BIDDER : DATE
INQUIRY NO. : PROJECT :
WORK TITLE : JOB. NO. :
COST SUMMARY
(WORK ITEM WISE)
COST
WORK ITEMS TOTAL PRICE (Rp)
CODE
1. PREPARATORY WORK
1.1 Mobilization and demobilization
1.2 Temporary facility
1.3 Utility facility
SUB TOTAL PREPARATORY WORK
GRAND TOTAL
DOC. NO. : FORM NO. : 2B
BIDDER : DATE :
INQUIRY NO. : PROJECT :
WORK TITLE : 0 JOB. NO. :
COST BREAKDOWN
(WORK ITEM WISE)
1 PREPARATORY WORK
1.1 Mobilization and demobilization Ls 1
1.2 Temporary facility Ls 1
1.3 Utility facility Ls 1
2.2 Installation Valve (Manual Valve and Control Valve) and Strainer
- 3" and smaller Ea REKIND
- 4" - 10" Ea REKIND
- 12" - 22" Ea REKIND
- 24" - 32" Ea REKIND
- 34" and larger Ea REKIND
2.4 Fabrication & Installation of Firefighting & Safety Facilities Deluge System REK
(Install deluge valve and sprinkle system)
GRAND TOTAL
Note :
1 RT by REKIND
2. Excavation and Backfill by REKIND
DOC. NO. : FORM NO. : 3A
BIDDER : DATE :
INQUIRY NO. : PROJECT :
WORK TITLE : 0 JOB. NO. :
COST SUMMARY
(COST ITEM WISE)
1 Direct cost
1.1 Direct material
1.2 Direct labor
1.3 Direct construction equipment
2 Indirect cost
2.1 Home office cost
2.2 Mobilization and demobilization
2.3 Temporary facilities
2.4 Salaries, wages, allowance
2.5 Field expenses
2.6 Maintenance cost for equipment
2.7 Small construction supplies
2.8 Transportation cost
2.9 Insurance
2.10 Direct labor service cost
2.11 Pre financing cost
GRAND TOTAL
ROUNDED