DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : A.1.1 (8)
Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : Month
Output - As Submitted :1
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1- As Submitted


Labor
A.2
Sub- Total for A.2- As Evaluated
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted


Equipment
B.2
Sub- Total for B.2- As Evaluated
C.1 Total (A.1 + B.1) - As Submitted
C.2 Total (A.2 + B.2) - As Evaluated
D.1 Output - As Submitted
D.2 Output - As Evaluated
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Rental of Office / Storage House (Including light and water) mo 1.00 5,500.00 5,500.00
Sub- Total for F.1- As Submitted 5,500.00
Materials
F.2 a. Rental of Office / Storage House (Including light and water) mo 1.00 5,500.00 5,500.00
Sub- Total for F.2- As Evaluated 5,500.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,500.00
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 5,500.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 550.00
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 550.00
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 302.50
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 302.50
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 6,352.50
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 6,352.50

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 1

Page 1
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : A.1.4 (1)
Provision of Progress Photographs
Unit of Measurement : Each
Output - As Submitted : 240
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1- As Submitted


Labor
A.2
Sub- Total for A.2- As Evaluated
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted


Equipment
B.2
Sub- Total for B.2- As Evaluated
C.1 Total (A.1 + B.1) - As Submitted
C.2 Total (A.2 + B.2) - As Evaluated
D.1 Output - As Submitted
D.2 Output per - As Evaluated
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Photoprinting each 1.00 20.00 20.00
Sub- Total for F.1- As Submitted 20.00
Materials
F.2 a. Photoprinting each 1.00 20.00 20.00
Sub- Total for F.2- As Evaluated 20.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 20.00
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 20.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2 -
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 2.00
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 2.00
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1.10
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1.10
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 23.10
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 23.10

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 2

Page 2
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : B.5
Project Billboard / Signboard
Unit of Measurement : Each
Output - As Submitted : 2.00
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 8.00 101.43 811.44
b. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 1,718.96
Labor
a. Construction Foreman 1 8.00 101.43 811.44
A.2
b. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 1,718.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
a. Miscellaneous Handtools 1 8.00 86.50 692.04
Sub- Total for B.1- As Submitted 692.04
Equipment
B.2 a. Miscellaneous Handtools 1 8.00 86.50 692.04
Sub- Total for B.2- As Evaluated 692.04
C.1 Total (A.1 + B.1) - As Submitted 2,411.00
C.2 Total (A.2 + B.2) - As Evaluated 2,411.00
D.1 Output - As Submitted 2.00
D.2 Output per - As Evaluated 2.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,205.50
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,205.50
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Marine Plywood 1/4" x 4" x 8" pc 1.00 495.00 495.00
b. Tarpauline pc 1.00 900.00 900.00
F.1
c. 2" x 2" x 10' Coco Lumber bd.ft 3.00 38.00 114.00
d. 2" x 3" x 12' Coco Lumber bd.ft 2.00 38.00 76.00
e. 2" x 2" x 12' Coco Lumber bd.ft 3.00 38.00 114.00
f. Assorted CW Nails kg 0.25 65.00 16.25
Sub- Total for F.1- As Submitted 1,715.25
Materials
a. Marine Plywood 1/4" x 4" x 8" pc 1.00 495.00 495.00
b. Tarpauline pc 1.00 900.00 900.00
c. 2" x 2" x 10' Coco Lumber bd.ft 3.00 38.00 114.00
F.2
d. 2" x 3" x 12' Coco Lumber bd.ft 2.00 38.00 76.00
e. 2" x 2" x 12' Coco Lumber bd.ft 3.00 38.00 114.00
f. Assorted CW Nails kg 0.25 65.00 16.25
Sub- Total for F.2- As Evaluated 1,715.25
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 2,920.75
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 2,920.75
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 438.11
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 438.11
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 292.07
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 292.07
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 182.55
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 182.55
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 3,833.48
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 3,833.48

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 3

Page 3
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : B.7 (1)
Occupational Safety and Health Program
Unit of Measurement : Month
Output per Month - As Submitted : 1.00
Output per Month - As Evaluated :

Designation No. of Person/s Man-days Hourly Rate Amount (PhP)


A.1 Labor
a. Part Time Safety Officer 1 100.00 280.00 28,000.00
Sub- Total for A.1- As Submitted 28,000.00
Labor
A.2 a. Part Time Safety Officer 1 100.00 280.00 28,000.00
Sub- Total for A.2- As Evaluated 28,000.00
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted


Equipment
B.2
Sub- Total for B.2- As Evaluated
C.1 Total (A.1 + B.1) - As Submitted 28,000.00
C.2 Total (A.2 + B.2) - As Evaluated 28,000.00
D.1 Output per Month - As Submitted 1.00
D.2 Output per Month - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 28,000.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 28,000.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Safety Helmet man-days 1312.00 0.25 328.00
b. Safety Shoes man-days 1163.00 2.77 3,221.51
c. Safety Gloves man-days 1312.00 7.67 10,063.04
F.1 d. Vest man-days 1312.00 2.22 2,912.64
f. Dust Mask man-days 254.00 15.00 3,810.00
g. Eye Goggles man-days 178.00 2.82 501.96
h. Ear Muff man-days 76.00 0.83 63.08
i. Body Harness and Lanyard man-days 120.00 3.21 385.20
j. Rubber Boots man-days 335.00 1.39 465.65
Sub- Total for F.1- As Submitted 21,751.08
Materials
a. Safety Helmet man-days 1312 0.25 328.00
b. Safety Shoes man-days 1163 2.77 3,221.51
c. Safety Gloves man-days 1312 7.67 10,063.04
d. Vest man-days 1312 2.22 2,912.64
F.2 f. Dust Mask man-days 254 15 3,810.00
g. Eye Goggles man-days 178 2.82 501.96
h. Ear Muff man-days 76 0.83 63.08
i. Body Harness and Lanyard man-days 120 3.21 385.20
j. Rubber Boots man-days 335 1.39 465.65
Sub- Total for F.2- As Evaluated 21,751.08
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 49,751.08
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 49,751.08
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 4,975.11
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 4,975.11
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 2,736.31
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 2,736.31
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 57,462.50
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 57,462.50

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 4

Page 4
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : B.9
Mobilization / Demobilization
Unit of Measurement : Lump Sum
Output - As Submitted : 1.00
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1- As Submitted -


Labor
A.2
Sub- Total for A.2- As Evaluated
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. Self Loading Truck & Accessories 1 4.00 1,300.00 5,200.00
b. Miscellaneous Handtools 5,000.00
Sub- Total for B.1- As Submitted 10,200.00
Equipment
a. Self Loading Truck & Accessories 1 4.00 1,300.00 5,200.00
B.2
b. Miscellaneous Handtools 5,000.00
Sub- Total for B.2- As Evaluated 10,200.00
C.1 Total (A.1 + B.1) - As Submitted 10,200.00
C.2 Total (A.2 + B.2) - As Evaluated 10,200.00
D.1 Output - As Submitted 1.00
D.2 Output - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 10,200.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 10,200.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1- As Submitted -
Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 10,200.00
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 10,200.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2
I.1 Contractor's Profit (CP) - As Submitted 0% of G.1 -
I.2 Contractor's Profit (CP) - As Evaluated 0% of G.2
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 510.00
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 510.00
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,710.00
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,710.00

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 5
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 101 (1)
Removal of Structures and Obstruction
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 8.00 101.43 811.44
b. Skilled Labor 1 8.00 73.65 589.20
c. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,308.16
Labor
a. Construction Foreman 1 8.00 101.43 811.44
A.2 b. Skilled Labor 1 8.00 73.65 589.20
c. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,308.16
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Backhoe w/ Breaker (0.80 m3) 1 8.00 1,998.10 15,984.80
b. Dump Truck (12 yd3) 1 2.00 1,420.00 2,840.00
c. Cutting Outfit 1 5.00 45.45 227.25
Sub- Total for B.1- As Submitted 19,052.05
Equipment
a. Backhoe w/ Breaker (0.80 m3) 1 8.00 1,998.10 15,984.80
B.2 b. Dump Truck (12 yd3) 1 2.00 1,420.00 2,840.00
c. Cutting Outfit 1 5.00 45.45 227.25
Sub- Total for B.2- As Evaluated 19,052.05
C.1 Total (A.1 + B.1) - As Submitted 21,360.21
C.2 Total (A.2 + B.2) - As Evaluated 21,360.21
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 21,360.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21,360.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1- As Submitted -
Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 21,360.21
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 21,360.21
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 3,204.03
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 3,204.03
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 2,136.02
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 2,136.02
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,335.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,335.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 28,035.28
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 28,035.28

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 6
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 803 (1) a
Structure Excavation, Common Soil
Unit of Measurement : cu.m.
Output per hour - As Submitted : 20.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Backhoe (0.80 m3) 1 1.00 1,537.00 1,537.00
b. Dumptruck (12 yd3) 1 1.00 1,420.00 1,420.00
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 2,984.16
Equipment
a. Backhoe (0.80 m3) 1 1.00 1,537.00 1,537.00
B.2 b. Dumptruck (12 yd3) 1 1.00 1,420.00 1,420.00
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 2,984.16
C.1 Total (A.1 + B.1) - As Submitted 3,255.75
C.2 Total (A.2 + B.2) - As Evaluated 3,255.75
D.1 Output per hour - As Submitted 20.00
D.2 Output per hour - As Evaluated 20.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 162.79
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 162.79
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials

Sub- Total for F.1- As Submitted


Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 162.79
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 162.79
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 24.42
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 24.42
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 16.28
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 16.28
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 10.17
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 10.17
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 213.66
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 213.66

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 7
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 804 (1) a
Embankment, From roadway/structure excavation
Unit of Measurement : cu.m.
Output per hour - As Submitted : 9.84
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 1,272.16
Equipment
a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
B.2 b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 1,272.16
C.1 Total (A.1 + B.1) - As Submitted 1,543.75
C.2 Total (A.2 + B.2) - As Evaluated 1,543.75
D.1 Output per hour - As Submitted 9.84
D.2 Output per hour - As Evaluated 9.84
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 156.89
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 156.89
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1- As Submitted -
Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 156.89
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 156.89
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 23.53
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 23.53
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 15.69
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 15.69
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 9.81
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 9.81
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 205.91
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 205.91

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

#REF!

Page 8
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 804 (1) b
Embankment, From borrow
Unit of Measurement : cu.m.
Output per hour - As Submitted : 9.84
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 1,272.16
Equipment
a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
B.2 b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 1,272.16
C.1 Total (A.1 + B.1) - As Submitted 1,543.75
C.2 Total (A.2 + B.2) - As Evaluated 1,543.75
D.1 Output per hour - As Submitted 9.84
D.2 Output per hour - As Evaluated 9.84
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 156.89
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 156.89
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Embankment Materials (25% shringkage factor) cu.m. 1.25 323.00 403.75
Sub- Total for F.1- As Submitted 403.75
Materials
F.2 a. Embankment Materials (25% shringkage factor) cu.m. 1.25 323.00 403.75
Sub- Total for F.2- As Evaluated 403.75
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 560.64
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 560.64
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 84.10
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 84.10
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 56.06
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 56.06
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 35.04
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 35.04
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 735.83
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 735.83

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

#REF!

Page 9
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 804 (4)
Gravel fill
Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.20
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. Plate Compactor (5 hp) 1 0.50 123.00 61.50
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 88.66
Equipment
a. Plate Compactor (5 hp) 1 0.50 123.00 61.50
B.2
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 88.66
C.1 Total (A.1 + B.1) - As Submitted 360.25
C.2 Total (A.2 + B.2) - As Evaluated 360.25
D.1 Output per hour - As Submitted 1.20
D.2 Output per hour - As Evaluated 1.20
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 300.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 300.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Gravel Bedding (G1) cu.m. 1.05 917.50 963.38
(w/ 5% Shrinkage Factor) -
Sub- Total for F.1- As Submitted 963.38
Materials
a. Gravel Bedding (G1) cu.m. 1.05 917.50 963.38
F.2
(w/ 5% Shrinkage Factor) -
Sub- Total for F.2- As Evaluated 963.38
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 1,263.58
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 1,263.58
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 189.54
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 189.54
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 126.36
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 126.36
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 78.97
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 78.97
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,658.45
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,658.45

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 10
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c2
Structural Concrete (Footings and Slab on Fill), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.36
D.2 Output per hour - As Evaluated 0.36
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,650.16
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,650.16
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,533.31
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 5,533.31
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 830.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 830.00
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 553.33
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 553.33
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 345.83
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 345.83
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,262.47
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,262.47

