From Building Information Modelling to Automation


Production, The Next Future For Indonesia
Precast/Prestressed Construction Industry
Content
1. Conventional Way of Design and Construction
2. Building Information Modeling
3. Automation
4. Next Future Way of Design and Construction
Conventional Way of
Design and
Construction

I Want a Building
What Should I do ???
Conventional Way of
Design and
Construction

Call
Architect Civil Engineer
Consultant

Mechanical Electrical and


Plumbing Engineer
Let’s disscus our architectural
design concept

Plan View Section

Works in 2D 3D Just an Image


Give to Civil & MEP Engineer

Work also in 2D Civil Engineer


Mechanical Electrical and
Plumbing Engineer

DETIL BALKON

SV

Ø150

Ø150
Ø50
GWT-2 GWT-1 Ø50
R.POMPA 250 M3 250 M3

STR METERAN
Ø50 Ø65
FROM PDAM
Ø50
DEEP WEEL

PI PA CASING Ø200

JOHNSON SCREEN

Usually work in skematik


LET’S SUPERIMPOSE
Superimpose Architec &
Civil Engineer

Superimpose Architec &


MEP ???

Superimpose Civil
Engineer & MEP ???
BUILDING INFORMATION MODELLING
2D Superimpose handle design Revision

2D Struktur
2D Arsitek
Struktur ++ Arsitek
Arsitek + MEP
TENDER DOCUMENT

Drawing, Budget, Specificarion


CALL CONTRACTORS
PLEASE MAKE
OK, BOSS BIDDING WITH
I DO A REASONABLE
ANYTHING PRICE
FOR YOU
At Limited Time Contractor Make
Bidding From 2D Drawing
The Most Importan things,
we win the Contract
When the Contractors do Shop
Drawing
Design Drawing Conflict each other, what we must do ???
THE PROFESSIONAL
CONTRACTORS WILL DO ………..
Hey Boss, I think something SHIT!!!
wrong with Design, we must What’s?? (my Retention only 5 %)
hold the works until it’s clear. Consultant Check!!
RFI#1……….1000 RFI# 1………1000

Architect Civil Engineer

Hey Who
will pay Boss,
this ?!! we need
added CCO
To fix this
problem Mechanical Electrical
and Plumbing
Engineer
Architect
mmm…. Lest
The Consultan Decide
slow to Respons
our RFI
ourselves

OMG…My
Investment?!
Definisi
• Building Information Modelling atau kita lebih
sering mendengar dengan istilah BIM adalah suatu
proses yang dimulai dengan menciptakan 3D model
digital (bangunan secara virtual) dan didalamnya
berisi semua informasi bangunan tersebut, yang
berfungsi sebagai sarana untuk membuat
perencanaan, perancangan, pelaksanaan
pembangunan, serta pemeliharaan bangunan
tersebut beserta infrastrukturnya bagi semua pihak
yang terkait didalam proyek seperti konsultan,
owner, dan kontraktor.
Karakteristik
• Ketika akan menerapkan BIM pada suatu proyek maka
akan mempengaruhi cara kerja, karena semua proses
mulai dari desain konsep, 3D modeling, menganalisa
bangunan, membuat gambar kerja 2D, penjadwalan
proyek, sampai dengan perhitungan RAB (rencana
anggaran biaya) semua dikerjakan secara bersamaan.
• Pada proyek yang kompleks seperti high-rise building
dimana proyek melibatkan beberapa pihak maka
diperlukan adanya suatu koordinasi dan kolaborasi
data.
Karakteristik
KENAPA KITA BUTUH BIM
• Dengan BIM kita memiliki permodelan 3D
sehingga komunikasi menjadi lebih mudah
dan jelas, dan ketika terjadi permasalahan
dapat dengan mudah dideteksi sehingga
membantu kita melakukan evaluasi dan
membuat keputusan desain.
• Dengan BIM kita mendapatkan infomasi RAB,
kebutuhan jumlah volume material, serta
estimasi biaya yang lebih cepat dan akurat
karena datanya dikeluarkan oleh model yang
kita buat.
KENAPA KITA BUTUH BIM
• Dengan BIM memudahkan kita untuk berbagi
(sharing data) serta menggunakan data,
karena kita menggunakan satu data tunggal
untuk bekerjasama secara online (cloud), dan
juga mempermudah kita untuk mengakses
perkerjaan baik di meja kerja maupun ketika
dilapangan.
• Dengan BIM maka bangunan dapat kita
analisa terlebih dahulu seperti efek terhadap
beban yang diterima, angin, cahaya, dan
panas sehingga performa bangunan sesuai
dengan yang diharapkan.
KEUNTUNGAN MENGGUNAKAN BIM
• Kita dapat selalu ber-inovasi untuk menghasilkan
bangunan yang lebih kompetitif tanpa
mengorbankan kualitas, karena biaya dapat kita
prediksi sebelum pelaksanaan pembangunan.
• Dengan sistem koordinasi dan kolaborasi antara
pihak yang terkait proyek maka memudahkan
komunikasi dan membuat keputusan sehingga
mempercepat pelaksanaan proyek.
• Dapat menghasilkan bangunan yang ramah
lingkungan dan hemat energi.
TINGKATAN BIM
• BIM Level 0. Ketika membuat gambar desain 2D
menggunakan applikasi CAD, contoh
menggunakan AutoCAD.
• BIM Level 1. Ketika sudah dapat menampilkan
desain secara 3D, contoh menggunakan
SketchUp, 3ds Max.
• BIM Level 2. Ketika sudah dapat menghasil
RAB/BQ, detail desain, dokumentasi, data analisa
dari 3D model yang kita buat, dan sudah bekerja
secara kolaborasi dengan data dibuat secara
terlampir tetapi tidak menghilangkan identitas
maupun integritas-nya.
TINGKATAN BIM
• BIM Level 3. Ketika sudah bekerja secara
kolaborasi penuh antara disiplin ilmu dengan
satu model tunggal dan semua pihak dapat
mengakses secara online, data yang dikelola
termasuk penjadwalan konstruksi dan estimasi
biaya, serta siklus proyek.
TINGKATAN BIM
TINGKATAN BIM
TINGKATAN BIM

