You are on page 1of 4

ARUN KUMAR PANDEY

Contact: 8317665158, 8186068616, 8287767417


arunpandey16@gmail.com,arunpandey1686@gmail.com

Seeking Middle/Senior level Assignments in:


Project Management based roles in Energy & Infrastructure Sector.
PROFESSIONAL PROFILE

 A result oriented professional about 11 years of experience in Project Designing/contract


management, Project Management, Quality Assurance, Project Resource management.
 Proficient in managing project operations and taking cost-saving initiatives to target the project in
scheduled manner.
 Proven abilities in enhancing process operations, optimizing resource & capacity utilization,
escalating project efficiencies; while curtailing costs and expenses. Expertise in project monitoring
& ensuring cost control within budgeted parameters.
 Proficient in reviewing of project schedule, ensuring cost control within budget. Demonstrated
excellence in handling activities involving working out various requirements & monitoring overall
project operations for ensuring timely completion.
 Experience in executing site enabling activities entailing following-up of contractual & statutory
requirements, installation of equipment, safety requirements at site.
 An effective communicator with exceptional relationship management skills with ability to relate
to people at any level of business.

AREAS OF EXPERTISE
Contract management Schedule management Resource management
Cost Management Vendor Development Project Management
Quality Management Scope Management Contract management
E&I Design and review Support in Procurement Management Resource management
Well versed as per IEC norms used in E&I(Safety&Quality)
Hands on experience in tools and technique used to track and control the status of the project lifecycle.

ORGANISATIONAL EXPERIENCE

Uttam Galva Metallics Limited Group, Wardha: Dec’09-NOV’011


Project Engineer (Electrical Sinter plant, Blast furnace, Power Plant & MRSS Projects) / -Plant design ,panel
layout ,equipment layout ,load calculation ,selection,system studies,relay coordination.

Rishabh Electrical Power Services, Location –Noida NOV ’11-MAY 2013


Sr. Project Engineer (PROJECT & DESIGN)-HANDLING project of
● Brahmaputra group—SMS & CPP (PROJECT of SMS, CHP, ASH HANDLING, ESP)-load calculation
,SLD,LAYOUT,Component selection,E&I system reliability studies,vfd,brakers,transformers protection setting
and relay coordination of Utilities.
● Bajaj Hindustan Power plant Jhansi-relay coordination,implementation of 61850 and system studies of MV
section SKM TOOL.
●MERAJ sugar — Meraj— SUBSTATION and COGENERATION POWER PLANT electrical and instrumentation
designing of plant ,plant layout,earthing layout/studies,cable section ,component selection,cb relay and panel
EPC,Cordination of BOP package with Siemens and IJT.

KINDEN INDIA PVT LTD


ENGINEER-PROEJCT DESIGN AND MANAGEMENT-
Yushiro india pvt ltd. (JUNE 2013 TO MARCH 2014)-Plant Design as per client requirement ,utilities ,panel,cables
PDB,LDB & Lighting ,VFD selection designing.
REPS –(Technical head& Project manager)( April 2014 –Feb 2019)Electrical and automation
Design for the vendors (contractor) as per their requirement
Regarding EPC, DDR, Designing review related issues /third party inspection.
(TP PAYROLL) in ISGEC ,construction of 5 MW Biomass power plant(dendro power
plant)KMRI,Colombo,Sri lanka(2016),

Aarti Industries Ltd, Ankleshwar,Gujrat 8MW BOILER project,Engineering,procurement and


commissioning-Boiler ,Captive power plant-Utilities,substation,DCS PLC panel engineering,SLD
Ssytem studies and relay coordination with existing substation.(DEC’16 to March’17)

TOKYO POWER 8MW,Trincomalee ,Sri lanka, Power plant EPC in respect of electrical and
Instrumentation,Project management from charter to sign off. (April’17 to till October’17)
GSK INDUSTRIES HEALTHCARE PVT LTD-1.5MW-Power plant EPC in respect of Electrical and
Instrumentation,Project Management from charter to sign off.(November17 to May18).