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 11
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c3
Structural Concrete (Footing Tie Beams), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 12
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c4
Structural Concrete (Columns), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 13
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c5
Structural Concrete (Suspended Slab), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 14
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c6
Structural Concrete (Beams/Girders), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 15
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 902 (1) a
Reinforcing Steel (Deformed), Grade 40
Unit of Measurement : kg.
Output per hour - As Submitted : 129.09
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 3 1.00 73.65 220.95
b. Unskilled Labor 12 1.00 56.72 680.64
Sub- Total for A.1- As Submitted 1,003.02
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 3 1.00 73.65 220.95
b. Unskilled Labor 12 1.00 56.72 680.64
Sub- Total for A.2- As Evaluated 1,003.02
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Bar Cutter 1 0.50 219.75 109.88
b. Bar Bender 1 0.50 351.50 175.75
Minor Tools (10% of Labor Cost) 100.30
Sub- Total for B.1- As Submitted 385.93
Equipment
a. Bar Cutter 1 0.5 219.75 109.88
B.2 b. Bar Bender 1 0.5 351.50 34.03
Minor Tools (10% of Labor Cost) 100.30
Sub- Total for B.2- As Evaluated 244.21
C.1 Total (A.1 + B.1) - As Submitted 1,388.95
C.2 Total (A.2 + B.2) - As Evaluated 1,388.95
D.1 Output per hour - As Submitted 129.09
D.2 Output per hour - As Evaluated 129.09
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 10.76
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 10.76
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Deformed Reinforcing Steel kg 1.00 41.00 41.00
b. #16 Galvanized iron wire kg 0.02 87.00 1.31
c. Consumables (5% of Material Cost) 2.12
Sub- Total for F.1- As Submitted 44.42
Materials
a. Deformed Reinforcing Steel kg 1.00 41.00 41.00
F.2 b. #16 Galvanized iron wire kg 0.02 87.00 1.31
c. Consumables (5% of Material Cost) 2.12
Sub- Total for F.2- As Evaluated 44.42
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 55.18
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 55.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 8.28
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 8.28
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 5.52
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 5.52
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 3.45
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 3.45
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 72.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 72.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 16
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 903 (2)
Formworks and Falseworks
Unit of Measurement : sq.m.
Output per hour - As Submitted : 4.50
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
Installation
a. Construction foreman 1 1.00 101.43 101.43
A.1 b. Skilled Laborer 4 1.00 73.65 294.60
c. Unskilled Laborer 6 1.00 56.72 340.32
Stripping -
a. Construction foreman 1 0.56 101.43 56.80
b. Unskilled Laborer 6 0.56 56.72 190.58
Sub- Total for A.1- As Submitted 983.73
Labor
Installation
a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 4 1.00 73.65 294.60
A.2 c. Unskilled Laborer 6 1.00 56.72 340.32
Stripping
a. Construction foreman 1 0.56 101.43 56.80
b. Unskilled Laborer 6 0.56 56.72 190.58
Sub- Total for A.2- As Evaluated 983.73
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
Area = 4.5 sq.m.
a. H-Frame 1.7 m x 1.2m, set 0.878 14.00 6.08 74.74
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
B.1 b. Shoring Jack, 3.8 m full extension 1.361 14.00 4.50 85.74
c. Adjustable U-head Jack, 0.6m 1.756 14.00 0.85 20.90
d. Adjustable Base Jack, 0.6m 1.756 14.00 0.85 20.90
e. 1-1/2" GI Pipe x 6.0 m 1.361 14.00 2.50 47.63
f. 1-1/2" GI Pipe x 3.0 m 0.351 14.00 1.25 6.15
g. 1-1/2" GI Pipe x 4.0 m 0.702 14.00 1.75 17.21
h. 1-1/2" GI Pipe x 1.0 m 4.741 14.00 0.50 33.19
i. Tie Rod x 0.60m 6.102 14.00 1.00 85.43
j. Round Wing Nut 12.248 14.00 0.15 25.72
Sub- Total for B.1- As Submitted 417.59
Equipment
Area = 4.5 sq.m.
a. H-Frame 1.7 m x 1.2m, set 0.878 14.00 6.08 74.74
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 1.361 14.00 4.50 85.74
B.2 c. Adjustable U-head Jack, 0.6m 1.756 14.00 0.85 20.90
d. Adjustable Base Jack, 0.6m 1.756 14.00 0.85 20.90
e. 1-1/2" GI Pipe x 6.0 m 1.361 14.00 2.50 47.63
f. 1-1/2" GI Pipe x 3.0 m 0.351 14.00 1.25 6.15
g. 1-1/2" GI Pipe x 4.0 m 0.702 14.00 1.75 17.21
h. 1-1/2" GI Pipe x 1.0 m 4.741 14.00 0.50 33.19
i. Tie Rod x 0.60m 6.102 14.00 1.00 85.43
j. Round Wing Nut 12.248 14.00 0.15 25.72
Sub- Total for B.2- As Evaluated 417.59
C.1 Total (A.1 + B.1) - As Submitted 1,401.32
C.2 Total (A.2 + B.2) - As Evaluated 1,401.32
D.1 Output per hour - As Submitted 4.50
D.2 Output per hour - As Evaluated 4.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 311.41
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 311.41
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 0.35 1,336.00 92.72
b. Good Lumber bd.ft 4.73 55.00 86.66
c. Consumables (5% of Material Cost) 20.88
Sub- Total for F.1- As Submitted 200.26

Page 17
Materials
a. Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 0.35 1,336.00 92.72
F.2 b. Good Lumber bd.ft 4.73 55.00 86.66
c. Consumables (5% of Material Cost) 20.88
Sub- Total for F.2- As Evaluated 200.26
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 511.66
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 511.66
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 76.75
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 76.75
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 51.17
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 51.17
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 31.98
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 31.98
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 671.56
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 671.56
Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 18
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1000 (1)
Soil Poisoning
Unit of Measurement : Liter
Output per hour - As Submitted : 5.40
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 5.40
D.2 Output per hour - As Evaluated 5.40
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 58.77
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 58.77
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Soil Poisoning L 1.00 275.00 275.00
Sub- Total for F.1- As Submitted 275.00
Materials
F.2 a. Soil Poisoning L 1.00 275.00 275.00
Sub- Total for F.2- As Evaluated 275.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 333.77
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 333.77
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 50.07
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 50.07
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 33.38
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 33.38
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 20.86
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 20.86
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 438.08
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 438.08

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 19
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1001 (8)
Sewer Line Works
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 4.00 101.43 405.72
b. Skilled Laborer 1 4.00 73.65 294.60
c. Unskilled Laborer 2 4.00 56.72 453.76
Sub- Total for A.1- As Submitted 1,154.08
Labor
a. Construction foreman 1 4.00 101.43 405.72
A.2 b. Skilled Laborer 1 4.00 73.65 294.60
c. Unskilled Laborer 2 4.00 56.72 453.76
Sub- Total for A.2- As Evaluated 1,154.08
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 115.41
Sub- Total for B.1- As Submitted 115.41
Equipment
B.2 Minor Tools (10% of Labor Cost) 115.41
Sub- Total for B.2- As Evaluated 115.41
C.1 Total (A.1 + B.1) - As Submitted 1,269.49
C.2 Total (A.2 + B.2) - As Evaluated 1,269.49
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,269.49
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,269.49
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
100mm dia PVC pipe pcs 4.00 506.00 2,024.00
100mm x 50mm Tee pcs 4.00 140.00 560.00
100mm dia wye pcs 2.00 150.00 300.00
100mm x 50mm wye pcs 2.00 140.00 280.00
100mm elbow 45 deg pcs 2.00 90.00 180.00
F.1 100mm elbow 90 deg pcs 2.00 81.00 162.00
100mm dia cleanout pcs 2.00 36.00 72.00
50mm dia PVC pipe pcs 2.00 168.00 336.00
50mm dia p-trap pcs 1.00 98.00 98.00
50mm dia tee pcs 2.00 37.00 74.00
50mm dia PVC elbow 45 deg pcs 3.00 50.00 150.00
50mm dia elbow 90 deg pcs 3.00 26.00 78.00
Consumable (5%) 215.70
Sub- Total for F.1- As Submitted 4,529.70
Materials
100mm dia PVC pipe pcs 4.00 506.00 2,024.00
100mm x 50mm Tee pcs 4.00 140.00 560.00
100mm dia wye pcs 2.00 150.00 300.00
100mm x 50mm wye pcs 2.00 140.00 280.00
100mm elbow 45 deg pcs 2.00 90.00 180.00
100mm elbow 90 deg pcs 2.00 81.00 162.00
F.2 100mm dia cleanout pcs 2.00 36.00 72.00
50mm dia PVC pipe pcs 2.00 168.00 336.00
50mm dia p-trap pcs 1.00 98.00 98.00
50mm dia tee pcs 2.00 37.00 74.00
50mm dia PVC elbow 45 deg pcs 3.00 50.00 150.00
50mm dia elbow 90 deg pcs 3.00 26.00 78.00
Consumable (5%) 215.70
Sub- Total for F.2- As Evaluated 4,529.70
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,799.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 5,799.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 869.88
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 869.88
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 579.92
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 579.92
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 362.45
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 362.45
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,611.43
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,611.43

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II

Page 20
#REF! Construction Section

Page 21
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1001 (9)
Storm Drainage and Downspout
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 101.43 811.44
b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,308.16
Labor
a. Construction foreman 1 8.00 101.43 811.44
A.2 b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,308.16
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.1- As Submitted 230.82
Equipment
B.2 Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.2- As Evaluated 230.82
C.1 Total (A.1 + B.1) - As Submitted 2,538.98
C.2 Total (A.2 + B.2) - As Evaluated 2,538.98
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,538.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,538.98
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
4" dia PVC pipe pcs 5.00 506.00 2,530.00
F.1 4" dia elbow 90deg pcs 10.00 81.00 810.00
4" dia elbow 45deg pcs 10.00 90.00 900.00
coupling pcs 16.00 60.00 960.00
Consumable (5%) 260.00
Sub- Total for F.1- As Submitted 5,460.00
Materials
4" dia PVC pipe pcs 5.00 506.00 2,530.00
4" dia elbow 90deg pcs 10.00 81.00 810.00
F.2 4" dia elbow 45deg pcs 10.00 90.00 900.00
coupling pcs 16.00 60.00 960.00
Consumable (5%) 260.00
Sub- Total for F.2- As Evaluated 5,460.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 7,998.98
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 7,998.98
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,199.85
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,199.85
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 799.90
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 799.90
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 499.94
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 499.94
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,498.66
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,498.66

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 22
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1002 (4)
Plumbing Fixtures
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 317.37
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 317.37
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Water Closet including fittings and accessories (elongated) american std. or equivalent set/s 1.00 12,000.00 12,000.00
F.1
Lavatory including fittings and accessories american std. or equivalent set/s 1.00 4,700.00 4,700.00
Faucet pcs. 1.00 240.00 240.00
Floor Drains (stainless steel with waterless trap) pcs. 1.00 195.00 195.00
Sub- Total for F.1- As Submitted 17,135.00
Materials
Water Closet including fittings and accessories (elongated) american std. or equivalent set/s 1.00 12,000.00 12,000.00
Lavatory including fittings and accessories american std. or equivalent set/s 1.00 4,700.00 4,700.00
F.2
Faucet pcs. 1.00 240.00 240.00
Floor Drains (stainless steel with waterless trap) pcs. 1.00 195.00 195.00
Sub- Total for F.- As Evaluated 17,135.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 17,452.37
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 17,452.37
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 2,617.86
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 2,617.86
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 1,745.24
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 1,745.24
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,090.77
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,090.77
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 22,906.24
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 22,906.24

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 23
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1002 (24)
Cold Water Lines
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 101.43 811.44
b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,308.16
Labor
a. Construction foreman 1 8.00 101.43 811.44
A.2 b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,308.16
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.1- As Submitted 230.82
Equipment
B.2 Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.2- As Evaluated 230.82
C.1 Total (A.1 + B.1) - As Submitted 2,538.98
C.2 Total (A.2 + B.2) - As Evaluated 2,538.98
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,538.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,538.98
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
G.I Pipe 12.7mm pcs 3.00 336.00 1,008.00
G.I tee 12.70mm pcs 3.00 12.00 36.00
F.1 G.I elbow 12.70mm pcs 4.00 15.00 60.00
G.I end cap pcs 4.00 7.00 28.00
G.I union patente pcs 1.00 33.00 33.00
G.I gate valve pcs 1.00 379.00 379.00
Consumable (5%) 77.20
Sub- Total for F.1- As Submitted 1,621.20
Materials
G.I Pipe 12.7mm pcs 3.00 336.00 1,008.00
G.I tee 12.70mm pcs 3.00 12.00 36.00
G.I elbow 12.70mm pcs 4.00 15.00 60.00
F.2 G.I end cap pcs 4.00 7.00 28.00
G.I union patente pcs 1.00 33.00 33.00
G.I gate valve pcs 1.00 379.00 379.00
Consumable (5%) 77.20
Sub- Total for F.1- As Submitted 1,621.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 4,160.18
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 4,160.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 624.03
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 624.03
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 416.02
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 416.02
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 260.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 260.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 5,460.23
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 5,460.23

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 24
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1003 (1) a1
Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
Unit of Measurement : sq.m.
Output per hour - As Submitted : 1.49
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 1.49
D.2 Output per hour - As Evaluated 1.49
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 213.14
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 213.14
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 4.5mm Fiber Cement Board/ 4.5mm Marine Plywood/ 6mm Marine Plywood/ 6mm Ordin pc. 0.365 450.00 164.25
b. Metal Furring pc. 1.131 130.00 147.03
c. Carrying Channels pc. 0.357 150.00 53.55
F.1
d. Hanger Bars/Rod pc. 1.000 80.00 80.00
e. Channel Clip pc. 6.000 20.00 120.00
f. Wall Angle pc. 0.238 100.00 23.80
g. Rivets pc. 14.000 1.50 21.00
h. 1" Metal Screw pc. 4.000 3.00 12.00
Sub- Total for F.1- As Submitted 621.63
Materials
a. 4.5mm Fiber Cement Board/ 4.5mm Marine Plywood/ 6mm Marine Plywood/ 6mm Ordin pc. 0.365 450.00 164.25
b. Metal Furring pc. 1.131 130.00 147.03
c. Carrying Channels pc. 0.357 150.00 53.55
d. Hanger Bars/Rod pc. 1.000 80.00 80.00
F.2
e. Channel Clip pc. 6.000 20.00 120.00
f. Wall Angle pc. 0.238 100.00 23.80
g. Rivets pc. 14.000 1.50 21.00
h. 1" Metal Screw pc. 4.000 3.00 12.00
Sub- Total for F.1- As Submitted 33.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 834.77
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 834.77
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 125.22
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 125.22
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 83.48
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 83.48
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 52.17
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 52.17
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,095.64
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,095.64

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 25
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1004 (2)
Finishing Hardware
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 12.00 101.43 1,217.16
b. Skilled Laborer 1 12.00 73.65 883.80
c. Unskilled Laborer 2 12.00 56.72 1,361.28
Sub- Total for A.1- As Submitted 3,462.24
Labor
a. Construction foreman 1 12.00 101.43 1,217.16
A.2 b. Skilled Laborer 1 12.00 73.65 883.80
c. Unskilled Laborer 2 12.00 56.72 1,361.28
Sub- Total for A.2- As Evaluated 3,462.24
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 346.22
Sub- Total for B.1- As Submitted 346.22
Equipment
B.2 Minor Tools (10% of Labor Cost) 346.22
Sub- Total for B.2- As Evaluated 346.22
C.1 Total (A.1 + B.1) - As Submitted 3,808.46
C.2 Total (A.2 + B.2) - As Evaluated 3,808.46
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 3,808.46
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 3,808.46
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a.Finishing Hardware (Lockset/Latches, Bolts, set/s 4.00 922.00 3,688.00
Door Closer, Knobs/Handles/Hinges/ -
Ladder/Grab Bar) -
Sub- Total for F.1- As Submitted 3,688.00
Materials
a.Finishing Hardware (Lockset/Latches, Bolts, set/s 4.00 922.00 3,688.00
F.2 Door Closer, Knobs/Handles/Hinges/ -
Ladder/Grab Bar) -
Sub- Total for F.1- As Submitted 3,688.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 7,496.46
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 7,496.46
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,124.47
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,124.47
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 749.65
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 749.65
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 468.53
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 468.53
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 9,839.11
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 9,839.11

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 26
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1007 (1) a
Aluminum Framed Glass Door, Sliding Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.26
D.2 Output per hour - As Evaluated 0.26
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 980.69
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 980.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
Materials
a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
F.2 Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,504.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,504.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 525.63
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 525.63
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 350.42
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 350.42
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 219.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 219.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,599.25
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,599.25

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 27
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1007 (1) b
Aluminum Framed Glass Door, Swing Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.26
D.2 Output per hour - As Evaluated 0.26
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 980.69
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 980.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
Materials
a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
F.2 Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,504.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,504.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 525.63
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 525.63
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 350.42
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 350.42
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 219.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 219.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,599.25
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,599.25

