BIODIESEL
MECHANICAL & ELECTRICAL OSBL
to the
for
PT. SMART
FINAL SUMMARY
BILL NO. 5 - MECHANICAL BUILDING BIODIESEL 0.037% 42,251,400 Terlampir Break Down
BILL NO. 6 - ELECTRICAL BUILDING BIODIESEL 0.001% 898,000 Terlampir Break Down
By,
KETIRA ENGINEERING CONSULTANTS
Erianto
BOBOT KERJA KURANG BY
Item BILL NO. 2.2 BILL NO. 2.2.A Quantity Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG
CONSULTAN
Unit Kerja On On Keterangan
No. TANK FARM-2 (T2) MECHANICAL WORKS Bidder Terinstal Sisa Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
Kurang Warehouse Warehouse
I Test Connection Valve No 1 1 0 1 0 100.00% 0.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan
Fitting
L Tee; 150 x 65 mm diameter No 16 16 0 16 0 100.00% 0.00% 0.00% 100.00% 0.013% 0.003% 0.016% 0.013% 0.003% 0.016% 0.000% 0.003% 0.003% Tidak diadakan
E Ditto; 50 mm diameter (drain line) m 5 5 0 0 5 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.002% 0.001% 0.000% 0.002% 0.001% 0.000% 0.002% Tidak diadakan
Fitting
H Tee; 200 x 50 mm diameter No 1 1 0 1 0 100.00% 0.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak diadakan
Supply and Install power cables run in and with high impact conduit including
all neccessary accessories accordance with the Technical Specification and
drawings, as described :-
TANK 4
AD Air Conditiner unit 7 7 7 0.079% 0.011% 0.089% 0.000% 0.000% 0.000% Tidak dikerjakan
Type Split, 2 PK; Daikin Terinstal Di polishing
A Pipework; 80 mm diameter m 619 300 0.214% 0.050% 0.264% 0.000% 0.000% 0.000% upah by ASL
Asl Claim To PBS
Fitting
C Elbow 90°; 80 mm diameter No 11 8 0.002% 0.001% 0.003% 0.000% 0.000% 0.000% upah by ASL
Asl Claim To PBS
F End Flange; 80 mm diameter No 3 3 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% upah by ASL
Asl Claim To PBS
Item BILL NO. 3.6 3.6.A.2 - FIRE FIGHTING SYSTEM Unit
No. EXTERNAL
F Ditto; 200 mm diameter m 576 78 1.132% 0.123% 1.255% 0.000% 0.000% 0.000% 13 btg materialunit
Material sudah
Fitting dikemablikan ke samrt
Q Ditto; 200 x 100 mm diameter No 7 7 0.005% 0.002% 0.006% 0.005% 0.002% 0.006% Tidak diadakan
T Ditto; 250 x 100 mm diameter No 1 1 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% Tidak diadakan
RBDPO
I Ditto; 100 mm diameter m 166 17.4 148.6 148.6 17.4 0 17.4 89.52% 10.48% 89.52% 10.48% 0.176% 0.019% 0.195% 0.018% 0.002% 0.020% 0.018% 0.002% 0.020% Kerja Kurang vs OSBL 2
J Ditto; 125 mm diameter m 101 11.4 89.6 89.6 11.4 0 11.4 88.71% 11.29% 88.71% 11.29% 0.119% 0.015% 0.134% 0.013% 0.002% 0.015% 0.013% 0.002% 0.015% Kerja Kurang vs OSBL 2
K Ditto; 150 mm diameter m 1662 832 830 903.5 758.5 0 758.5 54.36% 45.64% 54.36% 45.64% 2.400% 0.289% 2.688% 1.201% 0.145% 1.346% 1.095% 0.132% 1.227% Kerja Kurang vs OSBL 2
X Ditto; 20 mm diameter m 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Z Ditto; 50 mm diameter m 100 15 85 90 10 0 10 90.00% 10.00% 90.00% 10.00% 0.060% 0.006% 0.065% 0.009% 0.001% 0.010% 0.006% 0.001% 0.007% Kerja Kurang vs OSBL 2
AA Ditto; 80 mm diameter m 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Kerja Kurang vs OSBL 2
AB Ditto; 100 mm diameter m 906.6 350.8 555.8 864 42.6 0 42.6 95.30% 4.70% 95.30% 4.70% 0.959% 0.105% 1.064% 0.371% 0.041% 0.412% 0.045% 0.005% 0.050% Kerja Kurang vs OSBL 2
AC Ditto; 125 mm diameter m 538.4 335.3 203.1 203.1 335.3 0 335.3 37.72% 62.28% 37.72% 62.28% 0.637% 0.078% 0.715% 0.397% 0.049% 0.445% 0.397% 0.049% 0.445% Kerja Kurang vs OSBL 2
FAME
A Pipework; 150 mm diameter m 117 100 17 116 1 0 1 99.15% 0.85% 99.15% 0.85% 0.169% 0.020% 0.189% 0.144% 0.017% 0.162% 0.001% 0.000% 0.002% Kerja Kurang vs OSBL 2
B Ditto; 200 mm diameter m 1660 31.9 1628.1 1628.1 31.9 0 31.9 98.08% 1.92% 98.08% 1.92% 3.454% 0.384% 3.839% 0.066% 0.007% 0.074% 0.066% 0.007% 0.074% Kerja Kurang vs OSBL 2
C Ditto; 250 mm diameter m 184.8 25.5 159.3 184.8 0 0 0 100.00% 0.00% 100.00% 0.00% 0.516% 0.053% 0.569% 0.071% 0.007% 0.079% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Fitting
D Elbow 45°; 100 mm diameter No 21 14 7 15 6 1 5 76.19% 23.81% 71.43% 28.57% 0.008% 0.005% 0.013% 0.006% 0.003% 0.009% 0.002% 0.001% 0.003% Kerja Kurang vs OSBL 2
