SITE CLEARANCE AND EARTHWORKS (ALL PROMIIONAL) Bescon Ta BITE LEARANCE AND EARTHWORKS (AL PROVISIONAL) ISTE CLEARANCE Nore [Theres for bu excavation sal inte fr excavation sow wae abe ve excavating in wher Sol except jock end he formation of enbarmaris on slopes races [eczvaon for fomaton eel nd ig, inde for aii hendig, Ie measuremert_al all excevaton and subsequence isposals shal bo these ble excavaton. Al excavaton Ie moesiros ne. Tne nerace In bk afer excaaton shallbe alowed fin the Conrators ates. |e rate sha also incute for al enoorry nage and 5 measures, ec. , ab doscibed lo keep the se oe [ro toon, resin lr siding et. Ste clearance cia the aa ofthe entre se of al ass weds, shrubs, bushes unrgowh, metal and fon scraps, at, gubbg up cesing rcs, and remove al debris ton the sie, lacuna at rich duped, oa cu o be fund bythe acer, cud paying al dvs. Agpoxmatl 10.30 fares). [TEMPORARY WORKS TO BE MANTAINED AND REMOVE [WHEN NO LONGER REQUIRED Entrance paves {orm Sand bing (consoled thickness) rom an perro source, area ana consldatg. (1) sayore ou ery ty concrete irtttrg pang oc a on sand ling (measured seperaty)comectes me inshes as {dozen ooeatares who manta’ pros lostucions compltawthet-base and bass couse incidrg 210 100 100nm 0a cnet ets. [scrum Thick (maximum) approved aspatic concrete remix, compet wth "nm ck epoxy. ten ra m2 m2 EXTERNAL WORKS {COST ESTIMATE NO s9RM2 ean a 15.000 518 400] 1500004 zz | 19000] 76000} ss | a4aoo] 1272000) To Catoctin a0] SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL) Tata “aa re cor [TEMPORARY WORKS TO BE MAINTAINED AND REMOVE WHEN NO LONGER REQUIRED (Conta) {sh To 1 [Conduct wash trough ovral ne 6850 rn xA7OOr x [24am dees, compet wih 200nm tick hardcore and sore tik Concete base gad 30 riroroad wh weld [res 21a trae re cacaed fo sit cea sit tocar 2m i M.S bat 75m le Juels to op of 05x305x &7 mm kai UE. wth Sm fick oa late on £8 vate Sprinter ant Minoranco [remporry store © | Su, aya et compacted emporio jer tor ik cnher an base cue, spread and el [an consid n compactod gourd Io Ergou's pro, [temoorary Extn ain © |cavate tench provide Temporary Earth" Oran wih [1 slope ana kop fe rom ground wale, sidng la necessary works ond mavianed the rains 1b [Engineers seston. [Tenwora orks. E | supa ya et compacted tempo od andlor Ji one ick chor ranbase couse, spread andl lard consi incarrpacedgrcund n Enger approval sa Loy F |5uppt arin Oren igh wea tol mesh once incadig wit se-supporing gece and comple wih 800mm ng wodtel post 300mm cca ost en Inrmunsrmin gardes perro APRENOFOT [sedinr Bsin 66 [oorsiuct sediment basin oval size 21000 mm lst tedden x 1600rm deep an Kop store fom guns Wale, inducing af necessary works and manned be (rns a Engrers eaters, ka, Ne 1 me} 11360 Neo 1 15.000 000 nag} 70 10.09 00000} 15000. ‘00.0 000.08 00 73588, a0 000 EXTERNAL WORKS ‘COST ESTIMATE NO 1 10902 emir To Colecton STE CLEARANCE AND EARTHWORKS ALL PROVISIONAL) Dosen Tal_—Giy ate Aout ran couecTion Page No EXT. 7 Page No exr.12 2908209 ‘SITE CLEARANCE AND EARTHWORKS (ALL PROVISONSL) EXTERNAL WORKS Carieto SummaryR 830 (COST ESTIMATE NO 9902 eran ROAD WORKS ALL PROVISIONAL) Ta ay, ‘ana 1 xirun depth rat