You are on page 1of 2

Ambitious Electrical Engineer with record of continuously exceeding both company

and personal goals. Expertise includes AutoCAD and ETAP. Extensive knowledge
of electrical engineering design and applications.

Work History
2017 - 2019 PT. Indonesian Marine
Electrical Engineering

● Created document electrical power system as calculate load list,


calculate cable sizing, drawing single line diagram, drawing Indra Gunawan
electrical panel, drawing cable layout, drawing grounding system, Engineering
and created bill of material (BOM)
● Created document instrumentation as control narrative, control Personal Info
loop, control logic, P&ID, DCS/PLC configuratioin,
scematic diagram, and created bill of material (BOM) Address
● Inspected project sites to monitor progress adherence to Jl. Ketindan Gang
design specification, and safety protocols Taruna 1 No. 46 Desa
● Prepared project proposals, including cost estimates, schedules, Ketindan, Kecamatan
and project specifications Lawang, Kabupaten
● Developed cost estimates, procured equipment and tracked Malang, Jawa Timur
construction progress to efficiently complete large scale projects.
● Led project scheduling and budgeting to successfully and quickly Date of Bird
complete engineering projects. Malang, 18 Desember 1991
● Presented drawings to project manager and incorporated
recommended changes Sex
Male
2016-2017 PT. Iniled Indonesia Industri
Automation Engineering Nationality
Indonesia
● Created document engineering as wiring diagram, electrical panel,
flow chart, and PLC programming Phone
● Created bill of material (BOM) 085755102847
● Electrical panel installation
● Sensor setting for installation Email
● Testing and trying all equipment indra.ayasdw@gmail.com
● Installation equuipment in project site
● Project report Skills
CAD
2011-2012 PT. Pembangkit Jawa Bali Services Electrical engineering
Central Control Room Operator (PLTU) Power System
Microsoft Office
● Identified malfunctions or failures by routinely monitoring and Wiring Schematic
analyzing equipment operations DCS/PLC
● Received and processed both written and verbal instructions, SCADA
prints, and work orders Instrumentation
● Operated all equipment safely and efficiently on team of Automation Industri
employees Calculation Electrical Load List
● Collaborated with business development managers in partner ETAP
planning process to develop mutual performance objectives, Turbine System
financial targets and critical milestones Boiler Sytem
Water Treatment Plant

Education Waste Water Treatment Plant


2005-2008 Electrical Engineering Prepare Document Tander
Senior high school - SMK PGRI 3 Malang, Malang, Indonesia
2008-2011 Electrical Engineering Software
Bachelor Degree - State University of Malang, Malang, Indonesia Microsoft Office
CAD

Project Experience ETAP

2012 ● Start up and commisioning steam electricity Languages


power plant 2x22 MW Bahasa
English
2016 ● Automation PT. Toyota Indonesia as automation engineering

2017 ● Boiler biomass PT Astra Agro Lestari 1 as junior electrical and


instrumentation engineering
● Boiler biomass PT Astra Agro Lestari 2 as junior electrical and
instrumentation engineering
● Boiler biomass PT. Tapian Nadenggan as junior electrical and
instrumentation engineering
● Boiler biomass (Thermax boiler) PG. Asembagoes as junior
electrical and instrumentation engineering

2018 ● Boiler biomass PT. Musirawas Citraharpindo as Senior electrical


and instrumentation engineering
● Waste electricity power plant 1x750KW Badan Pengkajian dan
Penerapan Teknologi (BPPT) as electrical and instrumentation
lead project
● Steam electricity power plant 1x3MW PT. Merauke Narada
Energy as electrical and instrumentation lead project

2019 ● Fire tube boiler PT. Pembangkit Jawa Bali (PJB) as electrical
and instrumentation lead project
● Boiler Biomass PT. Inti Indosawit Subur as electrical and

You might also like