LIST REGISTER : HEAVY EQUIPMENT

PROJECT : PIPELINE MAINTENANCE


LOCATION : DURI - RIAU
CLIENT : PERTAMINA HULU ROKAN (PHR)

NO DESCRIPTION SPECIFICATION
1 Trenching Process
1.1 Trencher Dig Depth 46 in (1,000 mm)
1.2 Backhoe Bucket 1 m3
1.3 Wheel Loader Bucket 3 m3

2 Laydown & Stringing Stage


2.1 Excavator PC 200
2.2 Forklift Telehandler Forklift, RTF (Rough Terain Forklift)
2.3 Pipelayer C15CAT_238KW_97.97KG

3 Lifting Stage
3.1 Crane / TMC (Truck Mounted Crane) Kapasitas 30 ton, Telescopic Boom
3.2 Hoist Hand Chain Hoist - Chain Block 35 Ton

4 Buried Stage
4.1 Backfill Compactor Jumping Jack, Stamper (Plate Compactor)
4.2 Bulldozer Blade 2.3 m3 D39PX-22
4.3 Jumping Jack Mikasa MT-55 / Setara
4.4 Plate Stemper Masterpac PC3610/ Setara

5 Dismantle Pipe Stage


5.1 Cold Cutting & Beveling Machine diameter 6" - 60", thickness 50 mm
5.2 Stople size 3" - 56", Pressure up to 153 Bar/ 2220 psi
5.3 Compressor 185 cfm (5.2 Cubic Meter per Minutes), 7 bar

LIST REGISTER : VENDOR


PROJECT : PIPELINE MAINTENANCE
LOCATION : DURI - RIAU
CLIENT : PERTAMINA HULU ROKAN (PHR)

NO DESCRIPTION VENDOR
1 Non Destructif Test (NDT) PT Sinar Nanotech Indonesia
2 Radiography Test (RT) PT Sinar Nanotech Indonesia
3 Hydrostatic Test PT Sinar Nanotech Indonesia
4 Pnumatic Test PT Sinar Nanotech Indonesia
5 Phassed Array Ultrasonic Test (PAUT) PT Sinar Nanotech Indonesia
6 Hydro Jetting PT Sinar Nanotech Indonesia
7 Pipeline Investigation Gauges (PIGGING Work) PT Sinar Nanotech Indonesia
8 Cathodic Protection PT Sinar Nanotech Indonesia
9 N2 Purging PT Petro Gas Industri
10 Piping Insulation & Jacketing PT Maju Teknik Sejahtera
11 Epoxy Coating PT Eltama Prima Indo
12 Sandlasting PT Eltama Prima Indo
13 Cold Cutting & Beveling Pipe PT Kurnia Global Energi
14 Hot Tap PT Lerindo Internasional -Duri
15 Stopple Plugging PT Lerindo Internasional -Duri

04/01/202404:26:42 pamardi@pt-ssa.co.id
1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 2 inch
Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 2.00 6,296
Welder DB 2.00 41,831
Fitter 01 DB 2.00 28,031
Fitter 02 DB 2.00 24,869
Helper DB 2.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 30,083

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 3 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 3.00 6,296
Welder DB 3.00 41,831
Fitter 01 DB 3.00 28,031
Fitter 02 DB 3.00 24,869
Helper DB 3.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 45,124
Jumlah Harga Bahan (B)
C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 4 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 4.00 6,296
Welder DB 4.00 41,831
Fitter 01 DB 4.00 28,031
Fitter 02 DB 4.00 24,869
Helper DB 4.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 60,165

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 6 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 6.00 6,296
Welder DB 6.00 41,831
Fitter 01 DB 6.00 28,031
Fitter 02 DB 6.00 24,869
Helper DB 6.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 90,248

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 8 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 8.00 6,296
Welder DB 8.00 41,831
Fitter 01 DB 8.00 28,031
Fitter 02 DB 8.00 24,869
Helper DB 8.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 120,330