exceeding 1.00 [im oxace and compact fomation sures oeeaued lors cambar as and cos ss spec 8 To cave sane Uarkatbincing (measured separately) etndng ot m © oom ick wet compacted in 2 tyr: reve Jixamonirder Alls E ecm ick asphaltic cone binder course finshed layer lt premix cortsng of ‘Sram = 2mm coarse soe, load and loved to fal, chanbere, wal ranmnod ard lenses etal (O04 bate F |scppty ant apey oe tsk cost of bturin emulsion of i000 panaason train of 15m sq parle whe fetace of Binder course and frsod freon pei [ting (measirod soparaoy) s 6 [forty tx asphaltic concrete wearing corse frishod ‘et prom consising of 1Sem- 12mm coarse leoaregste, reed and leveled to fls, chan, wel [armed and oonsobats. 1 [Supply & instal busines per cot a 1361 9070 oro sia. OF 49) 800] +609] sn} 380 sag} moss 52000) 13600000] 18301020) za. 50021 s1ratoog ‘1.70.09 [EXTERNAL WORKS (COST ESTIMATE NO 1 ORO erat To Colon 95,1820] Deseo Uae ROAD WORKS (ALL PROVISIONAL) oy eau ROAD WORKS ALL PROVISIONAL (ont) kerbs, Chanel and Easing canst tin stony tee xbmc cuca ied ret tered ton pont sacs eT jphdircenet mt ('3ncdh al weaotry lemon eiocanant sd bent ons Wo geo mat cont cue tot e200 Se layed onan an ear on GAL tet snot nc, aero nts lege at Pie hele 20m ay re din instoresoo : lee ant sty to cas sproed sat resig er sear oo cob eatin paras spaod' Foro ape Dips Po AB waren | atom eouak tava sasconry re" 7 scavte_euface jon wl cua orca to (le nd famed pavement uns asinam depth ot exceeding 100m [cus un sored, leveled and commerted tread acon camber fis and ens fs. as coc. Soren Tick; wel compacted oecae snd bacing {sand tanked or anoroal enn mai as [nae compacted as szenied on sof around Sore Tick vlad tal jours {surly ard instal quar sper manwachrosinsbucin| Irons wart lesa : tn ea [S262 Bat. at m secofonce wih mend rd inscons [cere ine pair in stip 100m we, on promi sucess [Pedestrian css wake pit, on remix surscos , m3 m2 mz 58 ose 75 85 sn a 9509 ser 01009 000) 17.0009 1500) 5.20 1325) z3203 00) 2120 979) artis2y 18000) 13,9500 2e0] tama 20) 22 [EXTERNAL WORKS COST ESTIMATE NO 1-toRm2 era ToCotectonra) az ROAD WORKS ALL PROVISONAL) tt —_Deseription Unit iy Rete “Amaount TABOR A PROVSOWAL at en ation esa aan ps gm it Saas et ous oh rac er Seomepennareatonnwienpensautons | m| 6 | 25 coe secon nate sinmvispentnsiee | m | ore | a] atc Paniainens nap om t nperissuian | | 2a | a5 sao Liotta xsatoimmde | wo] 1 | ane, hun socnreyaceaeosrsommmwee | n+ | ited Taner recon ome mw] 3 200 mi econ ows we] 2] say ace oni ton ares we] +] soay ee lector et etn soe ne] 1] snay sxe seer aac re ve] +] may com at xen gone ve] se] m0 to eS Vile Ih Slouay On eta mow at ur ming rg eta feck en sce — he Lek pi sm cx oie tc pr ia et aS Peesasa Son hein sient by ol bow slo frown gre ee Ses Caetrecte ate sae geo a na Ieee Sw wn eon y hott wn carr pert as tinge ngs pac seri fences obec Oat Sitter (ocaaiciamterucrastime | | | sac] 2a ere none Tecan aa ‘COST ESTIMATE NOs -9RO ext ROAD WORKS ALL PROVISONAL) Deseo ta ‘unt OAD WORKS ALL PROVISIONAL) (ont) Reason Cont) | Sanérs NOUR FORAY VEHICLES ipo 1750 x stra corsnusada SWIG SIC am ally eid card rela 75m dame coarised ol a Inskumpat