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 28
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1008 (1) a
Aluminum Glass Windows, Sliding Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.26
D.2 Output per hour - As Evaluated 0.26
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 980.69
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 980.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Window (Sliding Type/ sq.m. 1.00 2,800.00 2,800.00
Swing Type) -
b. Consumables (3% of Materials Cost) 84.00
Sub- Total for F.1- As Submitted 2,884.00
Materials
a. Aluminum Glass Window (Sliding Type/ sq.m. 1.00 2,800.00 2,800.00
F.2 Swing Type) -
b. Consumables (3% of Materials Cost) 84.00
Sub- Total for F.1- As Submitted 2,884.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,864.69
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,864.69
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 579.70
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 579.70
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 386.47
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 386.47
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 241.54
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 241.54
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 5,072.41
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 5,072.41

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 29
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1008 (1) c
Aluminum Glass Windows, Awning Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.36
D.2 Output per hour - As Evaluated 0.36
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 708.28
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 708.28
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Window (Sliding Type/ Awning Type/ sq.m. 1.00 2,450.00 2,450.00
Casement Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
Materials
a. Aluminum Glass Window (Sliding Type/ Awning Type/ sq.m. 1.00 2,450.00 2,450.00
F.2 Casement Type) -
b. Consumables (3% of Materials Cost) - 73.50
Sub- Total for F.1- As Submitted 2,523.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,231.78
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,231.78
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 484.77
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 484.77
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 323.18
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 323.18
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 201.99
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 201.99
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,241.71
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,241.71

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 30
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1010 (1)
Frames, Jambs, Sills, Head, Transoms and Mullion
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 2.00 101.43 202.86
b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.1- As Submitted 463.60
Labor
a. Construction foreman 1 2.00 101.43 202.86
A.2 b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.2- As Evaluated 463.60
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.1- As Submitted 46.36
Equipment
B.2 Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.2- As Evaluated 46.36
C.1 Total (A.1 + B.1) - As Submitted 509.96
C.2 Total (A.2 + B.2) - As Evaluated 509.96
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 509.96
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 509.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Jambs, Sill, Head, Transoms and Mullion set 4.00 2,027.00 8,108.00
b. Consumables (5% of Materials Cost) 405.40
Sub- Total for F.1- As Submitted 8,513.40
Materials
a. Jambs, Sill, Head, Transoms and Mullion set 4.00 2,027.00 8,108.00
F.2
b. Consumables (5% of Materials Cost) 243.24
Sub- Total for F.1- As Submitted 8,351.24
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 9,023.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 9,023.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,353.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,353.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 902.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 902.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 563.96
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 563.96
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 11,843.16
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 11,843.16

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 31
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1010 (2) a
Doors, Flush
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 2.00 101.43 202.86
b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.1- As Submitted 463.60
Labor
a. Construction foreman 1 2.00 101.43 202.86
A.2 b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.2- As Evaluated 463.60
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.1- As Submitted 46.36
Equipment
B.2 Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.2- As Evaluated 46.36
C.1 Total (A.1 + B.1) - As Submitted 509.96
C.2 Total (A.2 + B.2) - As Evaluated 509.96
D.1 Output per hour - As Submitted 0.36
D.2 Output per hour - As Evaluated 0.36
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,416.56
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,416.56
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a.Wooden Flush Door sq.m. 1.00 1,800.00 1,800.00
Sub- Total for F.1- As Submitted 1,800.00
Materials
F.2 a.Wooden Flush Door sq.m. 1.00 1,800.00 1,800.00
Sub- Total for F.1- As Submitted 1,800.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,216.56
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,216.56
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 482.48
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 482.48
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 321.66
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 321.66
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 201.03
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 201.03
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,221.73
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,221.73

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 32
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1013 (2) b1
Fabricated Metal Roofing Accessory, gauge 24, Gutters
Unit of Measurement : l.m.
Output per hour - As Submitted : 11.80
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 11.80
D.2 Output per hour - As Evaluated 11.80
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 21.61
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Gutter (0.6 mm) m 1.00 168.00 168.00
F.1
b. 12" x 1" Plain GI Strap pc 3.00 40.00 120.00
c. Blind Rivets pc 16.00 1.50 24.00
c. Consumables (3% of Materials Cost) 9.36
Sub- Total for F.1- As Submitted 321.36
Materials
a. Gutter (0.6 mm) m 1.00 168.00 168.00
b. 12" x 1" Plain GI Strap pc 3.00 40.00 120.00
F.2
c. Blind Rivets pc 16.00 1.50 24.00
c. Consumables (3% of Materials Cost) 9.36
Sub- Total for F.1- As Submitted 321.36
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 342.97
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 342.97
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 51.45
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 51.45
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 34.30
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 34.30
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 21.44
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 21.44
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 450.15
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 450.15

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 33
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1014 (1) b2
Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span
Unit of Measurement : sq.m.
Output per hour - As Submitted : 2.08
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 2.08
D.2 Output per hour - As Evaluated 2.08
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 152.88
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 152.88
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Prepainted Metal Sheets (Corrugated, Short sq.m. 1.05 370.00 388.50
F.1 Span/ Long Span, below 0.427mm thk/ above -
0.427mm thk) -
b. Tek screw/J-bolt with washers pc 10.00 4.00 40.00
c. Consumables (3% of Materials Cost) 12.86
Sub- Total for F.1- As Submitted 441.36
Materials
a. Prepainted Metal Sheets (Corrugated, Short sq.m. 1.05 370.00 388.50
Span/ Long Span, below 0.427mm thk/ above -
F.2 0.427mm thk) -
b. Tek screw/J-bolt with washers pc 10.00 4.00 40.00
c. Consumables (3% of Materials Cost) 12.86
Sub- Total for F.1- As Submitted 441.36
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 594.23
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 594.23
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 89.13
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 89.13
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 59.42
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 59.42
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 37.14
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 37.14
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 779.93
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 779.93

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 34
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1016 (1) a
Waterproofing, Cement-base
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.88
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 1.88
D.2 Output per hour - As Evaluated 1.88
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 135.99
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 135.99
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Cement-based waterproofing sq.m. 1.05 45.00 47.25
Sub- Total for F.1- As Submitted 47.25
Materials
F.2 a. Cement-based waterproofing sq.m. 1.05 45.00 47.25
Sub- Total for F.1- As Submitted 141.75
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 183.24
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 183.24
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 27.49
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 27.49
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 18.32
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 18.32
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 11.45
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 11.45
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 240.50
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 240.50

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 35
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1018 (1)
Glazed Tiles and Trims
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.37
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.1- As Submitted 753.28
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.2- As Evaluated 753.28
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.1- As Submitted 75.33
Equipment
B.2 Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.2- As Evaluated 75.33
C.1 Total (A.1 + B.1) - As Submitted 828.61
C.2 Total (A.2 + B.2) - As Evaluated 828.61
D.1 Output per hour - As Submitted 1.37
D.2 Output per hour - As Evaluated 1.37
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 607.04
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 607.04
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Glazed Tiles sq.m. 1.05 740.00 777.00
b. Cement bags 0.325 254.00 82.55
F.1
c. Sand cu.m. 0.026 1,008.50 26.22
d. Tile Grout bags 0.125 116.00 14.50
e. Tile Adhesive bags 0.143 306.40 43.82
f. Consumables (3% of Materials Cost) 28.32
Sub- Total for F.1- As Submitted 972.41
Materials
a. Glazed Tiles sq.m. 1.05 740.00 777.00
b. Cement bags 0.325 254.00 82.55
c. Sand cu.m. 0.026 1,008.50 26.22
F.2
d. Tile Grout bags 0.125 116.00 14.50
e. Tile Adhesive bags 0.143 306.40 43.82
f. Consumables (3% of Materials Cost) 28.32
Sub- Total for F.1- As Submitted 972.41
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 1,579.45
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 1,579.45
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 236.92
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 236.92
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 157.94
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 157.94
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 98.72
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 98.72
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 2,073.02
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 2,073.02

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 36
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1018 (2)
Unglazed Tiles
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.95
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.1- As Submitted 753.28
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.2- As Evaluated 753.28
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.1- As Submitted 75.33
Equipment
B.2 Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.2- As Evaluated 75.33
C.1 Total (A.1 + B.1) - As Submitted 828.61
C.2 Total (A.2 + B.2) - As Evaluated 828.61
D.1 Output per hour - As Submitted 1.95
D.2 Output per hour - As Evaluated 1.95
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 424.93
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 424.93
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 1.05 350.00 367.50
F.1 Granite -
b. Cement bags 0.33 254.00 82.55
c. Sand cu.m. 0.03 1,008.50 26.22
d. Tile Grout bags 0.13 116.00 14.50
Sub- Total for F.1- As Submitted 490.77
Materials
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 1.05 350.00 367.50
Granite -
F.2 b. Cement bags 0.33 254.00 82.55
c. Sand cu.m. 0.03 1,008.50 26.22
d. Tile Grout bags 0.13 116.00 14.50
Sub- Total for F.1- As Submitted 490.77
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 915.70
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 915.70
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 137.35
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 137.35
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 91.57
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 91.57
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 57.23
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 57.23
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,201.85
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,201.85

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 37
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1027 (1)
Cement Plaster Finish
Unit of Measurement : sq.m
Output per hour - As Submitted : 7.13
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 475.61
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 475.61
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 47.56
Sub- Total for B.1- As Submitted 47.56
Equipment
B.2 Minor Tools (10% of Labor Cost) 47.56
Sub- Total for B.2- As Evaluated 47.56
C.1 Total (A.1 + B.1) - As Submitted 523.17
C.2 Total (A.2 + B.2) - As Evaluated 523.17
D.1 Output per hour - As Submitted 7.13
D.2 Output per hour - As Evaluated 7.13
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 73.43
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 73.43
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Cement bag 0.33 254.00 83.82
b. Sand cu.m. 0.03 1,008.50 27.23
Sub- Total for F.1- As Submitted 111.05
Materials
a. Cement bag 0.33 254.00 83.82
F.2
b. Sand cu.m. 0.027 1,008.50 27.23
Sub- Total for F.1- As Submitted 111.05
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 184.48
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 184.48
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 27.67
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 27.67
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 18.45
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 18.45
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 11.53
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 11.53
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 242.13
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 242.13

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 38
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1032 (1) a
Painting Works, Masonry/Concrete
Unit of Measurement : sq.m
Output per hour - As Submitted : 2.10
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 305.45
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 305.45
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 30.55
Sub- Total for B.1- As Submitted 30.55
Equipment
B.2 Minor Tools (10% of Labor Cost) 30.55
Sub- Total for B.2- As Evaluated 30.55
C.1 Total (A.1 + B.1) - As Submitted 336.00
C.2 Total (A.2 + B.2) - As Evaluated 336.00
D.1 Output per hour - As Submitted 2.10
D.2 Output per hour - As Evaluated 2.10
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 160.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 160.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Concrete Neutralizer gal 0.02 112.00 2.24
F.1 b. Concrete Sealer/Primer gal 0.04 190.00 7.60
c. Patching Compound gal 0.05 60.00 3.00
d. Semi Gloss Latex (two coat only) gal 0.08 595.00 47.60
e. Consumables (5% of Materials Cost) 3.02
Sub- Total for F.1- As Submitted 63.46
Materials
a. Concrete Neutralizer gal 0.02 112.00 2.24
b. Concrete Sealer/Primer gal 0.04 190.00 7.60
F.2 c. Patching Compound gal 0.05 60.00 3.00
d. Semi Gloss Latex (two coat only) gal 0.08 595.00 47.60
e. Consumables (5% of Materials Cost) 3.02
Sub- Total for F.1- As Submitted 63.46
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 223.46
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 223.46
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 33.52
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 33.52
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 22.35
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 22.35
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 13.97
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 13.97
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 293.29
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 293.29

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 39
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1046 (2) a1
CHB Non Load Bearing (including Reinforcing Steel), 100 mm
Unit of Measurement : sq.m
Output per hour - As Submitted : 3.83
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 418.89
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 418.89
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.1- As Submitted 41.89
Equipment
B.2 Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.2- As Evaluated 41.89
C.1 Total (A.1 + B.1) - As Submitted 460.78
C.2 Total (A.2 + B.2) - As Evaluated 460.78
D.1 Output per hour - As Submitted 3.83
D.2 Output per hour - As Evaluated 3.83
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 120.47
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 120.47
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 100 mm thk. CHB (Ordinary) pc 13.00 20.00 260.00
F.1 b. Cement bag 0.53 254.00 133.35
c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 570.88
Materials
a. 100 mm thk. CHB (Ordinary) pc 13.00 20.00 260.00
b. Cement bag 0.53 254.00 133.35
F.2 c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 570.88
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 691.35
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 691.35
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 103.70
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 103.70
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 69.13
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 69.13
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 43.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 43.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 907.39
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 907.39

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 40
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1046 (2) a2
CHB Non Load Bearing (including Reinforcing Steel), 150 mm
Unit of Measurement : sq.m
Output per hour - As Submitted : 3.18
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 418.89
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 418.89
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.1- As Submitted 41.89
Equipment
B.2 Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.2- As Evaluated 41.89
C.1 Total (A.1 + B.1) - As Submitted 460.78
C.2 Total (A.2 + B.2) - As Evaluated 460.78
D.1 Output per hour - As Submitted 3.18
D.2 Output per hour - As Evaluated 3.18
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 144.90
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 144.90
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 150 mm thk. CHB (Ordinary) pc 13.00 22.00 286.00
F.1 b. Cement bag 1.50 254.00 381.00
c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 844.53
Materials
a. 150 mm thk. CHB (Ordinary) pc 13.00 22.00 286.00
b. Cement bag 1.50 254.00 381.00
F.2 c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 844.53
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 989.43
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 989.43
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 148.41
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 148.41
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 98.94
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 98.94
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 61.84
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 61.84
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,298.63
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,298.63

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 41
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1047 (2) a
Structural Steel, Trusses
Unit of Measurement : kg
Output per hour - As Submitted : 85.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
Fabrication
a. Construction Foreman 1 1.00 101.43 101.43
A.1 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 2 1.00 56.72 113.44
Erection -
a. Skilled Laborer 3 0.49 73.65 108.27
b. Unskilled Laborer 3 0.49 56.72 83.38
Sub- Total for A.1- As Submitted 553.81
Labor
Fabrication
a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
A.2 c. Unskilled Laborer 2 1.00 56.72 113.44
Erection -
a. Skilled Laborer 3 0.49 73.65 108.27
b. Unskilled Laborer 3 0.49 56.72 83.38
Sub- Total for A.2- As Evaluated 553.81
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
a. Welding Machine 1 0.75 371.00 278.25
B.1
b .Cutting Outfit 1 0.25 45.45 11.36
c. Truck Mounted Crane (20-25 mt) 1 0.49 1,631.00 799.19
Minor Tools (10% of Labor Cost) 55.38
Sub- Total for B.1- As Submitted 1,144.18
Equipment
a. Welding Machine 1 0.75 371.00 278.25
b .Cutting Outfit 1 0.25 45.45 11.36
B.2
c. Truck Mounted Crane (20-25 mt) 1 0.49 1,631.00 799.19
Minor Tools (10% of Labor Cost) 55.38
Sub- Total for B.2- As Evaluated 1,144.18
C.1 Total (A.1 + B.1) - As Submitted 1,698.00
C.2 Total (A.2 + B.2) - As Evaluated 1,698.00
D.1 Output per hour - As Submitted 85.00
D.2 Output per hour - As Evaluated 85.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 19.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 19.98
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Structural Steel Framing including kg 1.00 50.00 50.00
cross bracing,truss,purlins) -
F.1
b. Acetylene kg 0.01 60.00 0.66
c. Oxygen kg 0.02 30.00 0.66
d. Welding Rod kg 0.02 110.00 2.20
e. Consumables (5% of Materials Cost) 2.68
Sub- Total for F.1- As Submitted 56.20
Materials
a. Structural Steel Framing including kg 1.00 50.00 50.00
cross bracing,truss,purlins) -
b. Acetylene kg 0.01 60.00 0.66
F.2
c. Oxygen kg 0.02 30.00 0.66
d. Welding Rod kg 0.02 110.00 2.20
e. Consumables (5% of Materials Cost) 2.68
Sub- Total for F.1- As Submitted 56.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 76.17
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 76.17
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 11.43
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 11.43
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 7.62
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 7.62
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 4.76
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 4.76
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 99.98
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 99.98

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II

Page 42
#REF! Construction Section
Err:509

Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1047 (6)
Metal Structure Accessories (Steel Plates)
Unit of Measurement : kgs.
Output per hour - As Submitted : 12.995
Output per hour - As Evaluated : .

