cl 6.15 per drawing
Div-6, Cl. 6.16 06/16/01 Concrete Kilometre Posts Number 17

Part. Sp. Div-6, Providing and placing paving tiles as shown in the Square
06/18/01 11,880
Cl 6.18 drawing. Metre
Cubic
06/19/01a Concrete Class C-15 as per Drawing 680
Metre
Part. Sp. Div-6, Concrete Class C-25 New Jersey Barrier and other Cubic
Cl 6.19 06/19/01b 4,610
ancillary work Metre
High Yield Deformed Steel Reinforcing Bars (500
06/19/01c Tonne 50
N/mm2)
Summary of Bill No - 6: Incidentals

WP-01/ LOT No. DS-2 15 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 7, Bill No -7: Day works


Specification Pay Item Description Unit Unit Rate (BDT) Amount (BDT)
Quantity
ref. no. No. In Figures In Words
7.1 Labour
7.1a Ganger Hour 500
7.1b Mason Hour 900
7.1c Carpenter/ form work Hour 900
7.1d Other skilled labour Hour 900
7.1e Semi-skilled labour Hour 900
7.1f Unskilled labour Hour 900
7.1g Driver for Vehicle Hour 1,000
7.1h Operator for Heavy Equipment Hour 200
7.1i Operator for Medium Equipment Hour 200
7.1j Operator for Light Equipment Hour 300
7.1k Welder Hour 300
7.1l Electrician Hour 300
7.1m Painter Hour 100
7.2 Equipment
7.2a Self propelled pneumatic tyred roller 12 t. or above Hour 100
7.2b Self propelled smooth steel wheel roller 10 t Hour 100
7.2c Self propelled vibratory roller 6 t. Hour 100
7.2d Self propelled motor grader Ref. 140 cat Hour 100
7.2e Truck 10 t capacity 4 x 6 WD Hour 100

WP-01/ LOT No. DS-2 16 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 1: CONSTRUCTION PHASE WORKS

Division 7, Bill No -7: Day works


Specification Pay Item Description Unit Unit Rate (BDT) Amount (BDT)
Quantity
ref. no. No. In Figures In Words
7.2f Concrete mixer 1.7-2.8 m3 Hour 75
7.2g Stone crushing plant 60-80 t/hr. Hour 40
7.2h Asphalt plant 100 t/hr. Hour 40
7.2i Paver finisher, width 4 m Hour 40
7.2j Bitumen distributor 4000 litres Hour 40
7.2k Portable pumps 75 mm dia Hour 250
7.2l Portable pumps 100 mm dia Hour 250
7.2m Excavator/Backhoe (0.70 Cum) Hour 250
7.2n Welding Machine Hour 75
7.3 Materials
7.3a Cement Tonne 5
Cubic
7.3b Fine Aggregate 125
Metre
7.3c Reinforcement Tonne 2
Cubic
7.3d Crushed Stone 25 mm down graded. 100
Metre
Cubic
7.3e Crushed Stone 12 mm down graded. 100
Metre
7.3f Bitumen Tonne 5
7.3g 1st class Bricks No 10,000
Summary of Bill No - 7: Day works

WP-01/ LOT No. DS-2 17 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL SUMMARY OF PART - 2: MAINTENANCE PHASE WORKS

Bill No. Description BOQ Amount (BDT) Amount in Words

M/1 Routine Maintenance Works -

M/2 Provisional Sum for Emergency Maintenance Works 100,000,000 Taka ten crore only

M/3 Preventive Maintenance works -

Subtotal of Bills (including all Provisional Sums) = (A)

Specified Provisional Sum = (B) 100,000,000 Taka ten crore only

Add: Physical Contingency (0.5%) on [(A) - (B)] = (C)

Total of Bills [(A) + (C)] = (D)

Total Amount in Words: Taka:

(to be carried forward to Grand Summary)

WP-01/ LOT No. DS-2 18 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides
-
CONTRACT PACKAGE NO. DS-2
Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 2: MAINTENANCE PHASE WORKS

Bill No. M/1 - Routine Maintenance Works

Specification Estimated Unit Rate (BDT)


Length
ref. Pay Item No. Description Unit Month Quantity Amount (BDT)
(Km)
no. (Km-Month) In Figures In Words

Maintenance Routine maintenance


M/1/1 km-month 17 72 1,224
Spec. Cl. 5 Works

Summary of Bill No. M/1 Routine Maintenance Works

WP-01/ LOT No. DS-2 19 of 20


Improvement of the Dhaka (Katchpur) - Sylhet National Highway (N2) into a 4-Lane Highway with Service Lane on Both Sides

CONTRACT PACKAGE NO. DS-2


Road section from Sonpara Bus Stand (km 18+000) to Narsingdi BSCIC End (km 35+000)
BILL OF QUANTITIES PART - 2: MAINTENANCE PHASE WORKS

Bill No.M/3 Preventive Maintenance works


Unit Rate (BDT)
Specification Pay Item Estimated Amount
Description Unit
ref. no. No. Quantity In Figures In Words (BDT)

Div-3
Square
M/3/1 Bituminous Tack Coat 601,438
Metre

Dense Bituminous Surfacing - Wearing Cubic


M/3/2 31,193
Course (PMB) Metre
Div-6 Square
M/3/3 Road Marking - Thermoplastic Material 13,886
Metre
Remove Reflecting Road Studs from existing
M/3/4 road surface and reinstall on new road Nos 4,156
surface

Summary of Preventive Maintenance works M/3

WP-01/ LOT No. DS-2 20 of 20