Contract ID : 19IG0007
Contract Name : Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and
Landslide - Primary Roads - Tacloban - Baybay - South Rd - K0988+420-K0988+520, K0988+530-
Location of the Contract : K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
BID FORM
To:
BAC CHAIRMAN
DPWH - Leyte 5th District Engineering Office
Brgy. Hipusngo, Baybay City, Leyte
(a) We have examined and have no reservation on the Bidding Documents, including Addenda, for the Contract:
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary
Roads - Tacloban - Baybay - South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580,
K0994+680-K0994+780
(b) We offer to execute the Works for this Contract in accordance with the Bid and Bid Data Sheet, General and Special
Conditions of Contract accompanying this Bid;
The Total price of our Bid, excluding any discounts offeres in item (d) below is:
Thirty Million Eight Hundred Ninety Nine Thousand Eighty Eight Pesos & 70/100
(P 30,899,088.70 )
The discounts offered and the methodology for their apllication is: (___)
(c) Our Bid shall be valid for a period of 120days from the date fixed for the Bid submission deadline in accordance with the
Bidding Documents, and it shall remain binding upon us and may be accepted at any time before the expiration of that period;
(d) If our Bid accepted, we commit to obtain a Performance Security in the amount of (___) percent of the Contract Price for the
due perforamce of the Contract;
(e) Our firm, including any subcontractors or suppliers for any part of the Contract, have nationalities from the following eligible
countries;
(f) We are not participating, as Bidders, in more than one Bid in this Bidding process, other than alternative offers in accordance
with the Bidding Documents;
(g) Our firm, its affiliates or subsidiaries, including any subcontractors or suppliers for any part of the Contract, has not been
declared ineligible by the Funding Source;
(h) We understand that this Bid, together with your written acceptance therof included in your notification of award, shall
constitute of binding contract between us, until a formal Contract is prepared and executed; and
(i) We understand that you are not bound to accept the Lowest Evaluated Bid or any other Bid that you may receive.
Signed:
Duly authorized to sign the Bid for and on Behalf of : R. ALLOSA CONSTRUCTION & TRUCKING SERVICES
2. Part Description - Enter the "Part Description" corrresponding to the "Part No."
3. Total Amount - Enter the "Total Amount" in Pesos for all pages having the same "Part Description"
Proprietor/General Manager
(Position of the Bidder or Duly Authorized Bidder's Representative)
BILL OF QUANTITIES
Four Thousand One Hundred Thirty Eight Thousand Two Hundred Seventy Four
B.5 Project Billboard/Signboard each 2.00 Seven Pesos & 39/100 Pesos & 78/100
Two Hundred Eighty Nine Thousand Two Hundred Eighty Nine Thousand Four
B.7(2) Occupational Safety & Health Program l.s. 1.00 Four Hundred Fifty Six Pesos & 40/100 Hundred Fifty Six Pesos & 40/100
Five Hundred Forty Three Thousand Five Hundred Forty Three Thousand Three
Three Hundred Two Pesos & 12/100 Hundred Two Pesos & 12/100
B.8(2) Traffic Management l.s. 1.00
One Hundred Ninety Nine Thousand Five One Hundred Ninety Nine Thousand Five
B.9 Mobilization/Demobilization l.s. 1.00 Hundred Eighty Four Pesos & 00/100 Hundred Eighty Four Pesos & 00/100
Two Million One Hundred Eighty Two Two Million One Hundred Eighty Two
B.15(1) Detour/Access Road l.s. 1.00 Thousand One Hundred Sixty Nine Pesos Thousand One Hundred Sixty Nine Pesos &
& 55/100 55/100
and Centavos
100(1) ha. 0.42 Six Hundred Ninety Thousand Six Two Hundred Ninety Thousand Seventy Six
Clearing and Grubbing
Hundred Fifty Seven Pesos & 69/100 Pesos & 23/100