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 2,200,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )


1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 10 inch
Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 10.00 6,296
Welder DB 10.00 41,831
Fitter 01 DB 10.00 28,031
Fitter 02 DB 10.00 24,869
Helper DB 10.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 150,413

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 2,750,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 12 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 12.00 6,296
Welder DB 12.00 41,831
Fitter 01 DB 12.00 28,031
Fitter 02 DB 12.00 24,869
Helper DB 12.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 180,495

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 3,300,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 14 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 14.00 6,296
Welder DB 14.00 41,831
Fitter 01 DB 14.00 28,031
Fitter 02 DB 14.00 24,869
Helper DB 14.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 210,578

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 3,850,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 16 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 16.00 6,296
Welder DB 16.00 41,831
Fitter 01 DB 16.00 28,031
Fitter 02 DB 16.00 24,869
Helper DB 16.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 240,660
Equipment Fuel Lt 1.00 380,000

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 4,400,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 18 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 18.00 6,296
Welder DB 18.00 41,831
Fitter 01 DB 18.00 28,031
Fitter 02 DB 18.00 24,869
Helper DB 18.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 270,743
Equipment Fuel Lt 1.00 427,500

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 4,950,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 20 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 20.00 6,296
Welder DB 20.00 41,831
Fitter 01 DB 20.00 28,031
Fitter 02 DB 20.00 24,869
Helper DB 20.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 300,825
Equipment Fuel Lt 1.00 475,000

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 5,500,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 24 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 24.00 6,296
Welder DB 24.00 41,831
Fitter 01 DB 24.00 28,031
Fitter 02 DB 24.00 24,869
Helper DB 24.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 360,990
Equipment Fuel Lt 1.00 570,000

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 6,600,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan
F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Pengelasan Pipa C.S Pipe Sch 40 30 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 30.00 6,296
Welder DB 30.00 41,831
Fitter 01 DB 30.00 28,031
Fitter 02 DB 30.00 24,869
Helper DB 30.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 451,238
Equipment Fuel Lt 1.00 712,500

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 1.000 8,250,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 2 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 4.00 6,296
Welder DB 4.00 41,831
Fitter 01 DB 4.00 28,031
Fitter 02 DB 4.00 24,869
Helper DB 4.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 60,165

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 3 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 6.00 6,296
Welder DB 6.00 41,831
Fitter 01 DB 6.00 28,031
Fitter 02 DB 6.00 24,869
Helper DB 6.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 90,248

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 4 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 8.00 6,296
Welder DB 8.00 41,831
Fitter 01 DB 8.00 28,031
Fitter 02 DB 8.00 24,869
Helper DB 8.00 22,569
Jumlah Tenaga Kerja (A)
B BAHAN
Consumeable Ls 1.00 120,330

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 6 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 12.00 6,296
Welder DB 12.00 41,831
Fitter 01 DB 12.00 28,031
Fitter 02 DB 12.00 24,869
Helper DB 12.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 180,495

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 8 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 16.00 6,296
Welder DB 16.00 41,831
Fitter 01 DB 16.00 28,031
Fitter 02 DB 16.00 24,869
Helper DB 16.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 240,660

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 10 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 20.00 6,296
Welder DB 20.00 41,831
Fitter 01 DB 20.00 28,031
Fitter 02 DB 20.00 24,869
Helper DB 20.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 300,825

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Jumlah Harga Alat (C)
D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 12 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 24.00 6,296
Welder DB 24.00 41,831
Fitter 01 DB 24.00 28,031
Fitter 02 DB 24.00 24,869
Helper DB 24.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 360,990

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 14 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 28.00 6,296
Welder DB 28.00 41,831
Fitter 01 DB 28.00 28,031
Fitter 02 DB 28.00 24,869
Helper DB 28.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 421,156
Jumlah Harga Bahan (B)
C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 16 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 32.00 6,296
Welder DB 32.00 41,831
Fitter 01 DB 32.00 28,031
Fitter 02 DB 32.00 24,869
Helper DB 32.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 481,321