"Karena bengunan yang baik tidak hanya dilihat dari segi bentuknya saja, tetapi
juga waktu dan biaya pengerjaan serta hemat energi".
BUILDING INFORMATION MODELLING

•Revit •Revit MEP


Architec

Several 3D software
With data base and •Tekla Structure
Can communicated
each other HOUSE PROJECT
BUILDING INFORMATION MODELLING

•Revit MEP
•Revit Architec

•Tekla Structure FlATS PROJECT


BUILDING INFORMATION MODELLING
Material Volume can taken directly from model

•Revit ARSITEK •Tekla Struktur •Revit MEP


BUILDING INFORMATION MODELLING
Can prevent clash in and between 3 dicipline

•Revit Architec
BUILDING INFORMATION MODELLING
Can prevent clash in and between 3 dicipline

•Tekla Struktur
BUILDING INFORMATION MODELLING
Can prevent clash in and between 3 dicipline

•Revit MEP
BUILDING INFORMATION MODELLING
Can prevent clash in and between 3 dicipline

CLASH Warning
BUILDING INFORMATION MODELLING
Easy to handle design Revision

CLASH Tekla
Editing In Automaticaly 2D dwaring
Warning
the Was change
model
BUILDING INFORMATION MODELLING

ZERO RFI !!!!


BIM IN CONSTRUCTION

Fig. 2: Iconic and complex building which was elaborated by BIM Technology (Heino,2012)
BIM IN CONSTRUCTION

Fig. 3: Precast/Prestressed Building using BIM Techmology (Heino,2012)


Comparative Study
• A Group of Precaster visit Finland HQ 2 – 4
October 2012 to learn directly from the
source, see the real application,and hear some
testimony from customer
• Set programe to introduce BIM Technology in
Indonesia - 3 month trial licence
• Give recommendation other software to
complete BIM : Architect and MEP
Comparative Study
Comparative Study

Fig. 4: Eficiencies of BIM Technology in each Stage of Construction (Heino,2012)

PROMISE BY BIM !
Trial Licence Period
• Intermediate Training ( ) for 12 participant
• Application in some projects

Stairs in extreme contour condition


Trial Licence Period
• Prefabrication Product

PC Pile

Hollow Core Slab

PC Segmental Girder
Trial Licence Period
• Prefabrication Product

PC Post Tension Girder

PC Post Segmental Box Girder


Trial Licence Period
• Prefabrication Product

PC Post Tension Girder

PC Post Segmental Box Girder


PRODUCT SERIES PRECAST for BRIDGE & FLYOVER

BOX GIRDER

1.000 segmens,
produced within
200 working days
Trial Licence Period
• New Innovative Precast Structure

Fig. 8: BIM Application on the Design of Precast Structure in Pipe Rack of Petrochemical Industry
(PT Petro Jordan Abadi,2012)
Trial Licence Period
• Precast Structure Building