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 13.00
D.2 Output per hour - As Evaluated 13.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 19.62
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 19.62
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Steel Plates kgs. 1.05 50.00 52.50
Consumables (3% of materials cost) 1.58
Sub- Total for F.1- As Submitted 54.08
Materials
a. Steel Plates kgs. 1.05 50.00 52.50
F.2
Consumables (3% of materials cost) 1.58
Sub- Total for F.1- As Submitted 54.08
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 73.70
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 73.70
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 11.05
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 11.05
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 7.37
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 7.37
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 4.61
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 4.61
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 96.73
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 96.73

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 43
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1051 (6)
Railing
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 101.43 811.44
b. Skilled Laborer 2 8.00 73.65 1,178.40
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,897.36
Labor
a. Construction foreman 1 8.00 101.43 811.44
A.2 b. Skilled Laborer 2 8.00 73.65 1,178.40
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,897.36
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Welding machine 1 8.00 371.00 2,968.00
b. Cutting outfit 1 6.00 45.45 272.70
Minor Tools (10% of Labor Cost) 289.74
Sub- Total for B.1- As Submitted 3,530.44
Equipment
a. Welding machine 1 8.00 371.00 2,968.00
B.2 b. Cutting outfit 1 6.00 45.45 272.70
Minor Tools (10% of Labor Cost) 289.74
Sub- Total for B.2- As Evaluated 3,530.44
C.1 Total (A.1 + B.1) - As Submitted 6,427.80
C.2 Total (A.2 + B.2) - As Evaluated 6,427.80
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 6,427.80
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 6,427.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 38mm dia. G.I. Pipe pc 20.00 1,074.00 21,480.00
F.1 b. Prefab L-type Grab Bar 38mm x 1m x 1m pc 4.00 4,500.00 18,000.00
c. Prefab Stainless Steel Grab bar 38mm x 800mm pc 4.00 1,000.00 4,000.00
d. Welding Rod kg 5.00 110.00 550.00
Cosumable (5%) 2,201.50
Sub- Total for F.1- As Submitted 46,231.50
Materials
a. 38mm dia. G.I. Pipe pc 20.00 1,074.00 21,480.00
b. Prefab L-type Grab Bar 38mm x 1m x 1m pc 4.00 4,500.00 18,000.00
F.2 c. Prefab Stainless Steel Grab bar 38mm x 800mm pc 4.00 1,000.00 4,000.00
d. Welding Rod kg 5.00 110.00 550.00
Cosumable (5%) 2,201.50
Sub- Total for F.1- As Submitted 46,231.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 52,659.30
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 52,659.30
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 7,898.89
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 7,898.89
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 5,265.93
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 5,265.93
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 3,291.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 3,291.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 69,115.33
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 69,115.33

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 44
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1100 (10)
Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in)
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.1- As Submitted 7,372.32
Labor
a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
A.2 b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.2- As Evaluated 7,372.32
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.1- As Submitted 737.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.2- As Evaluated 737.23
C.1 Total (A.1 + B.1) - As Submitted 8,109.55
C.2 Total (A.2 + B.2) - As Evaluated 8,109.55
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 8,109.55
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 8,109.55
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
20 mmΦ uPVC Pipe m 160.00 30.67 4,906.67
20 mmΦ uPVC Elbow pcs 30.00 20.00 600.00
20 mmΦ uPVC Adapter with locknut sets 20.00 14.00 280.00
40 mmΦ uPVC Pipe m 15.00 230.00 3,450.00
F.1 40 mmΦ uPVC Elbow pcs 5.00 64.00 320.00
40 mmΦ uPVC Adapter with locknut sets 2.00 40.00 80.00
Utility box, 2" X 4" PVC pcs 15.00 38.00 570.00
Octagonal Junction Box, 4" X 4" with cover uPVC sets 8.00 32.00 256.00
Square Box with cover, uPVC sets 8.00 43.00 344.00
G.I. Wire gauge 16 kgs 5.00 87.00 435.00
Consumables (3% of material cost) 337.25
Sub- Total for F.1- As Submitted 11,578.92
Materials
20 mmΦ uPVC Pipe m 160.00 30.67 4,906.67
20 mmΦ uPVC Elbow pcs 30.00 20.00 600.00
20 mmΦ uPVC Adapter with locknut sets 20.00 14.00 280.00
40 mmΦ uPVC Pipe m 15.00 230.00 3,450.00
40 mmΦ uPVC Elbow pcs 5.00 64.00 320.00
F.2 40 mmΦ uPVC Adapter with locknut sets 2.00 40.00 80.00
Utility box, 2" X 4" PVC pcs 15.00 38.00 570.00
Octagonal Junction Box, 4" X 4" with cover uPVC sets 8.00 32.00 256.00
Square Box with cover, uPVC sets 8.00 43.00 344.00
G.I. Wire gauge 16 kgs 5.00 87.00 435.00
Consumables (3% of material cost) 337.25
Sub- Total for F.1- As Submitted 11,578.92
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 19,688.47
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 19,688.47
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 2,953.27
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 2,953.27
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 1,968.85
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 1,968.85
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,230.53
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,230.53
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 25,841.12
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 25,841.12

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 45
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1101 (33)
Wires and Wiring Devices
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.1- As Submitted 7,372.32
Labor
a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
A.2 b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.2- As Evaluated 7,372.32
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.1- As Submitted 737.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.2- As Evaluated 737.23
C.1 Total (A.1 + B.1) - As Submitted 8,109.55
C.2 Total (A.2 + B.2) - As Evaluated 8,109.55
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 8,109.55
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 8,109.55
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
2.0 sq. mm. THHN m 150.00 20.00 3,000.00
3.5 sq. mm. THHN m 310.00 25.00 7,750.00
5.5 sq. mm. THHN m 12.00 36.00 432.00
14 sq. mm. THHN m 10.00 99.00 990.00
F.1 22 sq. mm. THHN m 20.00 143.00 2,860.00
PVC Electrical tape, big m 5.00 27.00 135.00
Single Pole Wall Switch on one switch plate sets 3.00 65.00 195.00
Duplex (2 Single Pole Wall Switches on one switch plate) sets 1.00 95.00 95.00
Single Convenience Outlet / Receptacle, Grounding Type (GT), 16A sets 2.00 90.00 180.00
Duplex Universal Convenience Outlets/Receptacles (GT), 16A sets 7.00 95.00 665.00
Consumables (3% of material cost) 489.06
Sub- Total for F.1- As Submitted 16,791.06
Materials
2.0 sq. mm. THHN m 150.00 20.00 3,000.00
3.5 sq. mm. THHN m 310.00 25.00 7,750.00
5.5 sq. mm. THHN m 12.00 36.00 432.00
14 sq. mm. THHN m 10.00 99.00 990.00
22 sq. mm. THHN m 20.00 143.00 2,860.00
F.2 PVC Electrical tape, big m 5.00 27.00 135.00
Single Pole Wall Switch on one switch plate sets 3.00 65.00 195.00
Duplex (2 Single Pole Wall Switches on one switch plate) sets 1.00 95.00 95.00
Single Convenience Outlet / Receptacle, Grounding Type (GT), 16A sets 2.00 90.00 180.00
Duplex Universal Convenience Outlets/Receptacles (GT), 16A sets 7.00 95.00 665.00
Consumables (3% of material cost) 489.06
Sub- Total for F.1- As Evaluated 16,791.06
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 24,900.61
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 24,900.61
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 3,735.09
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 3,735.09
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 2,490.06
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 2,490.06
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,556.29
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,556.29
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 32,682.05
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 32,682.05

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 46
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1102 (1)
Panelboard with Main & Branch Breakers
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.1- As Submitted 28,747.20
Labor
a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
A.2 b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.2- As Evaluated 28,747.20
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.1- As Submitted 2,874.72
Equipment
B.2 Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.2- As Evaluated 2,874.72
C.1 Total (A.1 + B.1) - As Submitted 31,621.92
C.2 Total (A.2 + B.2) - As Evaluated 31,621.92
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 31,621.92
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 31,621.92
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Main: 70AT/150AF, 2P, 4 Branches, Bolt-on type, NEMA 3R ENCLOSURE, 240VAC 40KA set 1.00 4,949.00 4,949.00
F.1
Branches: 20AT, 2P, BOLT-ON TYPE pc 3.00 532.00 1,596.00
30AT, 2P, BOLT-ON TYPE pc 2.00 532.00 1,064.00
Consumables (3% of material cost) 228.27
Sub- Total for F.1- As Submitted 7,837.27
Materials
Main: 70AT/150AF, 2P, 4 Branches, Bolt-on type, NEMA 3R ENCLOSURE, 240VAC 40KA set 1.00 4,949.00 4,949.00
Branches: 20AT, 2P, BOLT-ON TYPE pc 3.00 532.00 1,596.00
F.2
30AT, 2P, BOLT-ON TYPE pc 2.00 532.00 1,064.00
Consumables (3% of material cost) 228.27
Sub- Total for F.1- As Evaluated 7,837.27
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 39,459.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 39,459.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 5,918.88
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 5,918.88
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 3,945.92
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 3,945.92
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 2,466.20
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 2,466.20
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 51,790.19
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 51,790.19

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 47
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1103 (1)
Lighting Fixtures and Lamps
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.1- As Submitted 7,372.32
Labor
a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
A.2 b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.2- As Evaluated 7,372.32
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.1- As Submitted 737.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.2- As Evaluated 737.23
C.1 Total (A.1 + B.1) - As Submitted 8,109.55
C.2 Total (A.2 + B.2) - As Evaluated 8,109.55
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 8,109.55
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 8,109.55
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Twinhead Emergency Lamp 2x6Watts Bulb 6V 10Ah pcs 2.00 2,199.00 4,398.00
Louver - Surface Type w/ Aluminum Reflector - Fixture Only - 2X20W pcs 6.00 1,200.00 7,200.00
F.1 Led Fluorescent Tube 18W pcs 12.00 700.00 8,400.00
Led Bulb 14W pcs 6.00 300.00 1,800.00
Ceiling Receptacle 3½” set 3.00 25.00 75.00
Wall Lamp Fixture pcs 6.00 929.00 5,574.00
Consumables (3% of material coConsumab Consumables (3% of material cost) 823.41
Sub- Total for F.1- As Submitted 28,270.41
Materials
Twinhead Emergency Lamp 2x6Watts Bulb 6V 10Ah pcs 2.00 2,199.00 4,398.00
Louver - Surface Type w/ Aluminum Reflector - Fixture Only - 2X20W pcs 6.00 1,200.00 7,200.00
Led Fluorescent Tube 18W pcs 12.00 700.00 8,400.00
F.2 Led Bulb 14W pcs 6.00 300.00 1,800.00
Ceiling Receptacle 3½” set 3.00 25.00 75.00
Wall Lamp Fixture pcs 6.00 929.00 5,574.00
Consumables (3% of material cost) 823.41
Sub- Total for F.1- As Evaluated 28,270.41
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 36,379.96
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 36,379.96
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 5,456.99
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 5,456.99
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 3,638.00
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 3,638.00
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 2,273.75
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 2,273.75
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 47,748.70
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 47,748.70

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 48
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1105 (20)
Network Cabling
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 16.00 101.43 1,622.88
b. Reg. Master Electrician / NCII Electrician 1 16.00 92.31 1,476.96
c. Helper 2 16.00 56.72 1,815.04
Sub- Total for A.1- As Submitted 4,914.88
Labor
a. Reg. Electrical Engr. 1 16.00 101.43 1,622.88
A.2 b. Reg. Master Electrician / NCII Electrician 1 16.00 92.31 1,476.96
c. Helper 2 16.00 56.72 1,815.04
Sub- Total for A.2- As Evaluated 4,914.88
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 491.49
Sub- Total for B.1- As Submitted 491.49
Equipment
B.2 Minor Tools (10% of Labor Cost) 491.49
Sub- Total for B.2- As Evaluated 491.49
C.1 Total (A.1 + B.1) - As Submitted 5,406.37
C.2 Total (A.2 + B.2) - As Evaluated 5,406.37
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 5,406.37
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 5,406.37
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Telephone / Data Cabinet (304mm X 457mm X 127mm) GUAGE # 16, NEMA3R set 1.00 1,950.00 1,950.00
F.1
UTP CAT5 Cable (Telephone Jacketed Wire CAT 5E) m 15.00 15.00 225.00
Wall Plate Single (Teephone outlet, RJ 45) sets 1.00 200.00 200.00
Consumables (3% of material cost) 71.25
Sub- Total for F.1- As Submitted 2,446.25
Materials
Telephone / Data Cabinet (304mm X 457mm X 127mm) GUAGE # 16, NEMA3R set 1.00 1,950.00 1,950.00
UTP CAT5 Cable (Telephone Jacketed Wire CAT 5E) m 15.00 15.00 225.00
F.2
Wall Plate Single (Teephone outlet, RJ 45) sets 1.00 200.00 200.00
Consumables (3% of material cost) 71.25
Sub- Total for F.1- As Evaluated 2,446.25
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 7,852.62
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 7,852.62
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,177.89
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,177.89
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 785.26
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 785.26
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 490.79
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 490.79
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,306.56
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,306.56

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 49
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1109 (1)
Grounding System
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
b. Reg. Master Electrician / NCII Electrician 2 40.00 92.31 7,384.80
c. Helper 4 40.00 56.72 9,075.20
Sub- Total for A.1- As Submitted 20,517.20
Labor
a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
A.2 b. Reg. Master Electrician / NCII Electrician 2 40.00 92.31 7,384.80
c. Helper 4 40.00 56.72 9,075.20
Sub- Total for A.2- As Evaluated 20,517.20
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted -


Equipment
B.2
Sub- Total for B.2- As Evaluated -
C.1 Total (A.1 + B.1) - As Submitted 20,517.20
C.2 Total (A.2 + B.2) - As Evaluated 20,517.20
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 20,517.20
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 20,517.20
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 Exothermic Weld Connector pcs 13.00 250.00 3,250.00
Bare Copper Wire, 50mm2 m 65.00 375.00 24,375.00
Grounding Rod Copper Clad 3m X 16mm dia. pcs 6.00 350.00 2,100.00
Sub- Total for F.1- As Submitted 29,725.00
Materials
Exothermic Weld Connector pcs 13.00 250.00 3,250.00
F.2 Bare Copper Wire, 50mm2 m 65.00 375.00 24,375.00
Grounding Rod Copper Clad 3m X 16mm dia. pcs 6.00 350.00 2,100.00
Sub- Total for F.1- As Evaluated 29,725.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 50,242.20
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 50,242.20
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 7,536.33
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 7,536.33
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 5,024.22
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 5,024.22
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 3,140.14
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 3,140.14
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 65,942.89
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 65,942.89

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 50
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1111 (8)
2 Spool Insulator Wire Rack
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 4.00 101.43 405.72
b. Reg. Master Electrician / NCII Electrician 1 4.00 92.31 369.24
c. Helper 2 4.00 56.72 453.76
Sub- Total for A.1- As Submitted 1,228.72
Labor
a. Reg. Electrical Engr. 1 4.00 101.43 405.72
A.2 b. Reg. Master Electrician / NCII Electrician 1 4.00 92.31 369.24
c. Helper 2 4.00 56.72 453.76
Sub- Total for A.2- As Evaluated 1,228.72
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 122.87
Sub- Total for B.1- As Submitted 122.87
Equipment
B.2 Minor Tools (10% of Labor Cost) 122.87
Sub- Total for B.2- As Evaluated 122.87
C.1 Total (A.1 + B.1) - As Submitted 1,351.59
C.2 Total (A.2 + B.2) - As Evaluated 1,351.59
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,351.59
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,351.59
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
2 Spool Insulator Wire Rack set 2.00 420.00 840.00
Consumables (3% of material cost) 25.20
Sub- Total for F.1- As Submitted 865.20
Materials
2 Spool Insulator Wire Rack set 2.00 420.00 840.00
F.2
Consumables (3% of material cost) 25.20
Sub- Total for F.1- As Evaluated 865.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 2,216.79
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 2,216.79
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 332.52
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 332.52
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 221.68
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 221.68
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 138.55
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 138.55
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 2,909.54
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 2,909.54

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 51
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1202 (6) a1
Fire Extinguisher, 10 lbs, ABC with bracket
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor
Reg. Master Electrician / NCII Electrician 1 1.00 92.31 92.31
Sub- Total for A.1- As Submitted 92.31
Labor
A.2 Reg. Master Electrician / NCII Electrician 1 1.00 92.31 92.31
Sub- Total for A.2- As Evaluated 92.31
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 9.23
Sub- Total for B.1- As Submitted 9.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 9.23
Sub- Total for B.2- As Evaluated 9.23
C.1 Total (A.1 + B.1) - As Submitted 101.54
C.2 Total (A.2 + B.2) - As Evaluated 101.54
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 101.54
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 101.54
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
Fire Extuinguisher, 10 Lbs, ABC, with bracket set 2.00 4,100.00 8,200.00
Sub- Total for F.1- As Submitted 8,200.00
Materials
F.2 Fire Extuinguisher, 10 Lbs, ABC, with bracket set 2.00 4,100.00 8,200.00
Sub- Total for F.1- As Evaluated 8,200.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 8,301.54
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 8,301.54
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,245.23
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,245.23
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 830.15
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 830.15
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 518.85
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 518.85
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,895.77
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,895.77

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 52
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1208(1)
Fire Alarm System
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.1- As Submitted 28,747.20
Labor
a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
A.2 b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.2- As Evaluated 28,747.20
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.1- As Submitted 2,874.72
Equipment
B.2 Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.2- As Evaluated 2,874.72
C.1 Total (A.1 + B.1) - As Submitted 31,621.92
C.2 Total (A.2 + B.2) - As Evaluated 31,621.92
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 31,621.92
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 31,621.92
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Smoke Detector with base set 7.00 1,950.00 13,650.00
Heat Detector with base set 2.00 1,950.00 3,900.00
F.1 Fire Alarm Bell, Vibrating type, 6" set 2.00 1,400.00 2,800.00
Fire Alarm Control Panel set 1.00 13,890.00 13,890.00
Manual Pull Station Switch Single action pc 2.00 1,500.00 3,000.00
Back-up Battery Pack, 12V DC set 1.00 1,200.00 1,200.00
Consumables (3% of material cost) 1,153.20
Sub- Total for F.1- As Submitted 39,593.20
Materials
Smoke Detector with base set 7.00 1,950.00 13,650.00
Heat Detector with base set 2.00 1,950.00 3,900.00
Fire Alarm Bell, Vibrating type, 6" set 2.00 1,400.00 2,800.00
F.2 Fire Alarm Control Panel set 1.00 13,890.00 13,890.00
Manual Pull Station Switch Single action set 2.00 1,400.00 2,800.00
Back-up Battery Pack, 12V DC set 1.00 13,890.00 13,890.00
Consumables (3% of material cost) 1,527.90
Sub- Total for F.1- As Evaluated 52,457.90
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 71,215.12
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 71,215.12
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 10,682.27
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 10,682.27
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 7,121.51
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 7,121.51
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 4,450.95
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 4,450.95
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 93,469.85
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 93,469.85

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 53
BACK-UP COMPUTATION

Mobilization / Demobilization 1.00 Lump Sum


Structure Excavation 952.35 cu.m.
Length Width Height Quantity
F1 2.90 x 2.90 x 2.20 x 49 = 906.598
Septic Tank 7.60 x 2.8 x 2.15 x 1 = 45.75

Embankment, From Roadway/Structure Excavation 714.71 cu.m.


Excavated Vol. Concrete Vol.
F1 952.35 - 237.64 x 1.00 x 1 = 714.714

Gravel Fill 45.47 cu.m.

Gravel bed Length Width Height Quantity


F1 2.90 x 2.90 x 0.10 x 49 = 41.209
Septic Tank 7.60 x 2.8 x 0.10 x 2 = 4.26

Structural Concrete, Class A 1153.49 cu.m.

Length Width Height Quantity


F1 2.90 x 2.90 x 0.40 x 49 = 164.836
SLAB ON GRADE 520 x 0.10 x 1 = 52
ramp 16.75 x 0.10 x 2 = 3.35
ramp 51.12 x 0.10 x 2 = 10.224
Septic Tank Concrete
length x thickness x width = volume
base 7.6 0.2 2.80 4.256
east side 2.8 0.15 2.15 0.903
west side 2.8 0.15 2.15 0.903
north side 7.6 0.15 2.15 2.451
south side 7.6 0.15 2.15 2.451
partition 1 2.5 0.15 2.15 0.80625
partition 2 2.5 0.15 2.15 0.80625
2 set
25.153 cu.m.

Length Width Height Quantity


GB 1 4.50 x 0.30 x 0.40 x 28 = 50.4
GB 2 4.00 x 0.30 x 0.40 x 14 = 22.4
RB2 4.00 x 0.30 x 0.40 x 7 = 11.2
Rb3 3.50 x 0.30 x 0.40 x 14 = 19.6
Rb4 3.00 x 0.30 x 0.40 x 21 = 25.2

2nd flr & 3rd flr Length Width Height Quantity


B1 4.50 x 0.30 x 0.40 x 56 = 100.8
B2 4.00 x 0.30 x 0.40 x 42 = 67.2
B3 3.50 x 0.30 x 0.40 x 28 = 39.2
B4 3.00 x 0.30 x 0.40 x 44 = 52.8

4th flr Length Width Height Quantity


B1 4.50 x 0.30 x 0.40 x 28 = 50.4
B2 4.00 x 0.30 x 0.40 x 21 = 33.6
B3 3.50 x 0.30 x 0.40 x 14 = 19.6
B4 3.00 x 0.30 x 0.40 x 22 = 26.4

Length Width Height Quantity


RB1 4.50 x 0.30 x 0.40 x 28 = 50.4
RB2 4.00 x 0.30 x 0.40 x 21 = 33.6
Rb3 3.50 x 0.30 x 0.40 x 14 = 19.6
Rb4 3.00 x 0.30 x 0.40 x 21 = 25.2

Length Width Height Quantity


C1 0.4 x 0.40 x 14.20 x 49 = 111.328

Area Thickness Qty


SS 520 x 0.125 x 3.000 = 195.00 cu.m.
Reinforcing Steel 91119.02 kgs.

MAIN REBAR Height No. of Bars Quantity


c1 14.20 x 6 x 49 = 4174.80 l.m. 20mmØ

LATERAL TIES No. of col No. of ties Length of ties(2x(A+B)+20D)


c1 49 x 74 x 2.10 = 7614.60 l.m. 12mmØ

MAIN REBAR Length No. of Pieces Quantity


F1 2.90 x 15 x 49 = 2131.5 l.m. 20.mmØ
2.90 x 15 x 49 = 2131.5 l.m. 20.mmØ

Length No. of Bars Quantity


GB 1 4.50 x 4 x 28 = 504.00 l.m. 16mmØ
GB 2 4.00 x 4 x 14 = 224.00 l.m. 16mmØ
RB2 4.00 x 4 x 7 = 112.00 l.m. 16mmØ
Rb3 3.50 x 4 x 14 = 196.00 l.m. 16mmØ
Rb4 3.00 x 4 x 21 = 252.00 l.m. 16mmØ

2nd flr & 3rd flr


B1 4.50 x 6 x 56 = 1512.00 l.m. 16mmØ
B2 4.00 x 6 x 42 = 1008.00 l.m. 16mmØ
B3 3.50 x 6 x 28 = 588.00 l.m. 16mmØ
B4 3.00 x 6 x 44 = 792.00 l.m. 16mmØ

4th flr
B1 4.50 x 6 x 28 = 756.00 l.m. 16mmØ
B2 4.00 x 6 x 21 = 504.00 l.m. 16mmØ
B3 3.50 x 6 x 14 = 294.00 l.m. 16mmØ
B4 3.00 x 6 x 22 = 396.00 l.m. 16mmØ

RB1 4.50 x 4 x 28 = 504.00 l.m. 16mmØ


RB2 4.00 x 4 x 21 = 336.00 l.m. 16mmØ
Rb3 3.50 x 4 x 14 = 196.00 l.m. 16mmØ
Rb4 3.00 x 4 x 21 = 252.00 l.m. 16mmØ

No. of beam No. of ties Length of ties(2x(A+B)+20D)


GB 1 28 x 24 x 1.72 = 1155.84 l.m. 12mmØ
GB 2 14 x 23 x 1.72 = 553.84 l.m. 12mmØ
RB2 7 x 23 x 1.72 = 276.92 l.m. 12mmØ
Rb3 14 x 22 x 1.72 = 529.76 l.m. 12mmØ
Rb4 21 x 21 x 1.72 = 758.52 l.m. 12mmØ

2nd flr & 3rd flr


B1 56 x 27 x 1.72 = 2600.64 l.m. 12mmØ
B2 42 x 25 x 1.72 = 1806.00 l.m. 12mmØ
B3 28 x 24 x 1.72 = 1155.84 l.m. 12mmØ
B4 44 x 22 x 1.72 = 1664.96 l.m. 12mmØ

4th flr
B1 28 x 27 x 1.72 = 1300.32 l.m. 12mmØ
B2 21 x 25 x 1.72 = 903.00 l.m. 12mmØ
B3 14 x 24 x 1.72 = 577.92 l.m. 12mmØ
B4 22 x 22 x 1.72 = 832.48 l.m. 12mmØ

RB1 28 x 24 x 1.72 = 1155.84 l.m. 12mmØ


RB2 21 x 23 x 1.72 = 830.76 l.m. 12mmØ
Rb3 14 x 22 x 1.72 = 529.76 l.m. 12mmØ
Rb4 21 x 21 x 1.72 = 758.52 l.m. 12mmØ

GF SLAB Slab Length Spacing Bar Length


20.00 ÷ 0.40 + 1 x 25.00 = 1275.00 l.m. (10mm Ø)
court
26.00 ÷ 0.40 + 1 x 40.00 = 2640.00 l.m. (10mm Ø)
3.35 ÷ 0.40 + 1 x 25.00 = 234.38 l.m. (10mm Ø)
ramp
5.00 ÷ 0.40 + 1 x 40.00 = 540.00 l.m. (10mm Ø)

Area 6lm piece/area Qty


SS 520.00 3.22 3.00 30148.56 l.m. (12mm Ø)

Septic Tank Steel reinforcement


12mmØ Rebars
end bend span dowel net length set
base hor. bars 0.30 2.8 3.1 26.00 = 80.6 m
base long. bars 0.30 7.6 7.9 8.00 = 63.2 m
east vert. bars 0.30 2.15 2.45 10.00 = 24.5 m
east hor. bars 0.30 2.8 3.1 8.00 = 24.8 m
part 1 vert. bars 0.30 2.15 2.45 10.00 = 24.5 m
part 1 hor. bars 0.30 2.8 3.1 8.00 = 24.8 m
part 2 vert. bars 0.30 2.15 2.45 10.00 = 24.5 m
part 2 hor. bars 0.30 2.8 3.1 8.00 = 24.8 m
west t vert. bars 0.30 2.15 2.45 10.00 = 24.5 m
west hor. bars 0.30 2.8 3.1 8.00 = 24.8 m
north vert. bars 0.30 7.6 7.9 10.00 = 79 m
west hor. bars 0.30 2.8 3.1 26.00 = 80.6 m
lift bar 0.4 3.00 = 1.2 m
2007.2 m l.m. (12mm Ø)
1 set
2007.2
STAIRS No. of Steps Width
Nosing Bar 51 x 2.00 = 102.00 l.m. (10mm Ø)
Width Spacing Legth per piece No. of Steps
Thread Bar 2.00 + 0.30 x 0.60 x 51 = 1632 l.m. (10mm Ø)
Length Spacing Width set
Rebars 3.00 + 0.20 x 2.00 x 3 = 720 l.m. (12mm Ø)
3.00 + 0.20 x 2.00 x 3 = 720 l.m. (12mm Ø)
Width Spacing Length set
2.00 + 0.15 x 2.45 x 3 = 842.80 l.m. (12mm Ø)
2.00 + 0.15 x 2.50 x 3 = 322.50 l.m. (12mm Ø)

wt factor: Weight
32 mm Ø l.m. 6.310 0.00 kgs
25 mm Ø l.m. 3.853 0.00 kgs
20 mm Ø 8437.80 l.m. 2.469 20832.93 kgs
16 mm Ø 8426.00 l.m. 1.580 13313.08 kgs
12 mm Ø 59766.58 l.m. 0.888 53072.72 kgs
10 mm Ø 6321.38 l.m. 0.617 3900.29 kgs
kgs
Total: 91119.02 kgs

Formworks and Falseworks 1415.87 sq.m.