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 18 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 36.00 6,296
Welder DB 36.00 41,831
Fitter 01 DB 36.00 28,031
Fitter 02 DB 36.00 24,869
Helper DB 36.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 541,486

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 4,950,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 20 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 40.00 6,296
Welder DB 40.00 41,831
Fitter 01 DB 40.00 28,031
Fitter 02 DB 40.00 24,869
Helper DB 40.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 601,651

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 5,500,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )


2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 24 inch
Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 48.00 6,296
Welder DB 48.00 41,831
Fitter 01 DB 48.00 28,031
Fitter 02 DB 48.00 24,869
Helper DB 48.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 721,981

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 6,600,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

2 joint Pekerjaan Pengelasan Elbow 90_LR C.S Pipe Sch 40 30 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 60.00 6,296
Welder DB 60.00 41,831
Fitter 01 DB 60.00 28,031
Fitter 02 DB 60.00 24,869
Helper DB 60.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 902,476

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 8,250,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 2 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 6.00 6,296
Welder DB 6.00 41,831
Fitter 01 DB 6.00 28,031
Fitter 02 DB 6.00 24,869
Helper DB 6.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 90,248

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 3 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 9.00 6,296
Welder DB 9.00 41,831
Fitter 01 DB 9.00 28,031
Fitter 02 DB 9.00 24,869
Helper DB 9.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 135,371

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 4 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 12.00 6,296
Welder DB 12.00 41,831
Fitter 01 DB 12.00 28,031
Fitter 02 DB 12.00 24,869
Helper DB 12.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 180,495

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 6 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 18.00 6,296
Welder DB 18.00 41,831
Fitter 01 DB 18.00 28,031
Fitter 02 DB 18.00 24,869
Helper DB 18.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 270,743

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 8 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 24.00 6,296
Welder DB 24.00 41,831
Fitter 01 DB 24.00 28,031
Fitter 02 DB 24.00 24,869
Helper DB 24.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 360,990

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan
F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 10 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 30.00 6,296
Welder DB 30.00 41,831
Fitter 01 DB 30.00 28,031
Fitter 02 DB 30.00 24,869
Helper DB 30.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 451,238

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 12 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 36.00 6,296
Welder DB 36.00 41,831
Fitter 01 DB 36.00 28,031
Fitter 02 DB 36.00 24,869
Helper DB 36.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 541,486

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 14 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 42.00 6,296
Welder DB 42.00 41,831
Fitter 01 DB 42.00 28,031
Fitter 02 DB 42.00 24,869
Helper DB 42.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 631,733

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 16 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 48.00 6,296
Welder DB 48.00 41,831
Fitter 01 DB 48.00 28,031
Fitter 02 DB 48.00 24,869
Helper DB 48.00 22,569
Jumlah Tenaga Kerja (A)
B BAHAN
Consumeable Ls 1.00 721,981

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 18 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 54.00 6,296
Welder DB 54.00 41,831
Fitter 01 DB 54.00 28,031
Fitter 02 DB 54.00 24,869
Helper DB 54.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 812,229

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 4,950,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 20 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 60.00 6,296
Welder DB 60.00 41,831
Fitter 01 DB 60.00 28,031
Fitter 02 DB 60.00 24,869
Helper DB 60.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 902,476

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 5,500,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 22 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 66.00 6,296
Welder DB 66.00 41,831
Fitter 01 DB 66.00 28,031
Fitter 02 DB 66.00 24,869
Helper DB 66.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 992,724

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 6,050,000
Jumlah Harga Alat (C)
D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 24 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 72.00 6,296
Welder DB 72.00 41,831
Fitter 01 DB 72.00 28,031
Fitter 02 DB 72.00 24,869
Helper DB 72.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 1,082,971

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 6,600,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

