Professional Documents
Culture Documents
Plant Location: Santa Rosa, Laguna, Philippines Total Land Area: 23hectares
Plant Location: Santa Rosa, Laguna, Philippines Total Land Area: 23hectares
Availability of power
The main power source is coming from the MERALCO and the secondary source is the
generator set.
Availability of water
The source of water is coming from pumping the deep well.