HARSAT. JUMLAH
NO. SAT. VOL.
(Rp.) (Rp.)
I PEKERJAAN SIPIL
I.1 Pekerjaan PATOK
1 Beton K.175 m3 0.02 1,275,000.00 19,584.00
2 Besi Tulangan dia. 8 kg 1.94 15,000.00 29,100.00
3 Biaya galian m3 0.02 150,000.00 2,250.00
SUB-TOTAL PEKERJAAN SIPIL (II) 50,934.00