3 joint Pekerjaan Pengelasan Tee Straight C.S Pipe Sch 40 30 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 90.00 6,296
Welder DB 90.00 41,831
Fitter 01 DB 90.00 28,031
Fitter 02 DB 90.00 24,869
Helper DB 90.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 1,353,714
Jumlah Harga Bahan (B)
C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000
Excavator PC-200 --> 1 m3 Bucket Ls 0.833 8,250,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 2 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 2.00 6,296
Welder DB 2.00 41,831
Fitter 01 DB 2.00 28,031
Fitter 02 DB 2.00 24,869
Helper DB 2.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 30,083

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 3 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 3.00 6,296
Welder DB 3.00 41,831
Fitter 01 DB 3.00 28,031
Fitter 02 DB 3.00 24,869
Helper DB 3.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 45,124

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 4 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 4.00 6,296
Welder DB 4.00 41,831
Fitter 01 DB 4.00 28,031
Fitter 02 DB 4.00 24,869
Helper DB 4.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 60,165

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )


1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 6 inch
Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 6.00 6,296
Welder DB 6.00 41,831
Fitter 01 DB 6.00 28,031
Fitter 02 DB 6.00 24,869
Helper DB 6.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 90,248

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 8 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 8.00 6,296
Welder DB 8.00 41,831
Fitter 01 DB 8.00 28,031
Fitter 02 DB 8.00 24,869
Helper DB 8.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 120,330

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Jumlah Harga Alat (C)
D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 10 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 10.00 6,296
Welder DB 10.00 41,831
Fitter 01 DB 10.00 28,031
Fitter 02 DB 10.00 24,869
Helper DB 10.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 150,413

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 12 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 12.00 6,296
Welder DB 12.00 41,831
Fitter 01 DB 12.00 28,031
Fitter 02 DB 12.00 24,869
Helper DB 12.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 180,495

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 14 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 14.00 6,296
Welder DB 14.00 41,831
Fitter 01 DB 14.00 28,031
Fitter 02 DB 14.00 24,869
Helper DB 14.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 210,578

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 16 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 16.00 6,296
Welder DB 16.00 41,831
Fitter 01 DB 16.00 28,031
Fitter 02 DB 16.00 24,869
Helper DB 16.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 240,660

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 18 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 18.00 6,296
Welder DB 18.00 41,831
Fitter 01 DB 18.00 28,031
Fitter 02 DB 18.00 24,869
Helper DB 18.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 270,743

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan
F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 20 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 20.00 6,296
Welder DB 20.00 41,831
Fitter 01 DB 20.00 28,031
Fitter 02 DB 20.00 24,869
Helper DB 20.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 300,825

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 24 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 24.00 6,296
Welder DB 24.00 41,831
Fitter 01 DB 24.00 28,031
Fitter 02 DB 24.00 24,869
Helper DB 24.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 360,990

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )

1 joint Pekerjaan Install Flange WNRF#150 C.S Sch 40 30 inch


Harga Satuan
No. Uraian Sat Koef
(Rp.)
A TENAGA
Forman DB 30.00 6,296
Welder DB 30.00 41,831
Fitter 01 DB 30.00 28,031
Fitter 02 DB 30.00 24,869
Helper DB 30.00 22,569

Jumlah Tenaga Kerja (A)


B BAHAN
Consumeable Ls 1.00 451,238

Jumlah Harga Bahan (B)


C PERALATAN & OTHERS
Tripod / Tackel & Handle Crane 2 Ton day 0.004 345,000

Jumlah Harga Alat (C)


D Jumlah ( A + B + C )
E Dibulatkan

F Harga Satuan Pekerjaan ( E + F )


