CNI Lapaopao Block Laterite RKEF Project Phase 1 Page: 1/3 Rev.

: A
CSA Design Condition Notification-First Design Input DOC No.: 922A-DCN-017\018-E921-1

Project Name : CNI Lapaopao Block Laterite RKEF Project Phase 1

Project No. : 922A

Company : PT. Ceria Metalindo Prima

CSA Design Condition Notification-Circulating Water Pump House For RKEF Smelting And
Subject : Demineralized Water Station&Circulating Water System For FeNi Granulation(Area 017\018)
-Water supply and drainage
CNI Lapaopao Block Laterite RKEF Project Phase 1 Page: 2/3 Rev.: A
CSA Design Condition Notification-First Design Input DOC No.: 922A-DCN-017\018-E921-1

CNI LAPAOPAO Block Laterite RKEF Project


Phase 1- Circulating water pump house for
Project No. 922A Works/Area description RKEF smelting and demineralized water Design stage Detailed Design
station&Circulating water system for FeNi
granulation

To Architecture &Structure:

The first input for Circulating Water Pump House For RKEF Smelting And Demineralized Water Station (017) is provided.

Circulating water pump room and softened water station for smelting (017) includes:
Content and requirements

The hot circulating water pond for the furnace body, (equipment+furnace body) cool circulating water pond, hot slag granulation
circulating water pond, cooling tower for furnace body circulating water, cooling tower for equipment circulating water, cooling
tower for slag granulation circulating water, hot circulating water pump set, cool circulating water pump set, automatic water softener,
shallow sand filter, stainless steel domestic water tank, constant pressure variable frequency water supply device, ultraviolet
disinfection device, etc;

The circulating water pump set and complete equipment set for this area include:

3 sets of hot water pumps (electric pump, 2 for use and 1 for standby) for furnace circulating water, 3 sets of cool water pumps (electric
pump, 2 for use and 1 for standby) for furnace circulating water, and 2 sets of side filter pumps (electric pump, 1 for use and 1 for
standby); 2 sets of cool water pumps (electric pump, 1 for use and 1 for standby) for equipment circulating water, 2 sets of cool
water pumps (electric pump, 1 for use and 1 for standby) for slag granulation circulating water, 2 sets of submersible sewage pumps
(1 for use and 1 for standby, both for use only on temporary basis), 1 set of shallow sand filter, 1 set of automatic water softener, 1
CNI Lapaopao Block Laterite RKEF Project Phase 1 Page: 3/3 Rev.: A
CSA Design Condition Notification-First Design Input DOC No.: 922A-DCN-017\018-E921-1

CNI LAPAOPAO Block Laterite RKEF Project


Phase 1- Circulating water pump house for
Project No. 922A Works/Area description RKEF smelting and demineralized water Design stage Detailed Design
station&Circulating water system for FeNi
granulation
set of stainless steel domestic water tank, 1 set of constant pressure water supply device with variable frequency, 1 set of ultraviolet
disinfection equipment See the attached drawings for the size of buildings and structures as well as equipment positioning;

To Architecture &Structure:

The first input for Circulating Water System For FeNi Granulation (018) is provided.

FeNi shotting circulating water (018) is composed of:

Cool water pond for shotting circulating water, shotting cooling tower, cool water pump for shotting circulating water (3 electric
pumps, 2 for use and 1 for standby). See the attached drawings for the size of buildings and structures as well as equipment
positioning.

Chief Designer Approved by Reviewed by Designed by

Design input by Water supply and drainage Date 06-Mar-23 Design input to Architecture &Structure Date 06-Mar-23