You are on page 1of 1

MEASUREMENT SHEET

DESCRIPTION OF WORK :- CONSTRUCTION OF BOUNDARY WALL / FENCING AT CBUS PROJECT TIPLING, DULIJAN, ASSAM.

SL. NO. DESCRIPTION OF WORK UNIT NO. LENGTH BREADTH HEIGHT QUANTITY REMARKS
(M) (M) (M)

1 PLASTER WORK AT NORTH SIDE BW SQM 40 2.70 0.00 2.925 315.900

SQM 1 3.225 0.00 2.925 9.433

Total = 325.333

2 PCC below Footing foundation

PCC below Plinth Beam

3 RCC for Footnig Foundation

RCC for Column below Plinth Beam (North Side B/Wall)

RCC for Column below Plinth Beam (West Side B/Wall)

RCC for Column upto Plinth Beam

RCC for Plinth Beam

Total = 0.000

4 Reinforcement in Steel Kg 3718.578

Total = 3718.578