Mon - Fri
07,00 - 12,00 5 hrs x
12,00 - 13,00 1 hrs x
13,00 - 15,00 2 hrs x
15,00 - 16,00 1 hrs x
16,00 - 18,00 2 hrs x
32 Kg/Ea
Jumlah Harga
Work on 10 DB/day rate/hr rate/day
(Rp.) Site
12.5 hrs 0.20 Forman 25,185 314,812
12,592 1.00 Welder 33,465 418,313
83,663 1.00 Fitter 1 22,425 280,313
56,063 1.00 Fitter 2 19,895 248,688
49,738 1.00 Helper 18,055 225,688
45,138
Heavy Equipment Fuel Consumtion
247,193 On Site 10.00 DB/Day Fuel/Hr MFO Rate/Lt
12.5 hrs Excavator PC200 20 Lt 19,000
30,083
Heavy Equipment Rent Cost
On Site 10.00 DB/Day rate/hr Rent Cost / DB
30,083 12.5 hrs Excavator PC200 220,000 275,000.00

-
277,275
277,300

277,300

67 Kg/Ea
Jumlah Harga

(Rp.)

18,889
125,494
84,094
74,606
67,706

370,789

45,124
45,124

-
415,913
416,000

416,000

95 Kg/Ea
Jumlah Harga

(Rp.)

25,185
167,325
112,125
99,475
90,275

494,385

60,165

60,165

1,380

1,380
555,930
556,000

556,000

168 Kg/Ea
Jumlah Harga

(Rp.)

37,777
250,988
168,188
149,213
135,413

741,578

90,248

90,248

1,380

1,380
833,205
833,300

833,300

252 Kg/Ea
Jumlah Harga

(Rp.)

50,370
334,650
224,250
198,950
180,550

988,770

120,330

120,330

1,380
2,200,000

2,201,380
3,310,480
3,310,500

3,310,500
358 Kg/Ea
Jumlah Harga

(Rp.)

62,962
418,313
280,313
248,688
225,688

1,235,963

150,413

150,413

1,380
2,750,000

2,751,380
4,137,755
4,137,800

4,137,800

473 Kg/Ea
Jumlah Harga

(Rp.)

75,555
501,975
336,375
298,425
270,825

1,483,155

180,495

180,495

1,380
3,300,000

3,301,380
4,965,030
4,965,100

4,965,100

561 Kg/Ea
Jumlah Harga

(Rp.)

88,147
585,638
392,438
348,163
315,963

1,730,348

210,578

210,578

1,380
3,850,000

3,851,380
5,792,305
5,792,400

5,792,400

732 Kg/Ea
Jumlah Harga

(Rp.)

100,740
669,300
448,500
397,900
361,100

1,977,540
240,660
380,000

620,660

1,380
4,400,000

4,401,380
6,999,580
6,999,600

6,999,600

924 Kg/Ea
Jumlah Harga

(Rp.)

113,332
752,963
504,563
447,638
406,238

2,224,733

270,743
427,500

698,243

1,380
4,950,000

4,951,380
7,874,355
7,874,400

7,874,400

1,088 Kg/Ea
Jumlah Harga

(Rp.)
125,925
836,625
560,625
497,375
451,375

2,471,925

300,825
475,000

775,825

1,380
5,500,000

5,501,380
8,749,130
8,749,200

8,749,200

1,516 Kg/Ea
Jumlah Harga

(Rp.)

151,110
1,003,950
672,750
596,850
541,650

2,966,310

360,990
570,000

930,990

1,380
6,600,000

6,601,380
10,498,680
10,498,700
10,498,700

2,035 Kg/Ea
Jumlah Harga

(Rp.)

188,887
1,254,938
840,938
746,063
677,063

3,707,888

451,238
712,500

1,163,738

1,380
8,250,000

8,251,380
13,123,006
13,123,100

13,123,100

0.64 Kg/Ea
Jumlah Harga

(Rp.)

25,185
167,325
112,125
99,475
90,275

494,385

60,165

60,165
-
554,550
554,600

554,600

2.04 Kg/Ea
Jumlah Harga

(Rp.)

37,777
250,988
168,188
149,213
135,413

741,578

90,248

90,248

-
831,825
831,900

831,900

3.84 Kg/Ea
Jumlah Harga

(Rp.)

