General Information
Production Blasting
Cartridge
Booster
Bench Height (m) 2.3 Weight (kg) 0.154 Quantity
Hole Length (m) 2.3 Quantity (nº) 154.0 Type Electric
Hole Inclination (º) 0 TOTAL (kg) 23.7 Quantity 60
Sub-drilling (m) 0.0 Type Anfo Detonators Type N°1,2,3,4,5,6,7
Drilling Pattern (BxS) 2.00 x 2.5 Weight (kg) Quantity
Bulk
Stemming (m) 1.5 Quantity (nº) 75.0 Type
Stemming Material Soil TOTAL (kg) 75 Quantity 328
Detonation
GRAN TOTAL (kg) 98.7 Type Riocord 6g/m
Cord
Total of Holes 88 Quantity -
PF (kg/m3) 0.10 Type -
Initiator
Volume (m3) 1.012 Max. Load (kg) Quantity 0
Caution Blasting
Booster
Bench Height (m) - Weight (kg) Quantity -
Hole Length (m) - Quantity (nº) - Type
Hole Inclination (º) TOTAL (kg) - Quantity
Sub-drilling (m) Type - Type -
Cartridge
Pre-splitting Blasting
Key Information
Total Volume blasted (m3) 1.012 Total of Indugel (kg) 23.7 Average PF (kg/m3)
Pre-Splitting Surface (m2) - Total of Cartridge (kg) - Max. Inst. Charge (kg)
TOTAL of Explosive (kg) 98.7
Total of Caut. & Prod. Holes 88 Total of Boosters 0 Total Meters Drilled (m) 328
Total Pre-splitting Holes 0 Total of Detonators 388 PS* meters Drilled (m) -
Gran Total of Holes 88 Total of Lead in Lines 0 * Pre-Splitting
English Version
Blast No 0
Plan de Voladuras
Plan de Voladuras Date: 21-Oct-19
Environment
0.05
Max. Inst. Charge (kg) 1.122 0.045
Distance (m) PPV (mm/s) 0.04
0.035
Peak Particle Velocity
50 0.0
PPV (mm/s)
75 0.0 0.03
100 0.0 0.025
(mm/s)
0.02
150 0.0
0.015
200 0.0 0.01
300 0.0 0.005
500 0.0 0
1000 0.0 0 100 200 300 400 500 600 700 800 900 1000
Distance from the Blast (m)
Provisions to Avoid Fly-Rocks Conservative Stemming
Production blasting.
Stemming
Cartridges
Bulk Rioflex 0
0
134
184
234
284
334
384
434
484
534
584
634
684
734
784
842
917
1042
84
Booster
Detonator
Det. Cord
English Version
Blast No 0
Plan de Voladuras
Plan de Voladuras
Date: 21-Oct-19
Sobre tamaños
Initiation Point
ms
ms
English Version
Blast No 0
Plan de Voladuras
Date: 21-Oct-19
Charge per Hole