101(1) Removal of Structures and Obstruction l.s. 1.00 One Million Sixty Two Thousand Five One Million Sixty Two Thousand Five
Hundred Eleven Pesos & 88/100 Hundred Eleven Pesos & 88/100
104(1)a Embankment from Roadway Excavation, Common cu.m. 3,151.00 One Million Two Hundred Sixty Eight
Soil Four Hundred Two Pesos & 67/100 Thousand Eight Hundred Thirteen Pesos &
17/100
104(2)a Embankment from Borrow, Common Soil cu.m. 560.00 One Thousand Five Hundred Fifty One Eight Hundred Sixty Eight Thousand Seven
Pesos & 39/100 Hundred Seventy Eight Pesos & 40/100
and Centavos
CID No. 19IG0007 - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads -
Tacloban - Baybay - South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
BILL OF QUANTITIES
300(1) Gravel Surface Course cu.m. 126.00 Five Thousand Seven Hundred Sixty Six Seven Hundred Twenty Six Thousand Six
Pesos & 99/100 Hundred Forty Pesos & 74/100
and Centavos
CID No. 19IG0007 - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads -
Tacloban - Baybay - South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
Three Thousand Seven Hundred Eighty Three Million Fifty One Thousand Nine
506(1) Stone Masonry cu.m. 806.00 Six Pesos & 55/100 Hundred Fifty Nine Pesos & 30/100
507(1) Rubble Concrete cu.m. 1,024.00 Two Million Nine Hundred Sixty Seven
Two Thousand Eight Hundred Ninety
Thousand Five Hundred Seventy Two Pesos
Eight Pesos & 02/100
& 48/100
510(2) Concrete, Slope Protection cu.m 1,065.00 Four Million Eight Hundred Twenty Three
Four Thousand Five Hundred Twenty
Thousand Three Hundred Forty Two Pesos
Eight Pesos & 96/100
& 40/100
and Centavo
TOTAL AMOUNT (ALL PARTS) Php 30,899,088.70
(Carried to Summary)
(Pesos : Thirty Million Eight Hundred Ninety Nine Thousand Eighty Eight Pesos & 70/100
and Centavos
Proprietor/General Manager
(Position of the Bidder or Duly Authorized Bidder's Representative)
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A
T Marine Plywood, 4'x8'x1/2" 1.00 pc 645.00 645.00
E 4' x 8' Tarpaulin 32.00 sq.ft 44.00 1,408.00
R CWN Nails 0.50 kg 68.00 34.00
I Coco Lumber 42.00 bd. Ft. 14.00 588.00
A
L
S
E
Q
U
I
P Service/Stake Truck cap 6-8MT/195hp 1 4.00 782.00 3,128.00
M Misc. handtools 79.60
E
N
T
L
A Foreman 1 4.00 70.00 280.00
B Skilled Laborer 1 4.00 51.00 204.00
O Laborer 2 4.00 39.00 312.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A Safety Shoes 1,832.00 m-day 2.67 4,891.44
T Safety Helmet 1,832.00 m-day 0.24 439.68
E Safety Gloves 1,832.00 m-day 7.67 14,051.44
R
I
A
L
S
E
Q
U
I
P
M
E
N
T
L
A
B Part-time Safety Practitioner 1 1,832.00 74.38 136,255.00
O First Aider 1 1,832.00 54.38 99,615.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
E
Q
U
I
P Service/Stake Truck cap 6-8MT/195hp 1 384.00 782.00 300,288.00
M Misc. handtools 5,990.40
E
N
T
L
A
B
O Unskilled Laborer 4 384.00 39.00 59,904.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay
- South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A
T
E
R
I
A
L
S
E
Q
U
I
P Backhoe w/ Pavement Breaker (Cap. 0.80 cu.m.) 1 112.00 2,500.00 280,000.00
M Payloader (Cap. 1.5 cu.m.) 1 112.00 1,800.00 201,600.00
E Dump Truck (Cap. 10-11 cu.m.) 2 112.00 1,600.00 358,400.00
N Miscellaneous 1,596.00
T
L
A Foreman 1 112.00 72.50 8,120.00
B
O Unskilled Laborer 2 112.00 35.00 7,840.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay
- South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A
T
E
R
I
A
L
S
E
Q
U
I Payloader 1 55.00 1,300.00 71,500.00
P Bulldozer 1 55.00 1,200.00 66,000.00
M Dump Truck (Cap. 10-11 cu.m.) 1 55.00 1,600.00 88,000.00
E Miscellaneous 783.75
N
T
L
A Foreman 1 55.00 72.50 3,987.50
B
O Unskilled Laborer 2 55.00 35.00 3,850.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay
- South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
104(1)a Embankment from Roadway Excavation, Common Soil 3,151.00 cu.m. 402.67
M
A
T
E
R
I
A
L
S
E
