SPEC. No.
2.1 Install pump for sum pit #1 02 Install pumps for Sum pit: For
sets Type: Submersible pump wastewater of
380V OAHU
(Design by contractor ) machines
01 Install Control panel For 2 pumps
sets Connect 4-level control
switch according to the
water level of the sump pit
tank
(Level LL: Pump OFF
Level L: Run 1 pump
Level H: Runs 2 pumps
Level HH Sum pit is full
2 pumps automatically run
alternately)
(Design by contractor)
SPEC. No.
- Fitting: PN10
- Material: PVC
- Maker: The fist/ Binh minh
(Design by contractor)
Support: Do not affect
01 lot - V steel + U clamp. TVB
- Epoxy painting 3 layers equipment.
Label name:
same as
01 lot Name wastewater pipe line
existing
C
C Running test
Visual check and operation No leaked
01 lot Normal
of equipment check
operation
3. Material Forecast.
1. Proposal Schedule
1 Document
preparation
2 Purchase procedure
3 Work
implementation
4 Handover
2. Accomplishment test:
No Inspection content Testing Standard value Ins. Method Reference
parameter
1 Equpiment Maker New, right maker Visual check
SPEC. No.
3. Warranty.
4. Others.
Contractor designs the detail structure and bear full responsibility for the technique quality of this design. Any
damages, which cause by the design, contractor has to compensate for them.
Contractor's drawings of the project are user for at site checking only. This is not a matter upon technique
contract.
The job shall be performed on Sunday or holiday for stopping utilities that do not make any effect to production
Keep working area clean and tidy. Protection work must be applied during working time to prevent any
affected to products.
The contractor has to inform to list of manpower, working time and confirm to TVB when start the job at site
every periods.
If any trouble happens in working times, the contractor has to inform Facility Control Section.
Equipment & Material must be kept at a place that is outside of factory, which is decided by TVB.
Scrap material must be moved out of TVB completely.
Any activity, which may affect to environment, must be prohibited. If any damage occurs, contractor must
bear the compensation.
Any item that is not described in this specification or changing specification is decided through agreement of
both parties.
5. Layout City water supply pipe.
SPEC. No.
SPEC. No.