50,370
334,650
224,250
198,950
180,550
988,770

120,330

120,330

-
1,109,100
1,109,200

1,109,200

9.94 Kg/Ea
Jumlah Harga

(Rp.)

75,555
501,975
336,375
298,425
270,825

1,483,155

180,495

180,495

-
1,663,650
1,663,700

1,663,700

20.10 Kg/Ea
Jumlah Harga

(Rp.)

100,740
669,300
448,500
397,900
361,100

1,977,540

240,660

240,660

-
2,218,200
2,218,300

2,218,300

35.40 Kg/Ea
Jumlah Harga

(Rp.)

125,925
836,625
560,625
497,375
451,375

2,471,925

300,825

300,825
-
2,772,750
2,772,800

2,772,800

57.00 Kg/Ea
Jumlah Harga

(Rp.)

151,110
1,003,950
672,750
596,850
541,650

2,966,310

360,990

360,990

1,380

1,380
3,328,680
3,328,700

3,328,700

79.10 Kg/Ea
Jumlah Harga

(Rp.)

176,295
1,171,275
784,875
696,325
631,925

3,460,695

421,156
421,156

1,380

1,380
3,883,231
3,883,300

3,883,300

118.00 Kg/Ea
Jumlah Harga

(Rp.)

201,480
1,338,600
897,000
795,800
722,200

3,955,080

481,321

481,321

1,380

1,380
4,437,781
4,437,800

4,437,800

169.00 Kg/Ea
Jumlah Harga

(Rp.)

226,665
1,505,925
1,009,125
895,275
812,475

4,449,465

541,486

541,486

1,380
4,123,350

4,124,730
9,115,681
9,115,700

9,115,700

249.00 Kg/Ea
Jumlah Harga

(Rp.)

251,850
1,673,250
1,121,250
994,750
902,750

4,943,850

601,651

601,651

1,380
4,581,500

4,582,880
10,128,381
10,128,400

10,128,400
366.00 Kg/Ea
Jumlah Harga

(Rp.)

302,220
2,007,900
1,345,500
1,193,700
1,083,300

5,932,620

721,981

721,981

1,380
5,497,800

5,499,180
12,153,781
12,153,800

12,153,800

612.00 Kg/Ea
Jumlah Harga

(Rp.)

377,775
2,509,875
1,681,875
1,492,125
1,354,125

7,415,775

902,476

902,476

1,380
6,872,250

6,873,630
15,191,881
15,191,900

15,191,900

1.59 Kg/Ea
Jumlah Harga

(Rp.)

37,777
250,988
168,188
149,213
135,413

741,578

90,248

90,248

-
831,825
831,900

831,900

3.18 Kg/Ea
Jumlah Harga

(Rp.)

56,666
376,481
252,281
223,819
203,119

1,112,366
135,371

135,371

-
1,247,738
1,247,800

1,247,800

5.45 Kg/Ea
Jumlah Harga

(Rp.)

75,555
501,975
336,375
298,425
270,825

1,483,155

180,495

180,495

-
1,663,650
1,663,700

1,663,700

15.40 Kg/Ea
Jumlah Harga

(Rp.)
113,332
752,963
504,563
447,638
406,238

2,224,733

270,743

270,743

-
2,495,475
2,495,500

2,495,500

25.00 Kg/Ea
Jumlah Harga

(Rp.)

151,110
1,003,950
672,750
596,850
541,650

2,966,310

360,990

360,990

-
3,327,300
3,327,400
3,327,400

38.60 Kg/Ea
Jumlah Harga

(Rp.)

188,887
1,254,938
840,938
746,063
677,063

3,707,888

451,238

451,238

-
4,159,126
4,159,200

4,159,200

58.80 Kg/Ea
Jumlah Harga

(Rp.)

226,665
1,505,925
1,009,125
895,275
812,475

4,449,465

541,486

541,486
1,380

1,380
4,992,331
4,992,400

4,992,400

87.60 Kg/Ea
Jumlah Harga

(Rp.)