F1 2.90 x 2.90 x 0.400 x 49 = 227.36
Septic Tank Concrete
length x thickness x width = AREA
base 7.6 0.2 2.80 20.8
east side 2.8 0.15 2.15 9.9
west side 2.8 0.15 2.15 9.9
north side 7.6 0.15 2.15 19.5
south side 7.6 0.15 2.15 19.5
partition 1 2.5 0.15 2.15 9.3
partition 2 2.5 0.15 2.15 9.3
2 set
1 `sqm

Length Width Height Quantity


GB 1 4.5 x 0.3 x 0.4 x 28 = 104.16
GB 2 4 x 0.3 x 0.4 x 14 = 46.48
RB2 4 x 0.3 x 0.4 x 7 = 23.24
Rb3 3.5 x 0.3 x 0.4 x 14 = 40.88
Rb4 3 x 0.3 x 0.4 x 21 = 52.92

2nd flr & 3rd flr


B1 4.5 x 0.3 x 0.4 x 56 = 208.32
B2 4 x 0.3 x 0.4 x 42 = 139.44
B3 3.5 x 0.3 x 0.4 x 28 = 81.76
B4 3 x 0.3 x 0.4 x 44 = 110.88

4th flr
B1 4.5 x 0.3 x 0.4 x 28 = 104.16
B2 4 x 0.3 x 0.4 x 21 = 69.72
B3 3.5 x 0.3 x 0.4 x 14 = 40.88
B4 3 x 0.3 x 0.4 x 22 = 55.44

RB1 4.5 x 0.3 x 0.4 x 28 = 104.16


RB2 4 x 0.3 x 0.4 x 21 = 69.72
Rb3 3.5 x 0.3 x 0.4 x 14 = 40.88
Rb4 3 x 0.3 x 0.4 x 21 = 52.92

Length Width Height Quantity


C1 0.4 x 0.40 x 14.20 x 49 = 1113.28

Area Thickness Qty


SS 520.00 x 0.125 x 3.000 = 1560.00

Soil Poisoning 639.2832 Liter

Length Width Height Quantity Area


F1 2.90 x 2.90 x 0.400 x 49 = 227.36

Septic Tank 7.60 x 2.80 x 2.15 x 1 = 22.36 sq.m.


64L/25sq.m
= 639.2832 Liters

Sewer Line Works 1 Lump Sum

Plumbing Fixtures 1 Lump Sum

Cold Water Lines 1 Lump Sum

Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board 520.00 sq.m.

Length Width Quantity Area


4th flr 20.00 x 26.00 x 1 = 520
520

Fabricated Metal Roofing Accessory, gauge 24, Gutters 26 l.m.


Ridgeroll and Flashing 67 l.m.

Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span 572 sq.m.
572

Unglazed Tiles 2080.00 sq.m.


Length Width Quantity Area
GF 20.00 x 26.00 x 1 = 520
2nd flr 20.00 x 26.00 x 1 = 520
3rd flr 20.00 x 26.00 x 1 = 520
4th flr 20.00 x 26.00 x 1 = 520
2080

Cement Plaster Finish 4768.39 sq.m.


area set
100mm chb 1301.52 x 2.00 = 2603.04
150mm chb 922.16 x 2.00 = 1844.3244
column 321.024 x 1.00 = 321.024

4768.3884

Painting Works, Masonry/Concrete 4768.39 sq.m.

CHB Non Load Bearing (including Reinforcing Steel), 100 mm 1301.52 sq.m.
length height Qty
GF area 4.5 3 11 148.5 sq.m.
3.5 3 12 126 sq.m.
4 3 8 96 sq.m.
3 3 12 108 sq.m.
2.25 3 4 27 sq.m.

2F area 4.5 3 7 94.5 sq.m.


3.5 3 7 73.5 sq.m.
4 3 6.5 78 sq.m.
3 3 8 72 sq.m.
2.25 3 2 13.5 sq.m.

3f area 4.5 3 11 148.5 sq.m.


3.5 3 12 126 sq.m.
4 3 6.5 78 sq.m.
3 3 9 81 sq.m.

4f area 4.5 3 6 81 sq.m.


3.5 3 5 52.5 sq.m.
4 3 3 36 sq.m.
3 3 3 27 sq.m.

1467

length height Qty


D1 2 2.5 8 40 sq.m.
D3 1 2.2 3 6.6 sq.m.
D4 2 2.2 2 8.8 sq.m.
D5 0.9 2.2 16 31.68 sq.m.
D6 1.1 2.2 4 9.68 sq.m.
D7 0.8 2 16 25.6 sq.m.
D8 1 2.2 16 35.2 sq.m.
D9 1.8 2.2 2 7.92 sq.m.

less area of window and door = 165.48

CHB Non Load Bearing (including Reinforcing Steel), 150 mm 922.16 sq.m.
length height Qty
GF perimeter 92 3 1 276 sq.m.
2f, 3rd & 4th sq.m.
perimeter 92 3 3 828
1104

length height Qty


D1 2 2.5 2 10 sq.m.
D2 0.9 2.1 6 11.34 sq.m.
W1 1.92 0.48 8 7.3728 sq.m.
W2 0.6 0.48 5 1.44 sq.m.
W3 1 2 4 8 sq.m.
W4 3.78 1 4 15.12 sq.m.
W5 3 2.5 3 22.5 sq.m.
W6 2 0.63 2 2.52 sq.m.
W7 2 1 7 14 sq.m.
W8 2.5 15.85 1 39.625 sq.m.
W9 3.5 2.5 2 17.5 sq.m.
W10 1.1 0.55 4 2.42 sq.m.
W11 1 2.5 4 10 sq.m.
W12 2.5 2 3 15 sq.m.
W13 1.25 1 4 5 sq.m.

less area of window and door = 181.8378

-
length height Qty
D1 2 2.5 10 50 sq.m.
D2 0.9 2.1 6 11.34 sq.m.
D3 1 2.2 3 6.6 sq.m.
D4 2 2.2 2 8.8 sq.m.
D5 0.9 2.2 16 31.68 sq.m.
D6 1.1 2.2 4 9.68 sq.m.
D7 0.8 2 16 25.6 sq.m.
D8 1 2.2 16 35.2 sq.m.
D9 1.8 2.2 2 7.92 sq.m.
W1 1.92 0.48 8 7.3728 sq.m.
W2 0.6 0.48 5 1.44 sq.m.
W3 1 2 4 8 sq.m.
W4 3.78 1 4 15.12 sq.m.
W5 3 2.5 3 22.5 sq.m.
W6 2 0.63 2 2.52 sq.m.
W7 2 1 7 14 sq.m.
W8 2.5 15.85 1 39.625 sq.m.
W9 3.5 2.5 2 17.5 sq.m.
W10 1.1 0.55 4 2.42 sq.m.
W11 1 2.5 4 10 sq.m.
W12 2.5 2 3 15 sq.m.
W13 1.25 1 4 5 sq.m.
347.3178

Structural Steel, Trusses, Base Plate 44975.38 kgs.

truss1 Length Quantity Set wt. factor


L100x100x12 top 10.155 x 7 x 4 x 17.70 = 5032.818 kgs.
L100x100x12 bot 20 x 7 x 2 x 17.70 = 4956 kgs.
L100x100x12 mem 37.6 x 7 x 4 x 17.70 = 18634.56 kgs.

C purlin T1 Length Quantity wt. factor


28 x 40 x 14.60 = 16352 kgs.

1100 (10) Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in) Lump Sum
1101 (33) Wires and Wiring Devices Lump Sum
1102 (1) Panelboard with Main & Branch Breakers Lump Sum
1103 (1) Lighting Fixtures and Lamps Lump Sum

Prepared by:

PRINCESS M. MURIA
Engineer II
PROJECT TITLE

Item No./ Description : Mobilization / Demobilization


Unit of Measurement : Lump Sum
Output : 1.00
:

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1 -


Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
a. Self Loading Truck & Accessories -
b. Miscellaneous Handtools 350,000.00
Sub- Total for B.1 350,000.00
C.1 Total (A.1 + B.1) 350,000.00
D.1 Output 1.00
E.1 Direct Unit Cost (C.1 / D.1) 350,000.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1. -
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 350,000.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
I.1 Contractor's Profit (CP) . 0% of G.1 -
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 17,500.00
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 367,500.00
PROJECT TITLE

Item No./ Description : Structure Excavation


Unit of Measurement : cu.m.
Output per hour : 20.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.49 811.44 4,829.84
b. Unskilled Labor 4 1.49 453.76 2,700.86
Sub- Total for A.1. 7,530.71
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 a. Backhoe (0.80 m3) 4 1.49 12,296.00 73,188.10
b. Dumptruck (12 yd3) 4 1.49 11,360.00 67,616.85
Minor Tools (10% of Labor Cost) 753.07
Sub- Total for B.1. 141,558.02
C.1 Total (A.1 + B.1) . 149,088.73
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials

Sub- Total for F.1.


G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 149,088.73
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 22,363.31
I.1 Contractor's Profit (CP) . 10% of G.1 14,908.87
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 9,318.05
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 195,678.95
PROJECT TITLE

Item No./ Description : Embankment, From roadway/structure excavation


Unit of Measurement : cu.m.
Output per hour : 9.84

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 3.03 811.44 7,367.22
b. Unskilled Labor 3 3.03 453.76 4,119.77
Sub- Total for A.1. 11,486.99
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 a. Plate Compactor (5 hp) 3 2.27 984.00 6,700.44
b. Backhoe (0.80 m3) 3 2.27 12,296.00 83,728.31
Minor Tools (10% of Labor Cost) 1,148.70
Sub- Total for B.1. 91,577.45
C.1 Total (A.1 + B.1) . 103,064.45
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1. -
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 103,064.45
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 15,459.67
I.1 Contractor's Profit (CP) . 10% of G.1 10,306.44
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 6,441.53
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 135,272.09
PROJECT TITLE

Item No./ Description : Gravel fill


Unit of Measurement : cu.m.
Output per hour : 1.20

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 0.79 811.44 3,842.93
b. Unskilled Labor 6 0.79 453.76 2,148.98
Sub- Total for A.1. 5,991.91
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
a. Plate Compactor (5 hp) 3 0.79 984.00 2,330.08
Minor Tools (10% of Labor Cost) 599.19
Sub- Total for B.1. 2,929.27
C.1 Total (A.1 + B.1) . 8,921.18
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Gravel Bedding (G1) cu.m. 47.74 917.50 43,799.84
(w/ 5% Shrinkage Factor) -
Sub- Total for F.1. 43,799.84
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 52,721.02
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 7,908.15
I.1 Contractor's Profit (CP) . 10% of G.1 5,272.10
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 3,295.06
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 69,196.34
PROJECT TITLE

Item No./ Description : Structural Concrete, Class A


Unit of Measurement : cu.m.
Output per hour : 3.72

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 19.38 811.44 31,451.23
b. Skilled Labor 4 19.38 589.20 45,674.52
b. Unskilled Labor 12 19.38 453.76 105,525.82
Sub- Total for A.1. 182,651.58
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 a.Concrete Vibrator 8 9.69 1,376.00 106,666.91
a. Pumpcrete 4 9.69 738.00 57,209.43
Minor Tools (5% of Labor Cost) 9,132.58
Sub- Total for B.1. 173,008.92
C.1 Total (A.1 + B.1) . 355,660.50
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1153.49 700.00 807,443.70
b. Sand cu.m. 576.75 500.00 288,372.75
c. Cement bags 10496.77 254.00 2,666,179.10
Sub- Total for F.1. 3,761,995.55
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 4,117,656.05
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 617,648.41
I.1 Contractor's Profit (CP) . 10% of G.1 411,765.60
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 257,353.50
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 5,404,423.56
PROJECT TITLE

Item No./ Description : Reinforcing Steel (Deformed)


Unit of Measurement : kg.
Output per hour : 129.09

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 52.94 811.44 71,592.81
b. Skilled Labor 5 52.94 589.20 155,954.17
b. Unskilled Labor 20 52.94 453.76 480,419.30
Sub- Total for A.1. 707,966.28
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 a. Bar Cutter 1 26.47 1,758.00 77,553.58
b. Bar Bender 1 26.47 2,812.00 124,050.44
Minor Tools (10% of Labor Cost) 70,796.63
Sub- Total for B.1. 272,400.65
C.1 Total (A.1 + B.1) . 980,366.93
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Deformed Reinforcing Steel kg 91119.02 41.00 3,735,879.80
b. #16 Galvanized iron wire kg 1366.79 87.00 118,910.32
c. Consumables (5% of Material Cost) 192,739.51
Sub- Total for F.1. 4,047,529.63
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,027,896.56
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 754,184.48
I.1 Contractor's Profit (CP) . 10% of G.1 502,789.66
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 314,243.54
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 6,599,114.24
PROJECT TITLE

Item No./ Description : Formworks and Falseworks


Unit of Measurement : sq.m.
Output per hour : 4.50

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
Installation
a. Construction foreman 1 19.65 811.44 31,881.72
A.1 b. Skilled Laborer 8 19.65 589.20 92,599.38
c. Unskilled Laborer 12 19.65 453.76 106,970.20
Stripping -
a. Construction foreman 1 10.97 811.44 17,807.81
b. Unskilled Laborer 12 10.97 453.76 59,749.12
Sub- Total for A.1. 309,008.23
Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)
Equipment
Area = 4.5 sq.m.
a. H-Frame 1.7 m x 1.2m, set 1.500 7.40 48.64 1,079.32
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
B.1 b. Shoring Jack, 3.8 m full extension 2.000 8.60 36.00 619.10
c. Adjustable U-head Jack, 0.6m 3.000 7.40 6.80 150.89
d. Adjustable Base Jack, 0.6m 3.000 7.40 6.80 150.89
e. 1-1/2" GI Pipe x 6.0 m 2.000 8.60 20.00 343.95
f. 1-1/2" GI Pipe x 3.0 m 1.000 4.44 10.00 44.38
g. 1-1/2" GI Pipe x 4.0 m 1.000 8.88 14.00 124.26
h. 1-1/2" GI Pipe x 1.0 m 10.000 5.99 4.00 239.65
i. Tie Rod x 0.60m 7.000 11.02 8.00 616.88
j. Round Wing Nut 13.000 11.91 1.20 185.73
Sub- Total for B.1. 3,555.07
C.1 Total (A.1 + B.1) . 312,563.29
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 491.31 1,336.00 131,276.89
b. Good Lumber bd.ft 6692.80 55.00 122,701.37
c. Consumables (5% of Material Cost) 12,698.91
Sub- Total for F.1. 266,677.17
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 579,240.46
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 86,886.07
I.1 Contractor's Profit (CP) . 10% of G.1 57,924.05
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 36,202.53
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 760,253.11
PROJECT TITLE

