DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : A.1.1 (8)
Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : Month
Output - As Submitted :1
Output - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. 1
Page 1
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : A.1.4 (1)
Provision of Progress Photographs
Unit of Measurement : Each
Output - As Submitted : 240
Output - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. 2
Page 2
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : B.5
Project Billboard / Signboard
Unit of Measurement : Each
Output - As Submitted : 2.00
Output - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. 3
Page 3
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : B.7 (1)
Occupational Safety and Health Program
Unit of Measurement : Month
Output per Month - As Submitted : 1.00
Output per Month - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. 4
Page 4
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : B.9
Mobilization / Demobilization
Unit of Measurement : Lump Sum
Output - As Submitted : 1.00
Output - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 5
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 101 (1)
Removal of Structures and Obstruction
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 6
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 803 (1) a
Structure Excavation, Common Soil
Unit of Measurement : cu.m.
Output per hour - As Submitted : 20.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 7
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 804 (1) a
Embankment, From roadway/structure excavation
Unit of Measurement : cu.m.
Output per hour - As Submitted : 9.84
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
#REF!
Page 8
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 804 (1) b
Embankment, From borrow
Unit of Measurement : cu.m.
Output per hour - As Submitted : 9.84
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
#REF!
Page 9
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 804 (4)
Gravel fill
Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.20
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 10
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 900 (1) c2
Structural Concrete (Footings and Slab on Fill), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!
Page 11
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 900 (1) c3
Structural Concrete (Footing Tie Beams), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!
Page 12
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 900 (1) c4
Structural Concrete (Columns), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!
Page 13
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 900 (1) c5
Structural Concrete (Suspended Slab), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!
Page 14
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 900 (1) c6
Structural Concrete (Beams/Girders), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 15
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 902 (1) a
Reinforcing Steel (Deformed), Grade 40
Unit of Measurement : kg.
Output per hour - As Submitted : 129.09
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 16
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 903 (2)
Formworks and Falseworks
Unit of Measurement : sq.m.
Output per hour - As Submitted : 4.50
Output per hour - As Evaluated :
Page 17
Materials
a. Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 0.35 1,336.00 92.72
F.2 b. Good Lumber bd.ft 4.73 55.00 86.66
c. Consumables (5% of Material Cost) 20.88
Sub- Total for F.2- As Evaluated 200.26
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 511.66
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 511.66
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 76.75
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 76.75
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 51.17
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 51.17
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 31.98
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 31.98
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 671.56
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 671.56
Prepared by: Checked/ Reviewed by:
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 18
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1000 (1)
Soil Poisoning
Unit of Measurement : Liter
Output per hour - As Submitted : 5.40
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 19
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1001 (8)
Sewer Line Works
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
Page 20
#REF! Construction Section
Page 21
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1001 (9)
Storm Drainage and Downspout
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 22
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1002 (4)
Plumbing Fixtures
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 23
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1002 (24)
Cold Water Lines
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 24
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1003 (1) a1
Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
Unit of Measurement : sq.m.
Output per hour - As Submitted : 1.49
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 25
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1004 (2)
Finishing Hardware
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 26
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1007 (1) a
Aluminum Framed Glass Door, Sliding Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 27
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1007 (1) b
Aluminum Framed Glass Door, Swing Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 28
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1008 (1) a
Aluminum Glass Windows, Sliding Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 29
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1008 (1) c
Aluminum Glass Windows, Awning Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 30
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1010 (1)
Frames, Jambs, Sills, Head, Transoms and Mullion
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 31
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1010 (2) a
Doors, Flush
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 32
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1013 (2) b1
Fabricated Metal Roofing Accessory, gauge 24, Gutters
Unit of Measurement : l.m.
Output per hour - As Submitted : 11.80
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 33
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1014 (1) b2
Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span
Unit of Measurement : sq.m.
