Overall Equipment Effectiveness Calculator

Enter your data into the white boxes and click the page to calculate the OEE figure.
Place your cursor over the boxes with the red triangles for more information. Print this out for easy reference.

16.01.18 + COPY TURNING


Period/Equipment

Time A Total Time Available 1290 minutes

B Scheduled Downtime 30 minutes

C Unscheduled Downtime 300 minutes

D Operating Time (A-B-C) 960 minutes

Availability Rate = D/(A-B) 76.19%

E Total Production 5563 pieces

F Ideal Run/Cycle Time 3.75 pieces per minute

Performance Rate = (E/D)/F 68.99%

G Reject/Scrap Produced 25 pieces

Quality Rate = (E-G)/E

OEE Availability Rate Performance Rate Quality Rate

52.36% 76.19% 68.99% 99.61%