E Ditto; 150 mm diameter No 19 7 12 14 5 0 5 73.68% 26.32% 73.68% 26.32% 0.011% 0.007% 0.018% 0.004% 0.002% 0.006% 0.003% 0.002% 0.005% Kerja Kurang vs OSBL 2
F Ditto; 200 mm diameter No 19 13 6 6 13 5 8 57.89% 42.11% 31.58% 68.42% 0.018% 0.009% 0.027% 0.012% 0.006% 0.019% 0.008% 0.006% 0.014% Kerja Kurang vs OSBL 2
G Ditto; 200 mm diameter, piggable (pipe bending) No 16 12 4 4 12 0 12 25.00% 75.00% 25.00% 75.00% 0.015% 0.007% 0.023% 0.012% 0.006% 0.017% 0.012% 0.006% 0.017% Kerja Kurang vs OSBL 2
I Ditto; 80 mm diameter No 3 3 0 0 3 3 0 100.00% 0.00% 0.00% 100.00% 0.001% 0.001% 0.002% 0.001% 0.001% 0.002% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
J Ditto; 100 mm diameter No 205 104 101 173 32 32 0 100.00% 0.00% 84.39% 15.61% 0.087% 0.047% 0.135% 0.044% 0.024% 0.068% 0.000% 0.007% 0.007% Kerja Kurang vs OSBL 2
K Ditto; 125 mm diameter No 43 4 39 39 4 0 4 90.70% 9.30% 90.70% 9.30% 0.023% 0.012% 0.035% 0.002% 0.001% 0.003% 0.002% 0.001% 0.003% Kerja Kurang vs OSBL 2
L Ditto; 150 mm diameter No 96 45 51 78 18 13 5 94.79% 5.21% 81.25% 18.75% 0.064% 0.033% 0.098% 0.030% 0.016% 0.046% 0.003% 0.006% 0.010% Kerja Kurang vs OSBL 2
M Ditto; 200 mm diameter No 60 9 51 51 9 7 2 96.67% 3.33% 85.00% 15.00% 0.069% 0.028% 0.097% 0.010% 0.004% 0.015% 0.002% 0.004% 0.006% Kerja Kurang vs OSBL 2
T Ditto; 100 x 100 mm diameter No 27 20 7 27 0 0 0 100.00% 0.00% 100.00% 0.00% 0.009% 0.009% 0.018% 0.006% 0.007% 0.013% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
W Ditto; 150 x 100 mm diameter No 7 2 5 6 1 1 0 100.00% 0.00% 85.71% 14.29% 0.004% 0.003% 0.007% 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
X Ditto; 150 x 150 mm diameter No 10 2 8 9 1 1 0 100.00% 0.00% 90.00% 10.00% 0.005% 0.005% 0.011% 0.001% 0.001% 0.002% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
Y Ditto; 200 x 100 mm diameter No 17 12 5 5 12 11 1 94.12% 5.88% 29.41% 70.59% 0.016% 0.010% 0.025% 0.011% 0.007% 0.018% 0.001% 0.007% 0.008% Kerja Kurang vs OSBL 2
Z Ditto; 200 x 200 mm diameter No 23 5 18 18 5 5 0 100.00% 0.00% 78.26% 21.74% 0.020% 0.016% 0.036% 0.004% 0.003% 0.008% 0.000% 0.003% 0.003% Kerja Kurang vs OSBL 2
AB Ditto; 250 x 250 mm diameter No 2 1 1 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.003% 0.002% 0.004% 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Item BILL NO. 4.2 SUMMARY Qty By Consultant Data Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG BY CONTS BOBOT KERJA KURANG DATA
Unit Keterangan
On On
Bidder Kerja Kurang Terinstal Terinstal Selisih Selisih Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
No. PIPING Warehouse Warehouse
AD Reducer (Conc); 100 x 80 mm diameter No 7 4 3 7 0 0 0 100.00% 0.00% 100.00% 0.00% 0.002% 0.001% 0.003% 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AE Ditto; 125 x 100 mm diameter No 5 5 0 5 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.001% 0.003% 0.001% 0.001% 0.003% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AF Ditto; 150 x 100 mm diameter No 4 4 0 2 2 2 0 100.00% 0.00% 50.00% 50.00% 0.001% 0.001% 0.002% 0.001% 0.001% 0.002% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
Fitting (cont'd)
A Reducer (Ecc); 100 x 80 mm diameter No 4 2 2 4 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.001% 0.002% 0.000% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
B Ditto; 150 x 100 mm diameter No 5 2 3 4 1 1 0 100.00% 0.00% 80.00% 20.00% 0.002% 0.001% 0.003% 0.001% 0.001% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
D Ditto; 200 x 150 mm diameter No 2 1 1 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.001% 0.002% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
G Ditto; 80 mm diameter Blind Flange No 6 6 0 3 3 3 0 100.00% 0.00% 50.00% 50.00% 0.004% 0.001% 0.004% 0.004% 0.001% 0.004% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
H Ditto; 100 mm diameter No 2 2 0 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.000% 0.002% 0.001% 0.000% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
J Ditto; 150 mm diameter No 5 1 4 4 1 1 0 100.00% 0.00% 80.00% 20.00% 0.005% 0.001% 0.006% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