Q Bulldozer 1 85.00 3,300.00 280,500.00
U Backhoe 1 85.00 2,500.00 212,500.00
I
P Vibratory Roller 1 85.00 1,495.00 127,075.00
M Motorized Road Grader 140Hp/G710A 1 85.00 2,170.00 184,450.00
E Water Truck (Cap. 1000 gal.) 1 85.00 2,420.00 205,700.00
N Miscellaneous 1,258.00
T
L
A Foreman 1 85.00 70.00 5,950.00
B Laborer 2 85.00 39.00 6,630.00
O
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay
- South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A
T Common borrow materials 700.00 cu.m. 600.00 420,000.00
E
R
I
A
L
S
E
Q
U Motorized Road Grader 140Hp/G710A 1 45.00 2,170.00 97,650.00
I Vibratory Roller 1 45.00 1,495.00 67,275.00
P Water Truck (Cap. 1000 gal.) 1 45.00 2,420.00 108,900.00
M Miscellaneous 669.75
E
N
T
L
A Foreman 1 47.00 72.50 3,407.50
B Laborer 2 47.00 35.00 3,290.00
O
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A
T Gravel surface course materials 144.90 cu.m. 1,200.00 173,880.00
E
I
A
L
S
E
Q
U Vibratory Roller 1.00 65.00 1,495.00 97,175.00
I Motorized Road Grader 140Hp/G710A 1.00 65.00 2,170.00 141,050.00
P Water Truck (Cap. 1000 gal.) 1.00 65.00 2,420.00 157,300.00
M
E
N
T Misc. handtools 169.00
L
A Foreman 1 65.00 72.50 4,712.50
B Skilled Laborer 1 65.00 47.50 3,087.50
O Laborer 4 65.00 35.00 9,100.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A Rubble Concrete 1,024.00 cu.m. 1,600.00 1,638,400.00
T
E
R
I
A
L
S
L
A Foreman 1 160.00 70.00 11,200.00
B Skilled Laborer 4 160.00 51.00 32,640.00
O Laborer 8 160.00 39.00 49,920.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A Steel Sheet Piles, Slope Protection 2,925.00 ln.m. 2,600.00 7,605,000.00
T materials
E
R
I
A
L
S
E
Q Crawler Crane 1.00 240.00 3,125.00 750,000.00
U Vibro Hammer 1.00 240.00 2,900.00 696,000.00
I Backhoe 1.00 240.00 2,500.00 600,000.00
P Low Bed Trailer with Tractor 1.00 240.00 1,400.00 336,000.00
M Misc. 17,808.00
E
N
T
L
A Foreman 1 240.00 70.00 16,800.00
B Skilled Laborer 4 240.00 51.00 48,960.00
O Laborer 12 240.00 39.00 112,320.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A
T Concrete, Slope Protection 1,065.00 cu.m 3,200.00 3,408,000.00
E materials
R
I
A
L
S
E
Q
U Concrete Mixer (1 bagger) 1.00 160.00 170.00 27,200.00
I Backhoe 1.00 160.00 2,500.00 400,000.00
P
M Misc. 5,248.00
E
N
T
L
A Foreman 1 160.00 70.00 11,200.00
B Skilled Laborer 2 160.00 51.00 16,320.00
O Laborer 4 160.00 39.00 24,960.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A Boulders 846.30 cu.m. 700.00 592,410.00
T Cement 5,239.00 bag 262.00 1,372,618.00
E Washed Sand 241.80 cu.m. 880.00 212,784.00
R
I PVC Weepholes 241.80 ln.m. 96.75 23,394.15
A Gravel Fill 16.12 cu.m. 972.00 15,668.64
L Filter cloth 241.80 l.m. 160.00 38,688.00
S Miscellaneous 12,332.00
E
Q
U
I
P Backhoe 1.00 61.00 2,500.00 152,500.00
M Concrete Mixer (1 bagger) 1.00 61.00 170.00 10,370.00
E
N Misc. handtools 2,952.40
T
L
A Foreman 1 61.00 70.00 4,270.00
B Skilled Laborer 2 61.00 51.00 6,222.00
O Laborer 8 61.00 39.00 19,032.00
R
__________________________
(Authorized Signature)
DETAILED COST ESTIMATES
19IG0007
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Tacloban - Baybay -
South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
M
A Detour/Access Road 1.00 l.s. 1,299,995.00 1,299,995.00
T
E
R
I
A
L
S
E
Q
U Crawler Crane 1.00 50.00 3,125.00 156,250.00
I Vibro Hammer 1.00 50.00 2,900.00 145,000.00
P Backhoe 1.00 50.00 2,500.00 125,000.00
M
E
N
T
L
A Foreman 1 91.00 72.50 6,597.50
B Skilled Laborer 2 91.00 51.00 9,282.00
O Laborer 6 91.00 35.00 19,110.00
R
__________________________
(Authorized Signature)
CID No. 19IG0007 - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads -
Tacloban - Baybay - South Rd - K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580, K0994+680-K0994+780
PARTICULAR % Wt. 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter
Proprietor/General Manager