gsncarpte wen ri nas 2.0mm Ingh can nase conee Grade 30 boo foundational pe Drag No. WAQ2TZHARMOTIO a (ype 4 ‘Stender ‘AWAS signage overal sie 750 x850n, {consrce of $.G SNS curr aly wlio and incdig Pr dara glriod sal ike dum pst po cont ith rl, ate; 220 rinirum igh cas. nase conte Grade 30 base ounaton a2 ot Draung No. NADZTZHRYRIDTIN2 and 8 (Type RP. 11) sertrsOATONHOP size St dame ast feSW.GSICN durin soy waded arcing 75m [ase gaeriaed sos ie mesum pet grade oro fin angle pe, 200rm nnn iho rae ore [rat 50 send apr Oar No WAZ" ONR four ans 4 (Type RP. 12), [standard “PADESTRIAN CROSSING sgnage, each se [750° 8sorm and 500 x 350mm, constuced of S.C [SiC aluminium atoy welded to and ining 75m faretar gaterisod see! ube. modum post grado fst wth angle, lt; 2200 inna igh cast n frase cence Grade 30 base oundaton alas per [raving No UAdZIZHRIRAADTIOZ a 0 (Type RP. 1) [Sandan “BERILALUAN signage, ral E00 xD, lcs of SG SIGN uri ly wed ard fctutr Tsn clare gaarisd sel tbe medium post late colt win ge, pt, 2200rm minum esk lnmas concrete rade 30 base euaon. aos pe [sing No at EHRROAET? and Ot yp0 WD 2) srr PAEONSFORGERELEPEOAD oer Se [00 xeon, consrcted of .¥1G SICA alain soy |eied oad rang 7S dame gaarised set tube [rept ere wre pie, 220mm fight nas coer Crece 3b foun alas (Org Ne MACRO ard Type NO.) [sandal PARKING’ sgnage overa size 600 xO, lanes of SWIG ICN iain aly wo ard [rete Tern cave galvarisd sel tte men post [rate congo wor arg, plate 200re relma high cask Inimars concrete Grade 0 base furdatn, al as per [raving No MAN2Y2HRIROTIOZ and O (Typ Cl 4) PA6«BA Sionaye No. No | ssa0d 1] sso0q 3] ssa0q 285009 200 75009 EXTERNAL WORKS ‘COST ESTIMATE NO 1-192 To Catecson ee ~ | eal a [ROAD WORKS (ALL PROVISIONAL) a ae “anout ROAD WORKS (ALL PROVISIONAL) (Cnt) Road signage (Con's [os Hm ‘200010 length x 101 Thick cuved-or-scton asphiic {conrad hump comes wh 150 ewe ine [otra centres por ranrg No MAZ" HARON TID) ‘0 Wen ylow br a3. sets No Naoaranseraaors {esi [cory ou BR Test n subgrade as intuced by he $0. jn accatarcoo 8:8 1377" Tho ros ust meet the |ricimarrequrement as per sro. (Teneo ole {atespenses for al fale sampes il tbe entetined) pe oun ec Dens Test On Coe Sales Tak tw samples io [etomne els deny and coarsticiness a8 specie. [Te supp abo and ecuipment to cay ct crn esto leurnire and pat upon carplton alas per Egioat [nstucton and Loca Aor requrerent. LK Sim erelyrs = Costlfega! extvacion Meshal! fo No saa} 150.09 70.09 e000) 70 1.50009 1,700.09 1,800.09 EXTERNAL WORKS GOST ESTIMATENO 1-19 eras To Catecten Ru ‘25360 [ROAD WORKS ALL PROVISIONAL) (eon rr oy sate —— i] couecTiON Page No EXT24 Page No exr22 Pago Ne E208 Page Na EXT24 Page No EXT 66,163 srozar ss,78¢ 1805009 1269609 ROADWORKS (ALL PROVISONAL) [EXTERNAL WORKS ‘COST ESTIMATE NO «ROK exe Cariedto SunmanyRM| 4328 SURFACE WATER DRANAGE (ALL PROVISONAL) Dein —_ SURFACE WATER ORANGE A PROVSIONAL) stm HRs Dra m |r| sooo) zz2on009 fom sonep 09 No | a3 | nag) sao [sor sup tash aceon wo] | sama 2000 \soxcare stmimx ecm a] 199 tes ee fee Pectin, Tyee | ms | com tase [Precast ean 90» S00mm | ser] ona) azo TS sing sess SS fren serves | | | \ EXTERNAL WORKS To coc | 208,100 ‘GOST