L Ditto; 250 mm diameter No 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% Kerja Kurang vs OSBL 2
N Ditto; 80 mm diameter Flange No 13 6 7 13 0 0 0 100.00% 0.00% 100.00% 0.00% 0.008% 0.002% 0.010% 0.004% 0.001% 0.005% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
O Ditto; 100 mm diameter No 118 45 73 118 0 0 0 100.00% 0.00% 100.00% 0.00% 0.088% 0.027% 0.115% 0.033% 0.010% 0.044% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Q Ditto; 150 mm diameter No 72 35 37 72 0 0 0 100.00% 0.00% 100.00% 0.00% 0.071% 0.025% 0.096% 0.034% 0.012% 0.046% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
R Ditto; 200 mm diameter No 89 27 62 76 13 13 0 100.00% 0.00% 85.39% 14.61% 0.130% 0.041% 0.171% 0.040% 0.013% 0.052% 0.000% 0.006% 0.006% Kerja Kurang vs OSBL 2
S Ditto; 250 mm diameter No 16 6 10 16 0 0 0 100.00% 0.00% 100.00% 0.00% 0.029% 0.009% 0.038% 0.011% 0.003% 0.014% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
U Ditto; 80 mm diameter Gate Valve No 7 7 0 3 4 4 0 100.00% 0.00% 42.86% 57.14% 0.039% 0.001% 0.040% 0.039% 0.001% 0.040% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
W Ditto; 125 mm diameter No 5 1 4 4 1 0 1 80.00% 20.00% 80.00% 20.00% 0.060% 0.002% 0.061% 0.012% 0.000% 0.012% 0.012% 0.000% 0.012% Kerja Kurang vs OSBL 2
W Ditto; 150 mm diameter No 12 1 11 11 1 1 0 100.00% 0.00% 91.67% 8.33% 0.143% 0.004% 0.147% 0.012% 0.000% 0.012% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
X Ditto; 200 mm diameter No 55 31 24 24 31 28 3 94.55% 5.45% 43.64% 56.36% 0.995% 0.025% 1.021% 0.561% 0.014% 0.575% 0.054% 0.014% 0.069% Kerja Kurang vs OSBL 2
Y Ditto; 250 mm diameter No 7 2 5 5 2 0 2 71.43% 28.57% 71.43% 28.57% 0.194% 0.004% 0.198% 0.055% 0.001% 0.057% 0.055% 0.001% 0.057% Kerja Kurang vs OSBL 2
Z Ball Valve (Reduced Bore); 15 mm diameter No 32 2 30 30 2 2 0 100.00% 0.00% 93.75% 6.25% 0.036% 0.001% 0.037% 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AA Ditto; 20 mm diameter No 2 2 0 0 2 2 0 100.00% 0.00% 0.00% 100.00% 0.003% 0.000% 0.003% 0.003% 0.000% 0.003% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AC Ditto; 50 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.002% 0.000% 0.003% 0.002% 0.000% 0.003% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AD Ditto; 100 mm diameter No 18 18 0 18 0 0 0 100.00% 0.00% 100.00% 0.00% 0.096% 0.004% 0.101% 0.096% 0.004% 0.101% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AE Ditto; 125 mm diameter No 2 2 0 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.017% 0.001% 0.018% 0.017% 0.001% 0.018% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Item BILL NO. 4.2 SUMMARY Qty By Consultant Data Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG BY CONTS BOBOT KERJA KURANG DATA
Unit Keterangan
On On
Bidder Kerja Kurang Terinstal Terinstal Selisih Selisih Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
No. PIPING Warehouse Warehouse
A Ball Valve; 150 mm diameter No 9 8 1 9 0 0 0 100.00% 0.00% 100.00% 0.00% 0.104% 0.003% 0.107% 0.092% 0.003% 0.095% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
B Ditto; 200 mm diameter No 4 4 0 4 0 0 0 100.00% 0.00% 100.00% 0.00% 0.073% 0.002% 0.075% 0.073% 0.002% 0.075% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
E Swing Check Valve; 100 mm diameter No 16 6 10 16 0 0 0 100.00% 0.00% 100.00% 0.00% 0.106% 0.004% 0.109% 0.040% 0.001% 0.041% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
F Ditto; 125 mm diameter No 6 1 5 6 0 0 0 100.00% 0.00% 100.00% 0.00% 0.052% 0.002% 0.054% 0.009% 0.000% 0.009% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
H Ditto; 200 mm diameter No 2 2 0 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.040% 0.001% 0.041% 0.040% 0.001% 0.041% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Y Strainer; 200 mm diameter No 1 1 0 0 1 1 0 100.00% 0.00% 0.00% 100.00% 0.025% 0.000% 0.025% 0.025% 0.000% 0.025% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
L Hose Connection; 25 mm diameter No 7 1 6 7 0 0 0 100.00% 0.00% 100.00% 0.00% 0.006% 0.000% 0.006% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
M Bag Filter; 150 mm diameter No 4 4 0 2 2 0 2 50.00% 50.00% 50.00% 50.00% 0.131% 0.012% 0.142% 0.131% 0.012% 0.142% 0.065% 0.006% 0.071% Kerja Kurang vs OSBL 2