Item No./ Description : Soil Poisoning


Unit of Measurement : Liter
Output per hour : 5.40

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 3.70 811.44 12,007.87
b. Skilled Laborer 4 3.70 589.20 8,719.11
c. Unskilled Laborer 8 3.70 453.76 13,429.68
Sub- Total for A.1. 34,156.66
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 3,415.67
Sub- Total for B.1. 3,415.67
C.1 Total (A.1 + B.1) . 37,572.33
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Soil Poisoning L 639.28 275.00 175,802.88
Sub- Total for F.1. 175,802.88
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 213,375.21
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 32,006.28
I.1 Contractor's Profit (CP) . 10% of G.1 21,337.52
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 13,335.95
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 280,054.96
PROJECT TITLE

Item No./ Description : Sewer Line Works


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 24.00 811.44 19,474.56
b. Skilled Laborer 10 24.00 589.20 141,408.00
c. Unskilled Laborer 16 24.00 453.76 174,243.84
Sub- Total for A.1. 335,126.40
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 33,512.64
Sub- Total for B.1. 33,512.64
C.1 Total (A.1 + B.1) . 368,639.04
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
150mm dia PVC pipe pcs 15.00 1,016.00 15,240.00
100mm dia PVC pipe pcs 66.00 506.00 33,396.00
100mm x 50mm Tee pcs 2.00 140.00 280.00
100mm elbow 45 deg pcs 84.00 90.00 7,560.00
100mm elbow 90 deg pcs 84.00 81.00 6,804.00
F.1
100mm dia cleanout pcs 12.00 36.00 432.00
50mm dia PVC pipe pcs 58.00 168.00 9,744.00
50mm dia p-trap pcs 84.00 98.00 8,232.00
50mm dia tee pcs 48.00 37.00 1,776.00
50mm dia PVC elbow 45 deg pcs 32.00 50.00 1,600.00
50mm dia elbow 90 deg pcs 40.00 26.00 1,040.00
Consumable (5%) 3,543.20
Sub- Total for F.1. 89,647.20
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 458,286.24
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 68,742.94
I.1 Contractor's Profit (CP) . 10% of G.1 45,828.62
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 28,642.89
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 601,500.69
PROJECT TITLE

Item No./ Description : Plumbing Fixtures


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 7.00 811.44 5,680.08
b. Skilled Laborer 8 7.00 589.20 32,995.20
c. Unskilled Laborer 12 7.00 453.76 38,115.84
Sub- Total for A.1. 76,791.12
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 7,679.11
Sub- Total for B.1. 7,679.11
C.1 Total (A.1 + B.1) . 84,470.23
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Water Closet including fittings and accessories (elon set/s 52.00 12,000.00 624,000.00
F.1 Lavatory including fittings and accessories american s set/s 38.00 4,700.00 178,600.00
Faucet pcs. 38.00 240.00 9,120.00
Urinal pcs. 16.00 6,400.00 102,400.00
Floor Drains (stainless steel with waterless trap) pcs. 30.00 195.00 5,850.00
Sub- Total for F.1. 919,970.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 1,004,440.23
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 150,666.03
I.1 Contractor's Profit (CP) . 10% of G.1 100,444.02
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 62,777.51
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,318,327.80
PROJECT TITLE

Item No./ Description : Cold Water Lines


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 18.00 811.44 14,605.92
b. Skilled Laborer 6 18.00 589.20 63,633.60
c. Unskilled Laborer 12 18.00 453.76 98,012.16
Sub- Total for A.1. 176,251.68
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 17,625.17
Sub- Total for B.1. 17,625.17
C.1 Total (A.1 + B.1) . 193,876.85
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
G.I Pipe 12.7mm pcs 88.00 336.00 29,568.00
G.I tee 12.70mm pcs 120.00 12.00 1,440.00
F.1 G.I elbow 12.70mm pcs 65.00 15.00 975.00
G.I end cap pcs 22.00 7.00 154.00
G.I union patente pcs 3.00 33.00 99.00
G.I gate valve pcs 3.00 379.00 1,137.00
Consumable (5%) 1,668.65
Sub- Total for F.1. 35,041.65
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 228,918.50
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 34,337.77
I.1 Contractor's Profit (CP) . 10% of G.1 22,891.85
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 14,307.41
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 300,455.53
PROJECT TITLE

Item No./ Description : Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
Unit of Measurement : sq.m.
Output per hour : 1.49

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.72 811.44 35,390.96
b. Skilled Laborer 5 8.72 589.20 25,697.96
c. Unskilled Laborer 10 8.72 453.76 39,581.48
Sub- Total for A.1. 100,670.40
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 10,067.04
Sub- Total for B.1. 10,067.04
C.1 Total (A.1 + B.1) . 110,737.44
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 4.5mm Fiber Cement Board/ 4.5mm Marine Plywo pc. 189.800 450.00 85,410.00
b. Metal Furring pc. 588.120 130.00 76,455.60
c. Carrying Channels pc. 185.640 150.00 27,846.00
F.1
d. Hanger Bars/Rod pc. 520.000 80.00 41,600.00
e. Channel Clip pc. 3120.000 20.00 62,400.00
f. Wall Angle pc. 123.760 100.00 12,376.00
g. Rivets pc. 7280.000 1.50 10,920.00
h. 1" Metal Screw pc. 2080.000 3.00 6,240.00
Sub- Total for F.1. 323,247.60
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 433,985.04
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 65,097.76
I.1 Contractor's Profit (CP) . 10% of G.1 43,398.50
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 27,124.06
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 569,605.36
PROJECT TITLE

Item No./ Description : Doors and Windows


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 811.44 6,491.52
b. Skilled Laborer 16 8.00 589.20 75,417.60
c. Unskilled Laborer 32 8.00 453.76 116,162.56
Sub- Total for A.1. 198,071.68
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 19,807.17
Sub- Total for B.1. 19,807.17
C.1 Total (A.1 + B.1) . 217,878.85
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
D1 each. 10.00 13,000.00 130,000.00
D2 each. 6.00 4,914.00 29,484.00
D3 each. 3.00 4,950.00 14,850.00
D4 each. 2.00 9,900.00 19,800.00
D5 each. 16.00 4,455.00 71,280.00
D6 each. 4.00 4,356.00 17,424.00
Err:509 each. Err:509 Err:509 Err:509
W1 each. 8.00 1,658.88 13,271.04
W2 each. 5.00 518.40 2,592.00
W3 each. 4.00 5,300.00 21,200.00
W4 each. 4.00 6,804.00 27,216.00
F.1
W5 each. 3.00 13,500.00 40,500.00
W6 each. 2.00 2,268.00 4,536.00
W7 each. 7.00 3,600.00 25,200.00
W8 each. 1.00 71,325.00 71,325.00
W9 each. 2.00 15,750.00 31,500.00
W10 each. 4.00 1,089.00 4,356.00
W11 each. 4.00 4,500.00 18,000.00
W12 each. 3.00 9,000.00 27,000.00
W13 each. 4.00 2,250.00 9,000.00
Err:509 each. Err:509 Err:509 Err:509
Err:509 each. Err:509 Err:509 Err:509
Err:509 each. Err:509 Err:509 Err:509
Err:509 each. Err:509 Err:509 Err:509
Sub- Total for F.1. Err:509
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated Err:509
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 Err:509
I.1 Contractor's Profit (CP) . 10% of G.1 Err:509
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) Err:509
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) Err:509
PROJECT TITLE

Item No./ Description : Fabricated Metal Roofing Accessory, gauge 24, Gutters
Unit of Measurement : l.m.
Output per hour : 11.80

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 0.99 811.44 801.80
b. Skilled Laborer 2 0.99 589.20 1,164.41
c. Unskilled Laborer 4 0.99 453.76 1,793.49
Sub- Total for A.1. 3,759.70
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 375.97
Sub- Total for B.1. 375.97
C.1 Total (A.1 + B.1) . 4,135.67
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Gutter (0.6 mm) m 26.00 168.00 4,368.00
F.1 b. 12" x 1" Plain GI Strap pc 279.00 40.00 11,160.00
c. Blind Rivets pc 2976.00 1.50 4,464.00
d. Ridgeroll and Flashing pc 67.00 350.00 23,450.00
c. Consumables (3% of Materials Cost) 1,303.26
Sub- Total for F.1. 44,745.26
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 48,880.93
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 7,332.14
I.1 Contractor's Profit (CP) . 10% of G.1 4,888.09
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 3,055.06
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 64,156.22
PROJECT TITLE

Item No./ Description : Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span
Unit of Measurement : sq.m.
Output per hour : 2.08

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 6.86 811.44 27,848.62
b. Skilled Laborer 5 6.86 589.20 20,221.34
c. Unskilled Laborer 10 6.86 453.76 31,146.09
Sub- Total for A.1. 79,216.05
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 7,921.61
Sub- Total for B.1. 7,921.61
C.1 Total (A.1 + B.1) . 87,137.66
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Prepainted Metal Sheets (Corrugated, Short sq.m. 600.60 370.00 222,222.00
F.1 Span/ Long Span, below 0.427mm thk/ above -
0.427mm thk) -
b. Tek screw/J-bolt with washers pc 5720.00 4.00 22,880.00
c. Consumables (3% of Materials Cost) 7,353.06
Sub- Total for F.1. 252,455.06
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 339,592.72
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 50,938.91
I.1 Contractor's Profit (CP) . 10% of G.1 33,959.27
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 21,224.54
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 445,715.44
PROJECT TITLE

Item No./ Description : Unglazed Tiles


Unit of Measurement : sq.m
Output per hour : 1.95

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 22.23 811.44 108,229.87
b. Skilled Laborer 12 22.23 589.20 157,174.99
c. Unskilled Laborer 12 22.23 453.76 121,045.02
Sub- Total for A.1. 386,449.88
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 38,644.99
Sub- Total for B.1. 38,644.99
C.1 Total (A.1 + B.1) . 425,094.86
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 2184.00 350.00 764,400.00
F.1 Granite -
b. Cement bags 676.00 254.00 171,704.00
c. Sand cu.m. 54.08 500.00 27,040.00
d. Tile Grout bags 260.00 116.00 30,160.00
Sub- Total for F.1. 993,304.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 1,418,398.86
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 212,759.83
I.1 Contractor's Profit (CP) . 10% of G.1 141,839.89
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 88,649.93
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,861,648.51
PROJECT TITLE

Item No./ Description : Cement Plaster Finish


Unit of Measurement : sq.m
Output per hour : 7.13

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 27.82 811.44 67,712.07
b. Skilled Laborer 6 27.82 589.20 98,333.71
c. Unskilled Laborer 12 27.82 453.76 151,459.27
Sub- Total for A.1. 317,505.05
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 31,750.50
Sub- Total for B.1. 31,750.50
C.1 Total (A.1 + B.1) . 349,255.55
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Cement bag 1573.57 254.00 399,686.32
b. Sand cu.m. 128.75 1,008.50 129,840.83
Sub- Total for F.1. 529,527.15
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 878,782.70
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 131,817.41
I.1 Contractor's Profit (CP) . 10% of G.1 87,878.27
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 54,923.92
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,153,402.30
PROJECT TITLE

Item No./ Description : Painting Works, Masonry/Concrete


Unit of Measurement : sq.m
Output per hour : 2.10

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 23.64 811.44 230,221.03
b. Skilled Laborer 12 23.64 589.20 167,167.30
c. Unskilled Laborer 12 23.64 453.76 128,740.38
Sub- Total for A.1. 526,128.72
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 52,612.87
Sub- Total for B.1. 52,612.87
C.1 Total (A.1 + B.1) . 578,741.59
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Concrete Neutralizer gal 95.37 112.00 10,681.19
F.1 b. Concrete Sealer/Primer gal 190.74 190.00 36,239.75
c. Patching Compound gal 238.42 60.00 14,305.17
d. Semi Gloss Latex (two coat only) gal 381.47 595.00 226,975.29
e. Consumables (5% of Materials Cost) 14,410.07
Sub- Total for F.1. 302,611.46
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 881,353.05
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 132,202.96
I.1 Contractor's Profit (CP) . 10% of G.1 88,135.31
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 55,084.57
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,156,775.88
PROJECT TITLE

Item No./ Description : CHB Non Load Bearing (including Reinforcing Steel), 100 mm
Unit of Measurement : sq.m
Output per hour : 3.83

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 14.15 811.44 34,455.44
b. Skilled Laborer 6 14.15 589.20 50,037.33
c. Unskilled Laborer 9 14.15 453.76 57,802.79
Sub- Total for A.1. 142,295.56
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 14,229.56
Sub- Total for B.1. 14,229.56
C.1 Total (A.1 + B.1) . 156,525.11
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 100 mm thk. CHB (Ordinary) pc 16919.76 20.00 338,395.20
F.1 b. Cement bag 683.30 254.00 173,557.69
c. Sand cu.m 52.06 1,008.50 52,503.32
d. Reinforcing Steel kg 4216.92 41.00 172,893.92
e. #16 Tie Wire kg 65.08 87.00 5,661.61
Sub- Total for F.1. 743,011.74
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 899,536.85
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 134,930.53
I.1 Contractor's Profit (CP) . 10% of G.1 89,953.69
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 56,221.05
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,180,642.12
PROJECT TITLE

Item No./ Description : CHB Non Load Bearing (including Reinforcing Steel), 150 mm
Unit of Measurement : sq.m
Output per hour : 3.18

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 12.06 811.44 29,369.96
b. Skilled Laborer 6 12.06 589.20 42,652.03
c. Unskilled Laborer 9 12.06 453.76 49,271.35
Sub- Total for A.1. 121,293.34
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 12,129.33
Sub- Total for B.1. 12,129.33
C.1 Total (A.1 + B.1) . 133,422.67
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 150 mm thk. CHB (Ordinary) pc 11988.11 22.00 263,738.39
F.1 b. Cement bag 1383.24 254.00 351,343.80
c. Sand cu.m 36.89 1,008.50 37,200.02
d. Reinforcing Steel kg 2987.81 41.00 122,500.03
e. #16 Tie Wire kg 46.11 87.00 4,011.41
Sub- Total for F.1. 778,793.64
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 912,216.32
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 136,832.45
I.1 Contractor's Profit (CP) . 10% of G.1 91,221.63
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 57,013.52
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,197,283.92
PROJECT TITLE

Item No./ Description : Structural Steel, Trusses


Unit of Measurement : kg
Output per hour : 85.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
Fabrication
a. Construction Foreman 1 16.58 811.44 53,829.86
A.1 b. Skilled Laborer 8 16.58 589.20 78,173.50
c. Unskilled Laborer 8 16.58 453.76 60,203.68
Erection -
a. Skilled Laborer 12 8.10 589.20 57,278.65
b. Unskilled Laborer 12 8.10 453.76 44,111.95
Sub- Total for A.1. 293,597.65
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
a. Welding Machine 1 12.40 2,968.00 36,809.02
B.1
b .Cutting Outfit 1 4.13 363.60 1,502.44
c. Truck Mounted Crane (20-25 mt) 1 8.10 13,048.00 422,817.31
Minor Tools (10% of Labor Cost) 29,359.77
Sub- Total for B.1. 490,488.53
C.1 Total (A.1 + B.1) . 784,086.18
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Structural Steel Framing including kg 44975.38 50.00 2,248,768.90
cross bracing,truss,purlins) -
F.1
b. Acetylene kg 494.73 60.00 29,683.75
c. Oxygen kg 989.46 30.00 29,683.75
d. Welding Rod kg 899.51 110.00 98,945.83
e. Consumables (5% of Materials Cost) 120,354.11
Sub- Total for F.1. 2,527,436.34
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,311,522.52
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 496,728.38
I.1 Contractor's Profit (CP) . 10% of G.1 331,152.25
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 206,970.16
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 4,346,373.31
PROJECT TITLE

