Professional Documents
Culture Documents
Rev-2
Designed by : SUDEEP P
Checked by : PRASHANT VANKAR
Approved by : RAJEEV KUMAR
E
EN
NE
ER
RG
GO
O
E
EN
NG
G II N
NE
EE
ER
R II N
NG
G PP R
RO
O JJ EE C
CT
T SS L
L TT D
D ..
Page
Page 22 of
of 22
1
1.1
1.2
Design consideration
1) Pumps to be located at PMPH-1
2) RCC Water tank of Capacity for one hour operation of the pump with
accessories like solenoid valve at inlet of tank, Level Switch, Drain.
3) Two pumps (1W+1S) are envisaged for this system.
4) All pipes will be GI/MS (Heavy Grade) as per specification.
5) Velocity of water less than 2.0m/sec considered for this system.
1.3
Features
1) Water will be stored at PMPH-1 and Water from PMPH-1 tank, shall be
supplied to the scoop coupling.
2) The water pump shall be interlocked with low-level switch of feed water tank
to prevent the pump from dry running.
3) There shall be two water pumps (1W+1S) in case of cooling water system for
continuous operation.
4) The water pumping system shall consist of duplex strainer with SS element
500 microns.
5) Pump shall have a Butterfly Valve at the suction and Globe Valve at discharge
end. Each pump shall have a check valve at the discharge end.
6) A pressure relief valve shall be provided at the main delivery line of the
pumping system so that the excess water returns to water tank.
7) Pressure Gauge & Pressure Switch shall be provided at the main delivery line.
8) The operation of the cooling water points by manual by means of Ball Valve.
9) Return line shall have NRV.
10)
All underground pipe line would be provided with 4 mm thick Coal Tar
tapes.
11)
Pump Details: (Min.) 4.2 M/hr, 157 M Head. (Final rating will be as per
pump manufacturer standard)
1.4
Application Area
E
EN
NE
ER
RG
GO
O
E
EN
NG
G II N
NE
EE
ER
R II N
NG
G PP R
RO
O JJ EE C
CT
T SS L
L TT D
D ..
Page
Page 22 of
of 22