Fig. 9: BIM Application in Precast Concrete Detailer in Low Cost Housing of Ministry of Public Works 1 (Putra,2012)
Trial Licence Period
• Precast Structure Building

Fig. 10: Application in Precast Concrete Detailer in Low Cost Housing of Ministry of Public Works 2 (Prijasambada,2012)
Trial Licence Period
• Conventional Concrete Building

Fig. 11: BIM Application in Convetional Concrete Structure (PT Banua Anugerah Sejahtera,2013)
Trial Licence Period
• Integrated Building Design and Construction

Fig. 12: Design of 10-storey Low-cost Housing with Full Precast System (Ministry of Public Works,2013)
Trial Licence Period
• Integrated Building Design and Construction

Precast Structure
Trial Licence Period
• Integrated Building Design and Construction

Architectural
Trial Licence Period
• Integrated Building Design and Construction

MEP
Trial Licence Period
• Integrated Building Design and Construction

Open by Minster of Public Works at 9 October 2014


Trial Licence Period
• Comment after 3 month trial licence
– Indonesia expert can work with BIM, with some
‘exhaustic’ effort
– Can prevent clash
– Good tool for marketing
– Need more time to build a model rather 2 D
conventional
– Need advance training to speed working time
• Extent Trial Licence : 1 month
APPLICATION
• After trial licence period, 3 Precaster company
buy BIM Precast License (2013)
• The 3 company will present a testimony,
either good or ‘bad’ experience to give feed
back to arrange next step in BIM
dissemination
BAUMA 2013

Indonesia as ‘Partner Country’ of Germany in International Exhibition


BAUMA 15 -21 April 2013
IAPPI invited by Ministry of Public Work as Indonesian Delegation
BAUMA 2013

Learn and matchmaking with the latest of precast technology provider in the world
BAUMA 2013

Matchmaking with Tekla Germany

German manufacture industry supply


precast machinery production to all over
the world

Ready to aid Indonesia to implement BIM


in precast industry
COMPETENCY CENTRE
• Problems in dissemination
– Company must recognize ‘in real’ the advantage of using BIM
rather than conventional way
– Need legal trial licence in longer time
– Need training and mentoring in real project
– Price ?
• To cope the problem IAPPI – TEKLA make MOU
– 30 legal licence for pilot project for other precaster member
– Advance training for trainee ---intelegence component
– MOU witnesses to Ministry of Public Work
– Hope can start sistematic step to dissiminated BIM ways in
construction in Indonesia
PILOT PROJECT
• Low Cost Housing of Ministry of Public Works (2013 -
2014)
• 67 block on 33 site
• BIM model is upload in e-procurement tender and can
be down load to the bidder as complementary of
conventional 2D Drawing
• Competency centre give pilot project license to the
bidder (precaster) and training to operate
• Mentoring and monitoring during construction
• Hope after pilot project, the company can recognize
the benefit of using BIM 3D
PROJECT APPLICATION
• Low Cost Housing of Ministry of Public Works (2015 -2019)

• BIM model is upload in e-procurement tender and can be down


load to the bidder as complementary of conventional 2D Drawing
• Competency centre give pilot project license to the bidder
(precaster) and training to operate
• Mentoring and monitoring during construction
• Hope after pilot project, the company can recognize the benefit of
using BIM 3D
PROJECT APPLICATION
• Precast Structure Building

Fig. 9: BIM Application in Precast Concrete Detailer in Low Cost Housing of Ministry of Public Works 1
PROJECT APPLICATION
• Desain prototype berdasarkan modul yang efisien dan target grup

Ponpes
Mahasiswa

Pekerja TNI Polri


PROJECT APPLICATION
Contoh Implementasi di Pembangunan Rusun Sewa Pekerja Semarang 2015

Minggu 1 Minggu 2 Minggu 3

Minggu 7 Minggu 8 Minggu 9


PROJECT APPLICATION
Contoh Implementasi di Pembangunan Rusun Sewa Pekerja Semarang 2015

Minggu 10 Minggu 11 Minggu 12

Minggu 14 Minggu 18 Minggu 22


PROJECT APPLICATION
Contoh Implementasi di Pembangunan Rusun Sewa TNI Cililitan 2015

Kegiatan di pabrik :
produksi selama pekerjaan
struktur bawah di lapangan
Kegiatan di lapangan
PROJECT APPLICATION

