BREAK DOWN
REV. DATE DSG'D CHK'D. APP'D
PROJECT
ITEM DESCRIPTION Notasi UoM BoQ Unit Price TOTAL PRICE
REQUIREMENT
I. PRELIMINARY WORKS
Mobilization and demobilization of work equipment, work
1 AN.00.a Lot 1.00
materials, manpower, Etc.
2 Safety equipment AN.00.b Lot 1.00
2 Pipe Support
- Profil L50x50x4 50x50 thk 4 mm AN.02.d Kg 54.74
- Pelat Thk 5 mm Carboon Steel, Thk 5 mm AN.02.d Kg 517.97
- Dynabolt M8-65 M8 Length 65 mm Ea 170.00
- U-Bolt 3 Inch Galvanized Galvanized 3 Inch, + Bolt Ea 85.00
Wirebruss, Primer Jotamastic 70 100 mic, Finish Hardtop
- Painting Steel Structure AN.02.e M 2
4.85
XP RAL 7040 50 mic
TOTAL Rp -
VAT 11% Rp -
TOTAL + VAT 11% Rp -