Item BILL NO. 4.2 4.2.A - PROCESS PIPING Unit Qty
No. PIPING
Supply and Install process and product pipeworks; Stainless steel pipe (cont'd)
CRUDE GLYCERIN (cont'd)
A Pipework; 100 mm diameter m 636 492 144 566 70 0 70 88.99% 11.01% 88.99% 11.01% 0.953% 0.147% 1.100% 0.737% 0.114% 0.851% 0.105% 0.016% 0.121% Kerja Kurang vs OSBL 2
B Ditto; 150 mm diameter m 171.8 165.8 6 48 123.8 0 123.8 27.94% 72.06% 27.94% 72.06% 0.392% 0.060% 0.452% 0.379% 0.058% 0.436% 0.283% 0.043% 0.326% Kerja Kurang vs OSBL 2
Fitting
G Ditto; 150 mm diameter, piggable (pipe bending) No 19 19 0 0 19 0 19 0.00% 100.00% 0.00% 100.00% 0.030% 0.013% 0.043% 0.030% 0.013% 0.043% 0.030% 0.013% 0.043% Kerja Kurang vs OSBL 2
H Elbow 90°; 65 mm diameter No 73 12 61 61 12 12 0 100.00% 0.00% 83.56% 16.44% 0.043% 0.021% 0.064% 0.007% 0.003% 0.011% 0.000% 0.003% 0.003% Kerja Kurang vs OSBL 2
I Ditto; 80 mm diameter No 16 4 12 12 4 4 0 100.00% 0.00% 75.00% 25.00% 0.012% 0.006% 0.018% 0.003% 0.001% 0.004% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
J Ditto; 100 mm diameter No 60 19 41 60 0 0 0 100.00% 0.00% 100.00% 0.00% 0.070% 0.028% 0.098% 0.022% 0.009% 0.031% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
K Ditto; 150 mm diameter No 5 5 0 5 0 0 0 100.00% 0.00% 100.00% 0.00% 0.012% 0.003% 0.016% 0.012% 0.003% 0.016% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Ditto; 150 mm diameter No 4 4 0 0 4 4 0 100.00% 0.00% 0.00% 100.00% 0.010% 0.003% 0.013% 0.010% 0.003% 0.013% 0.000% 0.003% 0.003% Kerja Kurang vs OSBL 2
L Ditto; 150 mm diameter, piggable (pipe bending) No 17 17 0 0 17 17 0 100.00% 0.00% 0.00% 100.00% 0.042% 0.012% 0.054% 0.042% 0.012% 0.054% 0.000% 0.012% 0.012% Kerja Kurang vs OSBL 2
M Tee; 65 x 65 mm diameter No 9 3 6 6 3 2 1 88.89% 11.11% 66.67% 33.33% 0.005% 0.004% 0.009% 0.002% 0.001% 0.003% 0.001% 0.001% 0.002% Kerja Kurang vs OSBL 2
M Ditto; 50 x 40 mm diameter No 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Kerja Kurang vs OSBL 2
P Ditto; 100 x 100 mm diameter No 6 1 5 6 0 0 0 100.00% 0.00% 100.00% 0.00% 0.007% 0.004% 0.011% 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Q Ditto; 150 x 100 mm diameter No 3 3 0 3 0 0 0 100.00% 0.00% 100.00% 0.00% 0.008% 0.003% 0.011% 0.008% 0.003% 0.011% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
R Ditto; 150 x 150 mm diameter No 4 4 0 4 0 0 0 100.00% 0.00% 100.00% 0.00% 0.010% 0.004% 0.014% 0.010% 0.004% 0.014% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
T Reducer (Conc); 100 x 80 mm diameter No 2 2 0 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.001% 0.002% 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
U Ditto; 150 x 100 mm diameter No 2 2 0 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.002% 0.001% 0.003% 0.002% 0.001% 0.003% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
W Ditto; 80 x 65 mm diameter No 2 2 0 2 0 0 0 100.00% 0.00% 100.00% 0.00% 0.003% 0.001% 0.004% 0.003% 0.001% 0.004% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
X Ditto; 150 x 100 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.001% 0.002% 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Y Blind Flange; 65 mm diameter No 4 1 3 3 1 1 0 100.00% 0.00% 75.00% 25.00% 0.005% 0.001% 0.005% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Z Ditto; 80 mm diameter No 4 4 0 3 1 1 0 100.00% 0.00% 75.00% 25.00% 0.006% 0.001% 0.007% 0.006% 0.001% 0.007% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AB Ditto; 150 mm diameter No 10 10 0 3 7 0 7 30.00% 70.00% 30.00% 70.00% 0.032% 0.003% 0.035% 0.032% 0.003% 0.035% 0.022% 0.002% 0.025% Kerja Kurang vs OSBL 2
Ditto; 200 mm diameter No 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.004% 0.000% 0.005% 0.004% 0.000% 0.005% 0.004% 0.000% 0.005% Kerja Kurang vs OSBL 2
AC Flange; 65 mm diameter No 40 11 29 29 11 0 11 72.50% 27.50% 72.50% 27.50% 0.038% 0.012% 0.050% 0.010% 0.003% 0.014% 0.010% 0.003% 0.014% Kerja Kurang vs OSBL 2
Item BILL NO. 4.2 SUMMARY Qty By Consultant Data Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG BY CONTS BOBOT KERJA KURANG DATA
Unit Keterangan
On On