Item No./ Description : Building Accessories


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 14.00 811.44 11,360.16
b. Skilled Laborer 12 14.00 589.20 98,985.60
c. Unskilled Laborer 12 14.00 453.76 76,231.68
Sub- Total for A.1. 186,577.44
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 a. Welding machine 18 14.00 371.00 93,492.00
b. Cutting outfit 18 14.00 45.45 11,453.40
Minor Tools (10% of Labor Cost) 18,657.74
Sub- Total for B.1. 123,603.14
C.1 Total (A.1 + B.1) . 310,180.58
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
38mm dia. G.I. Pipe pc 270.00 1,074.00 289,980.00
F.1 50mm dia. G.I. Pipe pc 150.00 1,074.00 161,100.00
FCU pc 198.00 25,000.00 4,950,000.00
ACU pc 6.00 65,000.00 390,000.00
Cosumable (5%) 289,554.00
Sub- Total for F.1. 6,080,634.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 6,390,814.58
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 958,622.19
I.1 Contractor's Profit (CP) . 10% of G.1 639,081.46
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 399,425.91
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 8,387,944.14
PROJECT TITLE

Item No./ Description : Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in)
Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 811.44 19,474.56
b. Reg. Master Electrician / NCII Electrician 8 24.00 738.48 141,788.16
c. Helper 16 24.00 453.76 174,243.84
Sub- Total for A.1. 335,506.56
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 33,550.66
Sub- Total for B.1. 33,550.66
C.1 Total (A.1 + B.1) . 369,057.22
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 369,057.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
20 mmΦ uPVC Pipe m 1002.00 30.67 30,728.00
Utility box, 2" X 4" PVC pcs 16.00 38.00 608.00
F.1
Octagonal Junction Box, 4" X 4" with cover uPVC sets 32.00 32.00 1,024.00
Square Box with cover, uPVC sets 32.00 43.00 1,376.00
G.I. Wire gauge 16 kgs 48.00 87.00 4,176.00
Consumables (3% of material cost) 1,137.36
Sub- Total for F.1. 39,049.36
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 408,106.58
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 61,215.99
I.1 Contractor's Profit (CP) . 10% of G.1 40,810.66
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 25,506.66
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 535,639.88
PROJECT TITLE

Item No./ Description Wires and Wiring Devices


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 811.44 19,474.56
b. Reg. Master Electrician / NCII Electrician 8 24.00 738.48 141,788.16
c. Helper 16 24.00 453.76 174,243.84
Sub- Total for A.1. 335,506.56
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 33,550.66
Sub- Total for B.1. 33,550.66
C.1 Total (A.1 + B.1) . 369,057.22
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 369,057.22
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
3.5 sq. mm. THHN m 1568.00 25.00 39,200.00
8.0sq. mm. THHN m 1250.00 39.00 48,750.00
5 sq. mm. THHN m 1432.00 36.00 51,552.00
14 sq. mm. THHN m 869.00 99.00 86,031.00
F.1 15 sq. mm. THHN m 695.00 120.00 83,400.00
22 sq. mm. THHN m 544.00 143.00 77,792.00
32 sq. mm. THHN m 544.00 157.00 85,408.00
PVC Electrical tape, big m 600.00 27.00 16,200.00
Single Pole Wall Switch on one switch plate sets 132.00 65.00 8,580.00
Duplex Universal Convenience Outlets/Receptacles sets 164.00 95.00 15,580.00
Consumables (3% of material cost) 15,374.79
Sub- Total for F.1. 527,867.79
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 896,925.01
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 134,538.75
I.1 Contractor's Profit (CP) . 10% of G.1 89,692.50
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 56,057.81
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,177,214.07
PROJECT TITLE

Item No./ Description Panelboard with Main & Branch Breakers


Unit of Measurement : Lump Sum
Output per hour : 1.00
:

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 7.00 811.44 5,680.08
b. Reg. Master Electrician / NCII Electrician 3 7.00 738.48 15,508.08
c. Helper 6 7.00 453.76 19,057.92
Sub- Total for A.1. 40,246.08
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10 % of Labor Cost) 4,024.61
Sub- Total for B.1. 4,024.61
C.1 Total (A.1 + B.1) . 44,270.69
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 44,270.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
Main: 70AT/150AF, 2P, 4 Branches, Bolt-on type set 18.00 39,592.00 712,656.00
Consumables (3% of material cost) 21,379.68
Sub- Total for F.1. 734,035.68
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 778,306.37
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 116,745.96
I.1 Contractor's Profit (CP) . 10% of G.1 77,830.64
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 48,644.15
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,021,527.11
PROJECT TITLE

Item No./ Description Lighting Fixtures and Lamps


Unit of Measurement : Lump Sum
Output per hour : 1.00
:

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 7.00 811.44 5,680.08
b. Reg. Master Electrician / NCII Electrician 8 7.00 738.48 41,354.88
c. Helper 12 7.00 453.76 38,115.84
Sub- Total for A.1. 85,150.80
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 8,515.08
Sub- Total for B.1. 8,515.08
C.1 Total (A.1 + B.1) . 93,665.88
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 93,665.88
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Led Bulb 14W pcs 239.00 300.00 71,700.00
F.1 Led Fluorescent DoubleTube 18W pcs 272.00 700.00 190,400.00
Double Pin Lingth pcs 10.00 300.00 3,000.00
Outlet pcs 124.00 300.00 37,200.00
ConsumablesConsumablesConsumables (3% of material cost) 9,069.00
Sub- Total for F.1. 311,369.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 405,034.88
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 60,755.23
I.1 Contractor's Profit (CP) . 10% of G.1 40,503.49
J.1 Value Added Tax (VAT). 5% of (G.1 + H.1 + I.1) 25,314.68
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 531,608.28
DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

ELEVATED WATER TANK


NAME OF PROJECT : Unit Cost/sq.m :

Assumed Qty. : 1.00


LOCATION : BARANGAY MUNTING PULO, LIPA CITY

BILL NO. 1 : General Expenses

ITEM NO. 1.01 : Mobilization / Demobilization

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Equipment Operator 2 ₱ 795.05 ₱ 1,590.10

Sub-total P 1,590.10
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Self Loading Truck & Accessories
Miscellaneous Handtools ₱ 80,000.00
Sub-total P 80,000.00
D. ESTIMATED DIRECT COST (TOTAL) P 81,590.10

E. MARK-UPS P -
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 0% of EDC -
2. Contractor's Profit, 0% of EDC -

F. VAT, 5% of (EDC + Mark-ups) P 4,079.51

G. TOTAL COST OF WORK ITEM P 85,669.61

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 85,669.61


DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

ELEVATED WATER TANK


NAME OF PROJECT : Unit Cost/sq.m :

BARANGAY MUNTING PULO, LIPA CITY Assumed Qty. : 1.00


LOCATION :

BILL NO. 2 : Structure Excavation

ITEM NO. 2.01 : Water Tank

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 1 3.000 ₱ 688.18 ₱ 4,829.84
Heavy Equipment Operator 1 1.000 ₱ 795.05 ₱ 2,700.86
Sub-total P 7530.71
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Backhoe 1.00 1 ₱ 16,768.00 ₱ 16,768.00
Dumptruck 1.00 1 ₱ 11,360.00 ₱ 11,360.00
Minor Tools (10% of Labor Cost) ₱ 753.07
Sub-total P 28,881.07
D. ESTIMATED DIRECT COST (TOTAL) P 36,411.78

E. MARK-UPS P 9,102.94
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 5,461.77
2. Contractor's Profit, 10% of EDC 3,641.18

F. VAT, 5% of (EDC + Mark-ups) P 2,275.74

G. TOTAL COST OF WORK ITEM P 47,790.46

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 47,790.46


DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

ELEVATED WATER TANK


NAME OF PROJECT : Unit Cost/sq.m :

BARANGAY MUNTING PULO, LIPA CITY Assumed Qty. : 1.00


LOCATION :

BILL NO. 2 : Structural Concrete

ITEM NO. 2.02 : Water Tank

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Fortune Cement bags 84.00 ₱ 250.00 ₱ 21,000.00
Sand cu.m 4.64 ₱ 950.00 ₱ 4,408.00
3/4" Gravel cu.m 9.28 ₱ 700.00 ₱ 6,496.00
Sub-total P 31,904.00
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 2.00 2 ₱ 688.18 ₱ 2,752.72
Unskilled Labor 2.00 2 ₱ 529.84 ₱ 2,119.36
Sub-total P 4,872.08
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
One Bagger Mixer 2.00 1 1,376.00 ₱ 2,752.00
0.00
Minor Tools (10% of Labor Cost) ₱ 487.21
Sub-total P 3,239.21
D. ESTIMATED DIRECT COST (TOTAL) P 40,015.29

E. MARK-UPS P 10,003.82
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 6,002.29
2. Contractor's Profit, 10% of EDC 4,001.53

F. VAT, 5% of (EDC + Mark-ups) P 2,500.96

G. TOTAL COST OF WORK ITEM P 52,520.07

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 52,520.07


DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

ELEVATED WATER TANK


NAME OF PROJECT : Unit Cost/sq.m :

BARANGAY MUNTING PULO, LIPA CITY Assumed Qty. : 1.00


LOCATION :

BILL NO. 2 : Reinforcing Steel, Grade 60 (Deformed)

ITEM NO. 2.03 : Water Tank

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
W12 x190 kgs 1134.80 ₱ 95.00 ₱ 107,806.00
L100 x 75 x 8 kgs 1014.72 ₱ 134.70 ₱ 136,682.78
Railings kgs 103.00 ₱ 187.30 ₱ 19,291.90
Stairs m 193.07 ₱ 364.00 ₱ 70,277.48
Sub-total P 334,058.16
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 2.00 2 ₱ 688.18 ₱ 2,752.72
Unskilled Laborer 2.00 2 ₱ 529.84 ₱ 2,119.36
Steelman 2.00 2 ₱ 688.18 ₱ 2,752.72
Sub-total P 7,624.80
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Bar Cutter 2.00 1 ₱ 843.76 ₱ 1,687.52
Bar Bender 2.00 1 ₱ 1,350.00 ₱ 2,700.00
Minor tools
Sub-total P 4,387.52
D. ESTIMATED DIRECT COST (TOTAL) P 346,070.48

E. MARK-UPS P 86,517.62
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 51,910.57
2. Contractor's Profit, 10% of EDC 34,607.05

F. VAT, 5% of (EDC + Mark-ups) P 21,629.41

G. TOTAL COST OF WORK ITEM P 454,217.51

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 454,217.51


DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

ELEVATED WATER TANK


NAME OF PROJECT : Unit Cost/sq.m :

BARANGAY MUNTING PULO, LIPA CITY Assumed Qty. : 1.00


LOCATION :

BILL NO. 3 : Formworks and Scaffoldings

ITEM NO. 3.01 : Water Tank

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
4' x 8 ' Maring Plywood pcs 5.00 ₱ 670.00 ₱ 3,350.00
2" x 3" x 14' Lumber (Coco Lumber) bd.ft 546.00 ₱ 30.00 ₱ 16,380.00
Consumables (5% of Materials Cost) ₱ 986.50
Sub-total P 20,716.50
DAYS NUMBER RATE/DAY
B. LABOR :
Construction Foreman 20.00 1 ₱ 873.52 17,470.40
Skilled Laborer 20.00 4 ₱ 688.18 55,054.40

Sub-total P 72,524.80
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :

Minor Tools (5% of Labor Cost) ₱ 3,626.24


Sub-total P 3,626.24
D. ESTIMATED DIRECT COST (TOTAL) P 96,867.54

E. MARK-UPS P 24,216.89
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 14,530.13
2. Contractor's Profit, 10% of EDC 9,686.75

F. VAT, 5% of (EDC + Mark-ups) P 6,054.22

G. TOTAL COST OF WORK ITEM P 127,138.65

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 127,138.65


DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

ELEVATED WATER TANK


NAME OF PROJECT : Unit Cost/sq.m :

BARANGAY MUNTING PULO, LIPA CITY Assumed Qty. : 1.00


LOCATION :

BILL NO. 4 : Building Accessories

ITEM NO. 4.01 : Water Tank

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Stainless Steel Plate 4' x 8' pcs 46.00 ₱ 1,651.00 ₱ 75,946.00
Steel Plate pcs 4.00 ₱ 14,245.40 ₱ 56,981.60
Stainless Steel Pipe 50mm dia. pcs 16.00 ₱ 3,045.90 ₱ 48,734.40
24mm dia anchor bolts pcs 32.00 ₱ 511.36 ₱ 16,363.52
Sub-total P 198,025.52
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Labor 2.00 3 ₱ 688.18 ₱ 4,129.08

Sub-total P 4,129.08
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Welding Machine 2.00 1 2,968.00 5,936.00
Cutting Outfit 2.00 1 363.60 727.20
Truck Mounted Crane 2.00 1 13,048.00 26,096.00
Minor Tools (10% of Labor Cost) 412.91 412.91
Sub-total P 33,172.11
D. ESTIMATED DIRECT COST (TOTAL) P 235,326.71

E. MARK-UPS P 58,831.68
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 35,299.01
2. Contractor's Profit, 10% of EDC 23,532.67

F. VAT, 5% of (EDC + Mark-ups) P 14,707.92

G. TOTAL COST OF WORK ITEM P 308,866.30

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 308,866.30


DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date :

NAME OF PROJECT : ELEVATED WATER TANK Unit Cost/sq.m :

Assumed Qty. : 1.00


BARANGAY MUNTING PULO, LIPA CITY
LOCATION :

BILL NO. 5 : OTHER GENERAL REQUIREMENTS

ITEM NO. 5.01 : Occupational Health and Safety Program

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Working Gloves pcs. 20.00 ₱ 25.00 500.00
First Aide Kit pcs. 1.00 ₱ 100.00 100.00
Safety Helmet (Hard Hat) pcs. 20.00 ₱ 800.00 16,000.00
Dust Mask pcs. 20.00 ₱ 50.00 1,000.00
Sub-total P 17,600.00
DAYS NUMBER RATE/DAY
B. LABOR :
Sub-total P
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :

Sub-total P -
D. ESTIMATED DIRECT COST (TOTAL) P 17,600.00

E. MARK-UPS P 4,400.00
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 2,640.00
2. Contractor's Profit, 10% of EDC 1,760.00

F. VAT, 5% of (EDC + Mark-ups) P 1,100.00

G. TOTAL COST OF WORK ITEM P 23,100.00

H. UNIT COST (Total Cost of Work Item/Assumed Quantity) P 23,100.00