264,442
1,756,913
1,177,313
1,044,488
947,888

5,191,043

631,733

631,733

1,380

1,380
5,824,156
5,824,200

5,824,200

118.00 Kg/Ea
Jumlah Harga

(Rp.)

302,220
2,007,900
1,345,500
1,193,700
1,083,300
5,932,620

721,981

721,981

1,380

1,380
6,655,981
6,656,000

6,656,000

170.00 Kg/Ea
Jumlah Harga

(Rp.)

339,997
2,258,888
1,513,688
1,342,913
1,218,713

6,674,198

812,229

812,229

1,380
4,123,350

4,124,730
11,611,156
11,611,200

11,611,200

245.00 Kg/Ea
Jumlah Harga

(Rp.)

377,775
2,509,875
1,681,875
1,492,125
1,354,125

7,415,775

902,476

902,476

1,380
4,581,500

4,582,880
12,901,131
12,901,200

12,901,200

315.00 Kg/Ea
Jumlah Harga

(Rp.)

415,552
2,760,863
1,850,063
1,641,338
1,489,538

8,157,353

992,724

992,724

1,380
5,039,650
5,041,030
14,191,106
14,191,200

14,191,200

439.00 Kg/Ea
Jumlah Harga

(Rp.)

453,330
3,011,850
2,018,250
1,790,550
1,624,950

8,898,930

1,082,971

1,082,971

1,380
5,497,800

5,499,180
15,481,081
15,481,100

15,481,100

548.00 Kg/Ea
Jumlah Harga

(Rp.)

566,662
3,764,813
2,522,813
2,238,188
2,031,188

11,123,663

1,353,714
1,353,714

1,380
6,872,250

6,873,630
19,351,007
19,351,100

19,351,100

2.70 Kg/Ea
Jumlah Harga

(Rp.)

12,592
83,663
56,063
49,738
45,138

247,193

30,083

30,083

-
277,275
277,300

277,300

5.20 Kg/Ea
Jumlah Harga

(Rp.)

18,889
125,494
84,094
74,606
67,706

370,789

45,124

45,124

-
415,913
416,000

416,000

7.50 Kg/Ea
Jumlah Harga

(Rp.)

25,185
167,325
112,125
99,475
90,275

494,385

60,165

60,165

-
554,550
554,600

554,600
11.00 Kg/Ea
Jumlah Harga

(Rp.)

37,777
250,988
168,188
149,213
135,413

741,578

90,248

90,248

-
831,825
831,900

831,900

18.40 Kg/Ea
Jumlah Harga

(Rp.)

50,370
334,650
224,250
198,950
180,550

988,770

120,330

120,330
-
1,109,100
1,109,200

1,109,200

25.50 Kg/Ea
Jumlah Harga

(Rp.)

62,962
418,313
280,313
248,688
225,688

1,235,963

150,413

150,413

-
1,386,375
1,386,400

1,386,400

37.00 Kg/Ea
Jumlah Harga

(Rp.)

75,555
501,975
336,375
298,425
270,825

1,483,155
180,495

180,495

-
1,663,650
1,663,700

1,663,700

51.00 Kg/Ea
Jumlah Harga

(Rp.)

88,147
585,638
392,438
348,163
315,963

1,730,348

210,578

210,578

1,380

1,380
1,942,305
1,942,400

1,942,400

61.50 Kg/Ea
Jumlah Harga

(Rp.)
100,740
669,300
448,500
397,900
361,100

1,977,540

240,660

240,660

1,380

1,380
2,219,580
2,219,600

2,219,600

71.50 Kg/Ea
Jumlah Harga

(Rp.)

113,332
752,963
504,563
447,638
406,238

2,224,733

270,743

270,743

1,380

1,380
2,496,855
2,496,900
2,496,900

85.00 Kg/Ea
Jumlah Harga

(Rp.)