Bidder Kerja Kurang Terinstal Terinstal Selisih Selisih Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
No. PIPING Warehouse Warehouse
AD Ditto; 80 mm diameter No 21 1 20 20 1 1 0 100.00% 0.00% 95.24% 4.76% 0.024% 0.007% 0.031% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AE Ditto; 100 mm diameter No 26 9 17 26 0 0 0 100.00% 0.00% 100.00% 0.00% 0.040% 0.012% 0.052% 0.014% 0.004% 0.018% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
AF Ditto; 150 mm diameter No 16 14 2 16 0 0 0 100.00% 0.00% 100.00% 0.00% 0.036% 0.011% 0.047% 0.032% 0.010% 0.041% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Supply and Install process and product pipeworks; Stainless steel pipe (cont'd)
Valve and Accessories
A Gate Valve OS&Y; 50 mm diameter No 7 4 3 3 4 4 0 100.00% 0.00% 42.86% 57.14% 0.061% 0.002% 0.063% 0.035% 0.001% 0.036% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
B Ditto; 80 mm diameter No 6 6 0 3 3 3 0 100.00% 0.00% 50.00% 50.00% 0.076% 0.002% 0.078% 0.076% 0.002% 0.078% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
D Gate Valve OS&Y; 15 mm diameter No 17 5 12 12 5 5 0 100.00% 0.00% 70.59% 29.41% 0.046% 0.001% 0.047% 0.014% 0.000% 0.014% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
E Ditto; 20 mm diameter No 2 2 0 0 2 2 0 100.00% 0.00% 0.00% 100.00% 0.006% 0.000% 0.007% 0.006% 0.000% 0.007% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
F Ditto; 25 mm diameter No 19 17 2 2 17 17 0 100.00% 0.00% 10.53% 89.47% 0.070% 0.002% 0.072% 0.063% 0.002% 0.064% 0.000% 0.002% 0.002% Kerja Kurang vs OSBL 2
G Ditto; 50 mm diameter No 15 11 4 4 11 8 3 80.00% 20.00% 26.67% 73.33% 0.132% 0.003% 0.135% 0.097% 0.003% 0.099% 0.026% 0.003% 0.029% Kerja Kurang vs OSBL 2
J Ditto; 100 mm diameter No 7 3 4 4 3 0 3 57.14% 42.86% 57.14% 42.86% 0.113% 0.003% 0.117% 0.049% 0.001% 0.050% 0.049% 0.001% 0.050% Kerja Kurang vs OSBL 2
L Ball Valve (Full Bore); 150 mm diameter No 2 2 0 0 2 2 0 100.00% 0.00% 0.00% 100.00% 0.042% 0.001% 0.044% 0.042% 0.001% 0.044% 0.000% 0.001% 0.001% Kerja Kurang vs OSBL 2
M Swing Check Valve; 50 mm diameter No 8 3 5 8 0 0 0 100.00% 0.00% 100.00% 0.00% 0.042% 0.002% 0.044% 0.016% 0.001% 0.016% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
O Ditto; 100 mm diameter No 5 2 3 5 0 0 0 100.00% 0.00% 100.00% 0.00% 0.062% 0.002% 0.064% 0.025% 0.001% 0.026% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
P Ditto; 150 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.022% 0.001% 0.023% 0.022% 0.001% 0.023% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Ditto; 200 mm diameter No 1
Q Basket Strainer; 50 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.017% 0.000% 0.017% 0.017% 0.000% 0.017% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
S Ditto; 150 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.044% 0.001% 0.045% 0.044% 0.001% 0.045% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
T Hose Connection; 25 mm diameter No 5 3 2 5 0 0 0 100.00% 0.00% 100.00% 0.00% 0.004% 0.001% 0.005% 0.002% 0.000% 0.003% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
U Ditto; 100 mm diameter No 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% Kerja Kurang vs OSBL 2
V Sight Glass; 25 mm diameter No 6 6 0 6 0 0 0 100.00% 0.00% 100.00% 0.00% 0.047% 0.001% 0.048% 0.047% 0.001% 0.048% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
CRUDE GLYCERIN
Fitting
Ditto; 250 mm diameter No 6 6 0 0 6 0 6 0.00% 100.00% 0.00% 100.00% 0.025% 0.007% 0.032% 0.025% 0.007% 0.032% 0.025% 0.007% 0.032% Kerja Kurang vs OSBL 2
Ditto; 250 mm diameter No 1 1 0 0 1 0 1 0.00% 100.00% 0.00% 100.00% 0.003% 0.001% 0.004% 0.003% 0.001% 0.004% 0.003% 0.001% 0.004% Kerja Kurang vs OSBL 2
Ditto; 250 mm diameter No 6 3 3 3 3 0 3 50.00% 50.00% 50.00% 50.00% 0.070% 0.010% 0.081% 0.035% 0.005% 0.040% 0.035% 0.005% 0.040% Kerja Kurang vs OSBL 2
AB Ditto; 200 x 200 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.004% 0.001% 0.006% 0.004% 0.001% 0.006% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Ditto; 250 mm diameter No 2 2 0 0 2 1 1 50.00% 50.00% 0.00% 100.00% 0.023% 0.003% 0.027% 0.023% 0.003% 0.027% 0.012% 0.003% 0.015% Kerja Kurang vs OSBL 2