Output per hour - As Submitted : 2.08
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 34
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1016 (1) a
Waterproofing, Cement-base
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.88
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 35
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1018 (1)
Glazed Tiles and Trims
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.37
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 36
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1018 (2)
Unglazed Tiles
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.95
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 37
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1027 (1)
Cement Plaster Finish
Unit of Measurement : sq.m
Output per hour - As Submitted : 7.13
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 38
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1032 (1) a
Painting Works, Masonry/Concrete
Unit of Measurement : sq.m
Output per hour - As Submitted : 2.10
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 39
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1046 (2) a1
CHB Non Load Bearing (including Reinforcing Steel), 100 mm
Unit of Measurement : sq.m
Output per hour - As Submitted : 3.83
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 40
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1046 (2) a2
CHB Non Load Bearing (including Reinforcing Steel), 150 mm
Unit of Measurement : sq.m
Output per hour - As Submitted : 3.18
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 41
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1047 (2) a
Structural Steel, Trusses
Unit of Measurement : kg
Output per hour - As Submitted : 85.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
Page 42
#REF! Construction Section
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1047 (6)
Metal Structure Accessories (Steel Plates)
Unit of Measurement : kgs.
Output per hour - As Submitted : 12.995
Output per hour - As Evaluated : .
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 43
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1051 (6)
Railing
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 44
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1100 (10)
Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in)
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 45
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1101 (33)
Wires and Wiring Devices
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 46
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1102 (1)
Panelboard with Main & Branch Breakers
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 47
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1103 (1)
Lighting Fixtures and Lamps
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 48
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1105 (20)
Network Cabling
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 49
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1109 (1)
Grounding System
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 50
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1111 (8)
2 Spool Insulator Wire Rack
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 51
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1202 (6) a1
Fire Extinguisher, 10 lbs, ABC with bracket
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 52
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM POW-2015-01D-00
Item No./ Description : 1208(1)
Fire Alarm System
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page 53
BACK-UP COMPUTATION
4th flr
B1 4.50 x 6 x 28 = 756.00 l.m. 16mmØ
B2 4.00 x 6 x 21 = 504.00 l.m. 16mmØ
B3 3.50 x 6 x 14 = 294.00 l.m. 16mmØ
B4 3.00 x 6 x 22 = 396.00 l.m. 16mmØ
4th flr
B1 28 x 27 x 1.72 = 1300.32 l.m. 12mmØ
B2 21 x 25 x 1.72 = 903.00 l.m. 12mmØ
B3 14 x 24 x 1.72 = 577.92 l.m. 12mmØ
B4 22 x 22 x 1.72 = 832.48 l.m. 12mmØ
wt factor: Weight
32 mm Ø l.m. 6.310 0.00 kgs
25 mm Ø l.m. 3.853 0.00 kgs
20 mm Ø 8437.80 l.m. 2.469 20832.93 kgs
16 mm Ø 8426.00 l.m. 1.580 13313.08 kgs
12 mm Ø 59766.58 l.m. 0.888 53072.72 kgs
10 mm Ø 6321.38 l.m. 0.617 3900.29 kgs
kgs
Total: 91119.02 kgs
4th flr
B1 4.5 x 0.3 x 0.4 x 28 = 104.16
B2 4 x 0.3 x 0.4 x 21 = 69.72
B3 3.5 x 0.3 x 0.4 x 14 = 40.88
B4 3 x 0.3 x 0.4 x 22 = 55.44
Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board 520.00 sq.m.
Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span 572 sq.m.
572
4768.3884
CHB Non Load Bearing (including Reinforcing Steel), 100 mm 1301.52 sq.m.
length height Qty
GF area 4.5 3 11 148.5 sq.m.
3.5 3 12 126 sq.m.
4 3 8 96 sq.m.
3 3 12 108 sq.m.
2.25 3 4 27 sq.m.
1467
CHB Non Load Bearing (including Reinforcing Steel), 150 mm 922.16 sq.m.
length height Qty
GF perimeter 92 3 1 276 sq.m.
2f, 3rd & 4th sq.m.
perimeter 92 3 3 828
1104
-
length height Qty
D1 2 2.5 10 50 sq.m.
D2 0.9 2.1 6 11.34 sq.m.
D3 1 2.2 3 6.6 sq.m.
D4 2 2.2 2 8.8 sq.m.
D5 0.9 2.2 16 31.68 sq.m.
D6 1.1 2.2 4 9.68 sq.m.
D7 0.8 2 16 25.6 sq.m.
