Ryan Bonner IOF Assignment 02
Ryan Bonner IOF Assignment 02
DATE GIVEN: OCTOBER 14, 2019 DATE EXPECTEED: OCTOBER 16, 2019
QUESTION
individually typed letters to various firms. A time study has been done on the task of preparing
letters for mailing. On the basis of the observation in Table 3, ITEAJ wants to develop a time
standard for the task. The associations personal, delay and fatigue allowance factor is 15%.
minutes)
A) Since part A requires us to find the normal time, we need to use the following equation
provided in class:
Normal time for element B = Average cycle time x (percentage rating/ 100)
= 1.05
3+4+3+1+2
And the average cycle time for element B = 5
13
= 5
= 2.6 mins
Hence:
B) To find the standard time for the Job, we were given the following equation:
- The associations personal, delay and fatigue allowance factor is 15%. (given)
- To find the total normal time, we have to find the normal time of each job element
o Normal time for element = Average cycle time x (percentage rating/ 100)
6+8+7+21+11
average cycle time for element A = 5
53
= 5
= 10.6 mins
Normal time for element C = Average cycle time for element A x (percentage rating for A/ 100)
3+1+6+3+1
average cycle time for element C = 5
14
= 5
= 2.8 mins
= 18.53 mins
18.53
= 0.85
= 21.8 mins
Note, The values from the table with an asterick should be excluded from the calculations