AC Flange; 200 mm diameter No 4 4 0 0 4 2 2 50.00% 50.00% 0.00% 100.00% 0.014% 0.004% 0.018% 0.014% 0.004% 0.018% 0.007% 0.004% 0.011% Kerja Kurang vs OSBL 2
Ditto; 250 mm diameter No 18 18 0 18 0 0 0 #DIV/0! 0.00% 0.082% 0.021% 0.103% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Item BILL NO. 4.2 SUMMARY Qty By Consultant Data Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG BY CONTS BOBOT KERJA KURANG DATA
Unit Keterangan
On On
Bidder Kerja Kurang Terinstal Terinstal Selisih Selisih Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
No. PIPING Warehouse Warehouse
Item BILL NO. 4.2 4.2.B - CHEMICAL PIPING Unit
No. PIPING
Fitting (cont'd)
W Hose Connection; 25 mm diameter No 6 0.00% 0.00% 0.00% 0.003% 0.000% 0.004% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
X Ditto; 80 mm diameter No 2 0.00% 0.00% 0.00% 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
HYDROCHLORIC ACID
W Ditto; 80 mm diameter No 1 1 0 1 0 0 0 0.00% 100.00% 0.00% 0.004% 0.000% 0.005% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
X Hose Connection; 25 mm diameter No 3 3 0 3 0 0 0 100.00% 0.00% 100.00% 0.00% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
Y Ditto; 80 mm diameter No 1 1 0 1 0 0 0 100.00% 0.00% 100.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Kerja Kurang vs OSBL 2
G Automatic Air Vent c/w Valve No 1 1 0 1 0 100.00% 0.00% 0.00% 0.00% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan
Security Room
Q Vent Cap; 50 mm diameter No 1 1 0 0 1 0.00% 100.00% 0.00% 100.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Tidak dikerjakan
D Ditto; 200 mm diameter m 59 18 41 0 18 69.49% 30.51% 69.49% 30.51% 0.059% 0.010% 0.069% 0.018% 0.018% 0.018% 0.003% 0.021% Material by Smart
Valve and Accessories
P Clean Out; 200 mm diameter No 4 4 0 0 4 0.00% 100.00% 0.00% 100.00% 0.004% 0.000% 0.004% 0.004% 0.000% 0.004% 0.004% 0.000% 0.004% Tidak dikerjakan
R Ditto; 150 mm diameter No 10 10 0 0 10 0.00% 100.00% 0.00% 100.00% 0.005% 0.001% 0.006% 0.005% 0.001% 0.006% 0.005% 0.001% 0.006% double kontrak CSA P2
S Fat Trap No 1 1 0 0 1 0.00% 100.00% 0.00% 100.00% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% Tidak dikerjakan
EL ± 0.000 (cont'd)
C Tee; 80 x 40 mm diameter No 3 3 0 3 0 100.00% 0.00% 0.00% 0.00% 0.000% 0.000% 0.001% 0.000% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
D Ditto; 100 x 80 mm diameter No 2 2 0 2 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
F Reducer; 80 x 65 mm diameter No 3 3 0 3 0 100.00% 0.00% 0.00% 0.00% 0.000% 0.000% 0.001% 0.000% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
Q Tee; 80 x 40 mm diameter No 3 3 0 3 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
R Ditto; 100 x 80 mm diameter No 1 1 0 1 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
Item BILL NO. 5 SUMMARY Unit Quantity Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG BY CONSULTANT BOBOT KERJA KURANG
Keterangan
Bidder Kerja Kurang Terinstal On Warehouse Sisa On Warehouse Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
No. MECHANICAL WORKS
S Ditto; 100 x 100 mm diameter No 2 2 0 2 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.002% 0.001% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
EL ± 16.000 (cont'd)
D Tee; 80 x 40 mm diameter No 3 3 0 0 3 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Tidak dikerjakan (riset)
E Ditto; 100 x 80 mm diameter No 2 2 0 2 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.002% 0.001% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
F Ditto; 100 x 100 mm diameter No 1 1 0 1 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
Q Tee; 80 x 40 mm diameter No 3 3 0 0 3 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Tidak dikerjakan (riset)
R Ditto; 100 x 80 mm diameter No 3 3 0 3 0 100.00% 0.00% 0.00% 0.00% 0.002% 0.001% 0.003% 0.002% 0.001% 0.003% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
EL ± 28.000 (cont'd)
Fitting
C Tee; 80 x 40 mm diameter No 2 2 0 0 2 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Tidak dikerjakan (riset)
D Ditto; 100 x 80 mm diameter No 1 1 0 0 1 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Tidak dikerjakan (riset)