D8 1 2.2 16 35.2 sq.m.
D9 1.8 2.2 2 7.92 sq.m.
W1 1.92 0.48 8 7.3728 sq.m.
W2 0.6 0.48 5 1.44 sq.m.
W3 1 2 4 8 sq.m.
W4 3.78 1 4 15.12 sq.m.
W5 3 2.5 3 22.5 sq.m.
W6 2 0.63 2 2.52 sq.m.
W7 2 1 7 14 sq.m.
W8 2.5 15.85 1 39.625 sq.m.
W9 3.5 2.5 2 17.5 sq.m.
W10 1.1 0.55 4 2.42 sq.m.
W11 1 2.5 4 10 sq.m.
W12 2.5 2 3 15 sq.m.
W13 1.25 1 4 5 sq.m.
347.3178
1100 (10) Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in) Lump Sum
1101 (33) Wires and Wiring Devices Lump Sum
1102 (1) Panelboard with Main & Branch Breakers Lump Sum
1103 (1) Lighting Fixtures and Lamps Lump Sum
Prepared by:
PRINCESS M. MURIA
Engineer II
PROJECT TITLE
Item No./ Description : Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
Unit of Measurement : sq.m.
Output per hour : 1.49
Item No./ Description : Fabricated Metal Roofing Accessory, gauge 24, Gutters
Unit of Measurement : l.m.
Output per hour : 11.80
Item No./ Description : Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span
Unit of Measurement : sq.m.
Output per hour : 2.08
Item No./ Description : CHB Non Load Bearing (including Reinforcing Steel), 100 mm
Unit of Measurement : sq.m
Output per hour : 3.83
Item No./ Description : CHB Non Load Bearing (including Reinforcing Steel), 150 mm
Unit of Measurement : sq.m
Output per hour : 3.18
Item No./ Description : Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in)
Unit of Measurement : Lump Sum
Output per hour : 1.00
Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Equipment Operator 2 ₱ 795.05 ₱ 1,590.10
Sub-total P 1,590.10
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Self Loading Truck & Accessories
Miscellaneous Handtools ₱ 80,000.00
Sub-total P 80,000.00
D. ESTIMATED DIRECT COST (TOTAL) P 81,590.10
E. MARK-UPS P -
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 0% of EDC -
2. Contractor's Profit, 0% of EDC -
Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 1 3.000 ₱ 688.18 ₱ 4,829.84
Heavy Equipment Operator 1 1.000 ₱ 795.05 ₱ 2,700.86
Sub-total P 7530.71
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Backhoe 1.00 1 ₱ 16,768.00 ₱ 16,768.00
Dumptruck 1.00 1 ₱ 11,360.00 ₱ 11,360.00
Minor Tools (10% of Labor Cost) ₱ 753.07
Sub-total P 28,881.07
D. ESTIMATED DIRECT COST (TOTAL) P 36,411.78
E. MARK-UPS P 9,102.94
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 5,461.77
2. Contractor's Profit, 10% of EDC 3,641.18
E. MARK-UPS P 10,003.82
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 6,002.29
2. Contractor's Profit, 10% of EDC 4,001.53
E. MARK-UPS P 86,517.62
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 51,910.57
2. Contractor's Profit, 10% of EDC 34,607.05
Sub-total P 72,524.80
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
E. MARK-UPS P 24,216.89
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 14,530.13
2. Contractor's Profit, 10% of EDC 9,686.75
Sub-total P 4,129.08
DAYS NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Welding Machine 2.00 1 2,968.00 5,936.00
Cutting Outfit 2.00 1 363.60 727.20
Truck Mounted Crane 2.00 1 13,048.00 26,096.00
Minor Tools (10% of Labor Cost) 412.91 412.91
Sub-total P 33,172.11
D. ESTIMATED DIRECT COST (TOTAL) P 235,326.71
E. MARK-UPS P 58,831.68
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 35,299.01
2. Contractor's Profit, 10% of EDC 23,532.67
Sub-total P -
D. ESTIMATED DIRECT COST (TOTAL) P 17,600.00
E. MARK-UPS P 4,400.00
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 15% of EDC 2,640.00
2. Contractor's Profit, 10% of EDC 1,760.00