IMB 2011 503.3/647/5044/TMB-BPPT/2011 lt 1 lt 2 lt 3 lt 4 posisi gambar
R. Produksi lt 1 1,418.17 1,418.17 kantor lt 2 1,418.70 1,418.70 lantai 3 1,289.20 1,289.20 factory lt A1 2,652.00 2,652.00 jalan dan perkerasan 12,935.00 12,935.00 pagar 1,286.00 1,286.00 drainase 1,800.00 1,800.00
imb 2012 503.3/647/5289/TMB-BPPT/2012
bangunan pabrik A1. Lt2 1,167.00 1,167.00 bangunan pabrik A2. Lt. 1 & Lt.2 2,967.00 1,483.50 1,483.50 Bangunan Restoran 1,157.00 1,157.00 Office lt 1 & 2 4,480.00 2,240.00 2,240.00 Rest area 2,843.00 1,421.50 1,421.50 sub power station 180.00 180.00 Guard ofice & rest area 200.00 200.00 Costoms office & rest area 167.00 167.00 mushola dan toilet 535.00 535.00 imb 2013 503.3/647/4586/TMB-BPPT/2013 Bangunan storage 1,584.00 Ruang Produksi 2,151.00 Boiler 120.00 imb 2015 503.3/647/518/PMB-BPMPT/2015 T Ruang Produksi LT 1 (site 1) LT 1 5,372.00 5,372.00 T Ruang Produksi LT 2 (site 1) LT 2 5,372.00 5,372.00 Ruang produksi Lt 1 (site 2) LT1 5,811.50 5,811.50 Ruang produksi Lt 2 (site 2) LT2 5,811.50 5,811.50 sludge storege area 136.00 136.00
imb 2018 503.3/647/4419/TMB-DPMPTSP/2018
Boiler (A9) 612.00 612.00 Factory Coridor building CD (A10) 1,509.00 1,509.00 Rest area / mess (A11) Lt3 798.00 798.00 public area / area parkir (A12) 450.00 450.00 Boiler area (A13) 2,209.00 2,209.00 Chemical warehouse (A14) 1,521.00 1,521.00
imb 2019 503.3/647/4918/TMB-DPMPTSP/2019
R Produksi Bb > 5m (lt1) 6,537.70 6,537.70 teras lt 1 bb>5m 917.60 917.60 R Utility 50.00 50.00 R Produksi Bb > 5m (lt1 ) 6,537.90 6,537.90 teras lt II bb>5m 917.60 917.60 R Produksi Bb > 5m (lt2 ) 6,537.90 6,537.90 water purification Bb>5m 558.75 558.75 Public fasility Additional 1,336.00 1,336.00
Pbg 2022 503.3/644.4/2389/TMB-DPMPTSP/2022
Area bagunan WSG Area komersil LT 1 5,880.00 5,880.00 Area produksi lt 2 5,880.00 5,880.00 Area produksi lt 3 5,880.00 5,880.00 Area produksi lt 4 5,880.00 5,880.00 Area bangunan WSF Area komersil LT 1 1,920.00 1,920.00 Area produksi lt 2 1,920.00 1,920.00 Area produksi lt 3 1,920.00 1,920.00 pbg 2022 503.3/644.4/3272/TMB-DPMPTSP/2022 kantor lanatai 3 dan fasilitasnya 1,900.00 1,900.00
Total 124,525.52 68,833.62 34,169.70 11,787.20 5,880.00
total luas tanah 105,000.00 percentase 66% 33% 11% 6% area terbuka hijau 100% 34%