Pipeline Engineering

API RP 1102 Pipeline Crossing Calculations ver 0.0


https://pipeeng.com/pipeline_crossing.html

Project ING. SIMAR LOZA Developer FABIAN ARMAZA


Date 2021-12-30 Approver
Revision 0 Reviewer

Input Data
Pipe Outside Diameter, D inch 2.38
Pipe Wall Thickness, t inch 0.154
Pipe SMYS, Pa psi 35000
Design Pressure, P psi 527.00
Installation Temperature, T1 °F 60.0
Max. or Min. Design Temperature, T2 °F 60.0
Depth of Cover, H ft 16.0
Bored Diameter, Bd inch 2.38
Soil Unit Weight, Y lb/ft³ 120.0
Modulus of Soil Reaction, E' ksi 0.50
Resilient Modulus of Soil, Er ksi 5.00
Applied Design Surface Pressure, w psi 69.4
Impact Factor, Fi - 1.17
Design Factor, F - 0.40
Longitudinal Joint Factor, E - 1.00
Temperature Derating Factor, T - 1.00

API 1102 Parameters


Earth Load Stiffness factor, KHe - 289.33
Earth Load Burial Factor, Be - 1.3598
Earth Load Excavation factor, Ee - 0.8316
Cyclic Hoop Road Stiffness Factor, KHh - 3.50
Cyclic Hoop Road Geometry Factor, GHh - 0.6854
Road Pavement Type Factor, R - 1.10
Road Axle Configuration Factor, L - 1.00
Cyclic Longitudinal Road Stiffness Factor, KLh - 7.29
Cyclic Longitudinal Road Geometry Factor, GLh - 2.48
Fatigue Endurance Limit of Girth Yield, SFG psi 12000
Fatigue Endurance Limit of Longitudinal Weld, SFL psi 21000

Downloaded on 30/12/2021 09:21:47 from pipeeng.com Page 1 of 2


Pipeline Engineering

Result
Earth Load Stress psi 54
Cyclic Circumferential Stress psi 214
Cyclic Longitudinal Stress psi 1615
Internal Pressure Hoop Stress psi 4064
Maximum Circumferential Stress psi 4332
API 1102 Maximum Longitudinal Stress psi 2850
API 1102 Maximum Radial Stress psi -527
API 1102 Effective Stress psi 4313

API RP 1102 Stress Check


Item Stress Limit Analysis Pass/ Fail
(psi) Results (psi)
Hoop Stress (Barlow) 14,000 4,064 Pass
Total Effective Stress 14,000 4,313 Pass
Girth Weld Fatigue 4,800 1,615 Pass
Longitudinal Weld Fatigue 8,400 214 Pass