Penerapan pada bangunan rusun sewa


dalam waktu pelaksanaan terbatas
PROJECT APPLICATION
PROJECT APPLICATION
PROJECT APPLICATION
KETERANGAN :
A.DINDING PANEL HOLLOWCORE
(600 X 2200mm)
B.KOLOM PRECAST
(150X150X2400mm) D
C. RINGBALOK
(150X150)
D.ATAP BAJA RINGAN
E.KUSEN ALUMUNIUM
F.PINTU MULTIPLEKS
G
G.LIST BETON CETAK
H C
E A
F B

RUMAH INSTANT
PROJECT APPLICATION

RUMAH INSTANT
PROJECT APPLICATION

RUMAH INSTANT
PROJECT APPLICATION

Launching produk rumah instant 1 hari industri pracetak dan prategang Indonesia di
Concrete Show of South East Asia 2015, Kementerian PU PR,IAPPI,AP3I

Pemasangan kolom pertama oleh Sekjen Kemen PU PR, erection kolom dan sloof
PROJECT APPLICATION

Pengarahan oleh Dirjen Penyediaan Perumahan Kemen PU PR, komponen dinding


ringan, erection ring balok, atap baja ringan, dan panel dinding ringan

Rumah instan tipe 36, peresmian oleh Dirjen Bina Marga Kemen PU PR
PROJECT APPLICATION

Pengarahan oleh Dirjen Penyediaan Perumahan Kemen PU PR, komponen dinding


ringan, erection ring balok, atap baja ringan, dan panel dinding ringan

Rumah instan tipe 36, peresmian oleh Dirjen Bina Marga Kemen PU PR
PROJECT APPLICATION

Industri pracetak dan prategang Indonesia siap mensupport program sejuta rumah

Apresiasi Menteri PU PR terhadap rumah instant pada Konstruksi Indonesia 2015,


diminta juga untuk mendukung Badan Nasional Penanggulangan Bencana (BNPB)
KETERANGAN :
PROJECT APPLICATION
A.DINDING PANEL HOLLOWCORE
(600 X 2200mm)
B.KOLOM PRECAST (300X400mm)
C. RINGBALOK (300X400mm) D
D.ATAP BAJA RINGAN
E.KUSEN ALUMUNIUM
F.PINTU UTAMA PANEL KAYU
PINTU KAMAR MULTIPLEKS
G.LIST BETON CETAK C
E

A B
F
PROJECT APPLICATION
PROJECT APPLICATION
PROYEK PEMBANGUNAN TAMAN SARI HIVE OFFICE PARK

KAVLING 2
PROJECT APPLICATION
1.1 ERECTION KOLOM
Penegakan Kolom Pengangkatan Kolom

Joint Kolom-Kolom

Support Kolom
1.2 ERECTION BALOK
Las stek pada balok

Pemasangan Balok

Bekisting Balok

Balok terpasang
Video
1.3 ERECTION HCS

Pemasangan HCS

HCS terpasang
PROJECT APPLICATION
PROJECT APPLICATION
PROJECT APPLICATION
GEDUNG IRADIATOR

R. IRADIATOR

R. Staff/Karyawan
AREA PUBLIK/HALL

DENAH LT.DASAR
PROJECT APPLICATION
PROJECT APPLICATION
PROJECT APPLICATION
PRESENTASI PENERAPAN BIM-TEKLA
PROJECT DESIGN AND BUILD PEMBANGUNAN PELINDO III
OFFICE CENTER - SURABAYA

PEMBANGUNAN KANTOR TELKOM GROUP MANYAR SURABAYA


PENDAHULUAN
 Bangunan ini adalah bangunan gedung bertingkat yang
mempunyai dua massa bangunan yaitu gedung kantor dan
gedung parkir. Kedua bangunan ini secara struktur dipisahkan
dengan dilatasi.
 Bangunan berlokasi di Jalan Tanjung Perak Timur Surabaya.
 Gedung ini terdiri dari 23 lantai gedung kantor + 1 basement
dan 5 lantai gedung parkir + 1 basement.
 Metode yang di pakai dalam pembangunannya adalah
menggunakan metode konvensional dengan material beton
bertulang.
KAK dan Dokumen TENDER PROJECT
 Dokumen Pemasukan diwajibkan Menggunakan Building Information
Modeling (BIM)
Building Information Modeling (BIM)
BUILDING INFORMATION MODELING
Building Information Modeling (BIM) merupakan salah satu lompatan terbesar dalam industri
Architecture, Engineering, and Construction (AEC) sejak teknologi Computer Aided Design
(CAD).