G Automatic Air Vent c/w Valve No 1 1 0 1 0 100.00% 0.00% 0.00% 0.00% 0.002% 0.000% 0.002% 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
Item BILL NO. 5 5.3 - FIRE FIGHTING SYSTEM Unit Qty
No. MECHANICAL WORKS Bidder
EL ± 0.000
A Water Mist Nozzle; K5, pendent type No 194 194 0 194 0 100.00% 0.00% 0.00% 0.00% 0.045% 0.021% 0.066% 0.045% 0.021% 0.066% 0.000% 0.000% 0.000% Suply by Smart
Instalsi By Pbs
EL ± 10.000
B Water Mist Nozzle; K5, pendent type No 90 90 0 90 0 100.00% 0.00% 0.00% 0.00% 0.021% 0.010% 0.031% 0.021% 0.010% 0.031% 0.000% 0.000% 0.000% Suply by Smart
Instalsi By Pbs
EL ± 16.000
C Water Mist Nozzle; K5, pendent type No 94 94 0 94 0 100.00% 0.00% 0.00% 0.00% 0.022% 0.010% 0.032% 0.022% 0.010% 0.032% 0.000% 0.000% 0.000% Suply by Smart
Instalsi By Pbs
EL ± 19.000
D Water Mist Nozzle; K5, pendent type No 8 8 0 8 0 100.00% 0.00% 0.00% 0.00% 0.002% 0.001% 0.003% 0.002% 0.001% 0.003% 0.000% 0.000% 0.000% Suply by Smart
Instalsi By Pbs
EL ± 22.000
E Water Mist Nozzle; K5, pendent type No 54 54 0 54 0 100.00% 0.00% 0.00% 0.00% 0.013% 0.006% 0.018% 0.013% 0.006% 0.018% 0.000% 0.000% 0.000% Suply by Smart
Instalsi By Pbs
EL ± 28.000
F Water Mist Nozzle; K5, pendent type No 36 36 0 36 0 100.00% 0.00% 0.00% 0.00% 0.008% 0.004% 0.012% 0.008% 0.004% 0.012% 0.000% 0.000% 0.000% Suply by Smart
Instalsi By Pbs
Supply and Install Water Mist pipeworks; Black steel pipe
schedule 40 ASTM-A53 Grade A including fittings (for
50mm dia. pipe or less) complete with hangers, support,
brackets, painting and fixing accessories accordance with the
Technical Specification and drawings, as described :-
EL ± 0.000
Fitting
Item BILL NO. 5 SUMMARY Unit Quantity Material Progres Material Progres Jasa BOBOT KONTRAK BOBOT KERJA KURANG BY CONSULTANT BOBOT KERJA KURANG
Keterangan
Bidder Kerja Kurang Terinstal On Warehouse Sisa On Warehouse Sisa Terinstal Sisa Material Upah Total Material Upah Total Material Upah Total
No. MECHANICAL WORKS
M Tee; 150 x 32 mm diameter No 1 1 0 0 1 0.00% 100.00% 0.00% 100.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% Tidak dikerjakan (riset)
N Ditto; 150 x 50 mm diameter No 44 44 0 44 0 100.00% 0.00% 0.00% 0.00% 0.038% 0.010% 0.047% 0.038% 0.010% 0.047% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
EL ± 10.000
G Tee; 80 x 50 mm diameter No 42 42 0 42 0 100.00% 0.00% 0.00% 0.00% 0.013% 0.003% 0.017% 0.013% 0.003% 0.017% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
H Ditto; 80 x 80 mm diameter No 2 2 0 2 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
EL ± 16.000
T Tee; 80 x 50 mm diameter No 38 38 0 38 0 100.00% 0.00% 0.00% 0.00% 0.012% 0.003% 0.015% 0.012% 0.003% 0.015% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
U Ditto; 80 x 80 mm diameter No 3 3 0 3 0 100.00% 0.00% 0.00% 0.00% 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
E Tee; 80 x 50 mm diameter No 8 8 0 8 0 100.00% 0.00% 0.00% 0.00% 0.003% 0.001% 0.003% 0.003% 0.001% 0.003% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
M Tee; 80 x 50 mm diameter No 24 24 0 24 0 100.00% 0.00% 0.00% 0.00% 0.008% 0.002% 0.010% 0.008% 0.002% 0.010% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
EL ± 28.000 (cont'd)
Fitting
B Tee; 80 x 50 mm diameter No 20 20 0 20 0 100.00% 0.00% 0.00% 0.00% 0.006% 0.002% 0.008% 0.006% 0.002% 0.008% 0.000% 0.000% 0.000% Tidak dikerjakan (riset)
Supply and Install the following Main and Sub-Mains Circuit complete with
excavation & backfill for under ground installation, clamp, schoen, gland,
connection to equipment, galvanized conduit, flexible galvanized conduit, and all
necessary accessories as shown on the drawing & spesification, as described : -
A NYY 3 x (1C x 185 mm2) R, S, T + NYY 1C x 185 mm2 (N) + NYA 1C x 70 mm2
m (E) 250 220 0.442% 0.027% 0.469% 0.389% 0.023% 0.412% 0.000% 0.000% 0.000% Pemindahan Panel
from LVMDP-01 to SDB-BIO DIESEL (Explosion Proof Type)
B NYY 4C x 35 mm2 + NYA 1C x 16 mm2 (E) from SDB-BIO DIESEL to m 10 4 0.004% 0.000% 0.004% 0.001% 0.000% 0.002% 0.000% 0.000% 0.000% Pemindahan Panel
MCB-BOX LIGHTING -BIO DIESEL GF