Owens Corning India Pvt ltd-EPC of L5-01 wrt Electrical and Instrumentation works of cold
repair shutdown.(June 18 to November 18)
UPPCL POWER PROJECT 660 MW-HARDUAGANJ-ALIGARH-(Dec 18 onwards)--E&I work of TG and
water system of plant(design review,project control ,Schedule,contract& cost management of project)

GMCG(GLOBAL MARITIME CONSULTANTS GROUP)


Project Manager (from August 2019 to Now)

Electrical AND CONTROL --Designing and analysis

 Estimation of Plant Electrical Load. Development of Single Line Diagrams (SLD). Control
Schematics for Power Feeder, Motor Feeder, Transformer Feeder.
 Selection and Sizing of Electrical Equipments. Cable Tray routing layout, schedule selection and
sizing. System Studies and Calculation i.e. Short Circuit Analysis (Fault Calculations and Stability
Studies), Load Flow Analysis, Motor Starting Study, Harmonics Study, dc battery and battery
charger, AC UPS.
 Relay Coordination of entire plant with HV / MV / LV substation/ power generation side, Earthing
& Lightening Protection Design, Sub-Station design. Electrical Equipment/System Specification.
 Handling of ETAP,AUTOCAD AND PHOTOLUX,SKM power tool for electrical designing, For
different calculation and design aspects, substation IEC 61850 consideration while automation
and communication point of view.
 Co-ordinate with other departments (Piping, Structural & Instrument) for clash checking with
cable ladder, lighting & equipment.
 Layouts pertaining to: lighting, conduit, cabling, floor trunking, earthing, lightning protection,
cable tray, General Arrangement, Cable calculation, Trench sizing.
 Guiding Engg. For preparation of Tender, bill of material requested for purchase and preparation
for purchase order.
 Maintaining records of drawings and documents in systematic way for reference.

 Accountable detailed engineering, system engineering, instrument sizing, and preparation of


instrument data sheets, specifications, layouts, loop drawings & logic diagrams.
 Maintaining, modifying & developing logic programs & mimic screen on SCADA platform &
transferring data from different platforms through PLC.
 Preparing drawings & documents required for implementing Automation Control related jobs of
PLC S7 300, S7 200, S7 400, ABB 800M, ALLEN BRADELEY COMPACT BUILDER, SUPCON
/HONEYWELL DCS PROGRAMMING.
 Responsible for system design, PLC panels along with software generation, networking of PLC, MIS
system, Net working with AC drives etc.

PROJECT MANAGEMENT
 Project integration management from initial to closing lifecycle as per my experience and and
expertise used by management at different stages of project.
 Defining the scope of project involved and time to time to update it as per completion, revision,
modification and some change request by consultation by client/consultant.
 Tracking the schedule by automated tools and also involve PERT/CPA so that we never going to hit
the baseline in any situation.
 Cost Management of the E&I as per resource ,deliverables and consequent conflict between other
functionaries.
 Aware of Inclination. interest and change and technology which reduce the down time before
problem and constraints craving to hit the baseline.
 Participate in preparation of  project charter. Identify all project milestone deliverables for all CPs.
Conduct CP & MSD workshop for de-briefing to the project team and assist with required
information to CM for project management.
 Execute Project change management ( PCR ) procedure for changes requested by customer, with
respective additional requirement or changes in contract terms. Execute & manage deviation
management procedure.
  Prepare a detailed interaction matrix between customer and site employees . Interaction matrix
would include the position, authorized persons for sharing information, nature of interaction,
frequency, and review mechanism and control the communication management so that only
referred persons having requisite impact on the project.
 Prepare review calendar in mutual agreement with customer/TPI ,project manager & KAM.
Prepare  plan for visit to include agenda/itinerary, list of visitors and accompanying personnel, ,
schedule, and MOM format including list of stake holders. Ensure closure of observations from
visit  and escalate pending points to relevant functions.
 Co-ordinate with Project Team for Punch point list closure. Get all the performance test getting
successfully completed ( through OMS and WR) and complete the reporting .Co ordinate with
customer for STPT/HOTO/ PCGT /Training  and project closure. Getting all MVAC and WCC signed
by customers representative on time and arrange to submit all documents required.
 Plan for compliance to statutory and regulatory requirements and Ensure to intimate the customer
and related agencies in HO on status of compliance

SCHOLASTICS

 B.Tech. (Electrical & Electronics Engineering from RKGIT, Ghaziabad, UPTU in 2009 with
67.5% marks.
 12th from T.V.N, Varanasi, C.B.S.E. Board in 2002 with 70.4% marks.
 10th from MSVM, Siwan, C.B.S.E. Board with in 2000, 90.6% marks.

Professional Training Attended:

 15 days training program for various controls & Automation used in Sofcon, Delhi, organized by
RKGIT, GZBD.
 6 days training program for controls & Automation used in Steel Plant, organized by fox control
(Siemens).
 PMI certification training under PMI training centre Pro thoughts,Hyderabad.
 3RD year internship for 45 days of switchyard of NTPC, Shaktinagar.

PERSONAL DETAILS

Date of Birth : 16th Feb 1986

Contact Address :67-2-26,ds homes 3,G4,ashok nagar,Kakinada-533003,Andhra Pradesh

You might also like