125,925
836,625
560,625
497,375
451,375

2,471,925

300,825

300,825

1,380

1,380
2,774,130
2,774,200

2,774,200

119.00 Kg/Ea
Jumlah Harga

(Rp.)

151,110
1,003,950
672,750
596,850
541,650

2,966,310

360,990

360,990
1,380

1,380
3,328,680
3,328,700

3,328,700

148.75 Kg/Ea
Jumlah Harga

(Rp.)

188,887
1,254,938
840,938
746,063
677,063

3,707,888

451,238

451,238

1,380

1,380
4,160,506
4,160,600

4,160,600
Saturday
1.0 = 5.0 hrs 07,00 - 12,00 5 hrs x 1.0 =
0.0 = 0.0 hrs 12,00 - 13,00 1 hrs x 0.0 =
1.0 = 2.0 hrs 13,00 - 14,00 1 hrs x 1.5 =
1.5 = 1.5 hrs 14,00 - 17,00 3 hrs x 2.0 =
2.0 = 4.0 hrs
12.5 hrs x 22.0 days = 275.0 Hrs

rate/DB

6,296
41,831
28,031
24,869
22,569
123,596

HSD Rate/Lt Fuel rate/DB


21,350 23,750.00
5.0 hrs
0.0 hrs
1.5 hrs
6.0 hrs
12.5 hrs
2.3.3 Consumable Material for CS Piping

Project : PHR
Work : CONSUMABLE UNIT Q'TY
NO. WORK DESCRIPTION

CONSUMABLE & AUXILIARY MATERIAL


PIPING WORK ( CS ) 10,000 DB

1 Welding Rod LB-52 Ø 2.6 mm Kg 623


TGS - 50 Ø 2.4 mm Kg 210

2 Temporary Steel Material (Angle, H - Beam, F.B. etc. ) Kg 147

3 Gas Ar (7 M3 for Bottles) Bottles 83


O2 (7 K for Pipe) Bottles 114
C2 H2 (4 K for Bottles) Bottles 86
N2 (7 M3 Bottles) Bottles 6

4 Tungten for Tig Weld (Dia. 2.4 x 6") for C.S Pcs 144

5 Grinding Stone (D 100) Pcs 539

6 Grinding Stone (D 150) Pcs 93

7 Grinding Stone (D 405) Pcs 24

8 Rust Prevention for Bolt ( Molicort ) Lot 1

9 Handy Brush for C/S Pipe Pcs 25

10 Gum Tape Pcs 43

11 Gas Cutting Tip ( M type ) Pcs 34

12 Welding Glass (Black) Pcs 90


Welding Glass (Clear) Pcs 188

13 Rigger Glove Pcs 90

14 Welder Glove Pcs 86

15 Awning blue sheet for curing of pipe and Sheet 3


opening (5 M x 3 M) ( 4M x 6M )
16 Temporary Gasket (3t x 1.2 M x 2.4 M) Sheet 1

17 Temporary Strainer Lot 1

18 Hose Connection and Drain / Vent nozzle Lot 1

19 Miscellaneous Lot 1

SUB - TOTAL 0
NETTO PRICE
( Rp.)
UNIT update 03/2024 AMOUNT AMOUNT

48,000 52,440 29,904,000 32,670,120 update 25/3/2024


120,000 116,880 25,200,000 24,544,800

12,000 13,200 1,764,000 1,940,400

160,000 13,280,000
45,000 5,130,000
200,000 17,200,000
50,000 300,000

40,000 5,760,000

10,000 5,390,000

32,600 3,031,800

65,000 1,560,000

1,377,600 1,377,600

90,000 2,250,000

9,500 408,500

47,000 1,598,000

35,000 3,150,000
20,000 3,760,000

2,000 180,000

45,000 3,870,000

145,000 435,000
1,650,000 1,650,000

2,543,978 2,543,978

1,907,984 1,907,984

5,087,956 5,087,956

136,738,818

13,674
15,041 per DB
20 kg 1,048,800 52,440 familiArc
5 kg 584400 116,880 kobelco