C NYY 4C x 35 mm2 + NYA 1C x 16 mm2 (E) from SDB-BIO DIESEL to m 138 132 0.051% 0.003% 0.054% 0.049% 0.003% 0.052% 0.000% 0.000% 0.000% Pemindahan Panel
MCB-BOX LIGHTING -BIO DIESEL 1st
D NYY 4C x 16 mm2 + NYA 1C x 16 mm2 (E) from SDB-BIO DIESEL to m 118 110 0.023% 0.002% 0.025% 0.021% 0.002% 0.023% 0.000% 0.000% 0.000% Pemindahan Panel
MCB-BOX LIGHTING -BIO DIESEL 2nd
E NYY 4C x 16 mm2 + NYA 1C x 16 mm2 (E) from SDB-BIO DIESEL to m 144 134 0.028% 0.002% 0.031% 0.026% 0.002% 0.028% 0.000% 0.000% 0.000% Pemindahan Panel
MCB-BOX LIGHTING -BIO DIESEL 4th
Supply and Install lighting Fixture including tubes or lamps fixed in position
complete with cable gland, support and all accessories accordance with the
Technical Specification and drawings, as described :-
U Cable from local panel (NYY 3C x 2.5 mm² run-in and with rigid steel conduit) to;No 382 3 0.355% 0.046% 0.400% 0.003% 0.000% 0.003% 0.000% 0.000% 0.000% Tidak dikerjakan
light fittings
Supply and Install Grounding system complete with support and all neccessary
accessories accordance with the Technical Specification and drawings, as
described :-
Ground Floor
For Electrical
E Steel plate strip 200x50x3mm Thk No 15 15 0.004% 0.001% 0.005% 0.004% 0.001% 0.005% 0.000% 0.000% 0.000% Tidak dikerjakan
F Grounding bonding cable BC 35 mm2 c/w accessories m 160 30 0.007% 0.001% 0.008% 0.001% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan
1st Floor
For Electrical
L Copper grounding dispatcher No 3 1 0.002% 0.001% 0.003% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan
M Exothermic Welding No 8 2 0.002% 0.001% 0.002% 0.000% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan
O Grounding bonding cable BC 35 mm2 c/w accessories m 50 20 0.002% 0.000% 0.003% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan
2nd Floor
S Grounding bonding cable BC 35 mm2 c/w accessories m 130 30 0.006% 0.001% 0.007% 0.001% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan
4th Floor
AA Grounding bonding cable BC 35 mm2 c/w accessories m 85 35 0.004% 0.001% 0.004% 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% Tidak dikerjakan
Supply and Install power cables run in and with rigid steel conduit including
all neccessary accessories accordance with the Technical Specification and
drawings, as described :-
A NYY 5C x 4 mm² from MCB-BOX LIGHTING -BIO DIESEL GF to m 97 97 0.006% 0.001% 0.006% 0.006% 0.001% 0.006% 0.000% 0.000% 0.000% Tidak dikerjakan
Shutter Door (BA-21, 22, 23)
B NYY 5C x 4 mm² from MCB-BOX LIGHTING -BIO DIESEL GF to m 103 103 0.006% 0.001% 0.007% 0.006% 0.001% 0.007% 0.000% 0.000% 0.000% Tidak dikerjakan
Shutter Door (BA-24, 25, 26)
C NYY 5C x 4 mm² from MCB-BOX LIGHTING -BIO DIESEL GF to m 103 103 0.006% 0.001% 0.007% 0.006% 0.001% 0.007% 0.000% 0.000% 0.000% Tidak dikerjakan
Shutter Door (BA-27, 28, 29)
D NYY 5C x 4 mm² from MCB-BOX LIGHTING -BIO DIESEL GF to m 110 110 0.006% 0.001% 0.007% 0.006% 0.001% 0.007% 0.000% 0.000% 0.000% Tidak dikerjakan
Shutter Door (BA-30, 31, 32)
Item BILL NO. 6 6.8 - FIRE ALARM SYSTEM Unit Qty
No. ELECTRICAL WORKS
Supply and Install Grounding system complete with support and all neccessary
accessories accordance with the Technical Specification and drawings, as
described :-
Ground Floor
E Conventional Manual Call Station No 1 1 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan
F Conventional Horn & Strobe No 1 1 0.003% 0.000% 0.003% 0.003% 0.000% 0.003% 0.000% 0.000% 0.000% Tidak dikerjakan
Item BILL NO. 6 6.8 - FIRE ALARM SYSTEM Unit Qty
No. ELECTRICAL WORKS
Supply and Install the following Fire Alarm Cable including excavation & backfill (Cont'd)
A Cabling point (FRC 2C x 2.5 mm2 run-in and with rigid steel conduit) to; No 12 12 0.008% 0.001% 0.009% 0.008% 0.001% 0.009% 0.000% 0.000% 0.000% Tidak dikerjakan
Conventional horn & strobe
B Cabling point (FRC 2C x 1.5 mm2 run-in and with rigid steel conduit) to; No 1 1 0.001% 0.000% 0.001% 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% Tidak dikerjakan
Flow Switch
C Cabling point (FRC 2C x 1.5 mm2 run-in and with rigid steel conduit) to; No 5 5 0.003% 0.001% 0.003% 0.003% 0.001% 0.003% 0.000% 0.000% 0.000% Tidak dikerjakan
Water Mist