Dibandingkan dengan 2D CAD atau 3D CAD, BIM berfungsi seperti proses kerja arsitek atau
engineer dalam mendesain bangunan dan memuat metode konstruksinya. Tahapan desain
dapat berproses bolak-balik setiap saat. BIM memiliki kemampuan untuk memasukkan data
secara simultan mencakup semua elemen dari tahap desain konseptual hingga konstruksi
akhir. Saat perubahan dibuat di tahap yang lebih awal, elemen pada tahap berikutnya juga
berubah.
PENDAHULUAN

PARKIR KANTOR

dilatasi
KOMBINASI BIM DALAM PROSES
TENDER
• Archicad – Tekla – Revit MEP
KOMBINASI BIM DALAM PROSES
TENDER
• Archicad – Tekla – Revit MEP
KOMBINASI BIM DALAM PROSES
TENDER
• Archicad – Tekla – Revit MEP
Building Information Modeling (BIM)
Program BIM yang digunakan untuk Pekerjaan Struktur Menggunakan Program TEKLA
DESAIN STRUKTUR ATAS
PENENTUAN GAYA LATERAL AKIBAT GEMPA :

Peta Percepatan Batuan Dasar pada Periode Pendek Peta Percepatan Batuan Dasar pada Periode 1 Detik

Grafik respon spektrum gempa wilayah Surabaya


DESAIN STRUKTUR ATAS
SISTEM STRUKTUR YANG DIPAKAI:
GEDUNG KANTOR
SISTEM STRUKTUR :
Sistem ganda yaitu gabungan antara Rangka Pemikul Momen Khusus dan
Dinding Geser Beton Bertulang Khusus
Koefisien Modifikasi Respon, R = 7
Faktor Kuat Lebih Sistem, Ω0 = 2.5
Faktor Pembesaran Defleksi, Cd = 5.5

GEDUNG PARKIR
SISTEM STRUKTUR :
Sistem Rangka Pemikul Momen Khusus
Koefisien Modifikasi Respon, R = 8
Faktor Kuat Lebih Sistem, Ω0 = 3
Faktor Pembesaran Defleksi, Cd = 5.5
DESAIN STRUKTUR ATAS
DIMENSI KOMPONEN STRUKTUR & MUTU BAHAN :
SOFTWARE PERENCANAAN YANG
DIGUNAKAN
• ETABS
• PCA COLUMN
• Ms EXCEL
• Desain Spektra Indonesia, dari www.puskim.pu.go.id
• BIM - TEKLA
MODE SHAPE / PERIODE GETAR GEDUNG
PELINDO OFFICE
MODE SHAPE / PERIODE GETAR GEDUNG
PELINDO PARKING
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM
BIMSTRUKTUR
STRUKTUR TEKLA
TEKLA3D
3D
PROSES TENDER
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES TENDER
BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Kondisi Saat ini sedang


dilakukan superimpose
antara Ars+Str+Mep
BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

superimpose antara Ars+Str+Mep


BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Terlihat Posisi Ducting dan Pipa MEP


BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Area Posisi Corelift pada Bangunan Utama


BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Penulangan Kolom Area Basement Gedung Parkir dan Posisi Ducting MEP
BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Area Posisi Ramp Parkir


BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Area Posisi Penempatan AC Pada Basement Parkir


BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Volume Komponen Struktur output Tekla


BIM STRUKTUR TEKLA 3D
PROSES PERSIAPAN PELAKSANAAN

Volume Komponen Struktur output Tekla


Jasindo : Tender Design & Build : Precast BIM
Jasindo : Tender Design & Build : Precast BIM
AUTOMATION IN PRODUCTION

Slab renforcement and stirrups


with tie

Automatic bar bending machine


AUTOMATION IN PRODUCTION

Machine to produce precast pipe and


sewerage
AUTOMATION IN PRODUCTION

Several
automation
precast
production
machine in CSSEA
2014
NEXT FUTURE WAY OF DESIGN
AND CONSTRUCTION

In next 5 Years the


infrastructure and
Housing market is US $
430 billion , we need The
Ultimate Solutions
We Are Precaster can provide fast and precise
design with aid of BIM
And Then…
From Building Information Modelling to Automation
Production, The Next Future For Indonesia
Precast/Prestressed Construction Industry to The
Ultimate Solutions for Infrastructure and Housing
DON’T BE TOO LATE
NEXT FUTURE

• THE FIRST TAKE A MEASURE RISK….TO MAKE IT


POSSIBLE…….

• WILL TAKE ADVANTAGE THAT DIFFICULT TO


FOLLOW………