ESTIMATE NO 1 -19RM2 erat SURFACE WATER DRANAGE (ALL PROVISIONAL) E agg a ay Rats rt] [SURFACE WATER ORANAGE (AL PROVISIONAL (Contd) ‘COLLECTION Page No, EXT 31 2082100 ‘SURFACE WATER DRAINAGE (ALL PROVISIONAL) “EXTERNAL WORKS Caria Summana 282-0000 CCOSTESTINATE NO 1- 1902 era LS WATER RETICULATION ALL PROVISIONAL) —beserigton — Tay Rate WATER RETICULATI PROVE [excawaion was ‘Noe: At excavaton are measured om formation love. [Excavate Jeol fo te where ee re [Trenchret exons 150m deep and average On dep for [200mm clams Ductile ron pipe (measure seperaiay). | m | 936 25.00) 2.40000) [Trenen not eycagcing 1\S0m deep and average 0:S0m focep tr claneler Hydrant Ductle ion pipe {measure seperaoy) mio Bi za200] JPt fr shice vake chamber not exceeting 260m deep. | mg. 6 2 35200] Pit for scour valve chamber not exceeding 2S deep. | md 1 2 154.0] 15 Fi for Al Valve Pio garden tap nt oxcooding Om doop. 13 5 2 11009 [sans of war [Keeping the surface of te excavation free of sutace water | tem 1,500.00] [Exact forkeeping te excavaton ree ct water water Rate Cry [sacking with anoroved sand excavated bec sand |ocmass concrete once 40 (ype 1,2, 3nd 4)on top nd [pstom fhe ipe as descr [Te 00mm diameter duction pipe (measured seporiay) | m | 936 7o0o} —65,52800| [ro(B)rm ameter duce on hydrant m/s 3500] 32586500] [Oucte on spe incuing of nocessory join, Hanae end jealctasdescbed. [300mm Diameter pipe ad and jointed in trench (mesure feperaely) m] 36 400.00) 37440n00) {Gh Diameter pie lad and jointed in woneh( Hycrany | m | 891 20000) 16,200.00) {0mm Diartarx 90 Degree No. 1 988.30 9210 {900mm Diamar x45 Dagree No. 1 998,30 90430 (900mm Diemer x22 114 ogre No. 1 998.3 90420 EXTERNAL WORKS To Coeeson Toa. (COST ESTINATE NO 1 ‘9Ru2 erat WATER RETICULATION (ALL PROVISIONAL) oy Fae “unt 10 mm siamete ava. fe ta Avs Seas gor [re nycanttiSAINS and SOBA standard wh dovble late par hydrant to BS 750 wan chaned ml cap, Hom dameter cat fon double Sanged ditance sie [iv spate exact ground lve! when fed ning [ocr east ron dove fange dockoo bend selon an Inca mass concrete grate 35 ard SOO mx 600 mx "comm tice coreete base sab ar cal fon exeason lpece to suit reing precast chamber, sand bese and at ns eo oe eo HAMAD. lortcap leacrster [5x moter 0 1$0 084M wah & 8 of 90 depos bend, 2 Ios ip b cle ion shice gata vaho, tet sear wih lube ange, staigttona double Tanger. sot pece Manges. anges sdapior and supored by 180 mm x Becton mans cone cng a ecaeey fag, os ano spe ory noMADRTENAMMRIONES Isndemese pay ier, [sgl metro Sana wn 4 08 o 50 dares low sap cake Zon dane shies el ne, [areas weal pe essary fat nd os pr drawing no A a za} 3000 00 No} 3] s0000 No No. Wo co L ret 4 S| sera 6] sooo 300000} 5.00009 cnn} bay sseanean} eonaa} EXTERNAL WORKS ‘COST ESTIMATE NO oRm2 oman WATER RETIGULATON (ALL PROVISIONAL} Daxcpion Tay Fats Amount no} 23 | 0000) 220000 8 |Forscawcs valve no} 22 | 100.00] 2300.00 © |Forbuk mete No 2| 220.00) 400.00} 0 Forte hytant No 8 | 20000} 20000] E |rortee i | coo} 60000 F [Foren No 2| — so0e0] 20009 fForendeap / Ne 6 | tooo} ——saneo) Frverial ond No. + | tana} 000 concrete 35 esc, 4 |poeromate 4zotmm x 300mm x 10am tick cape lpn for buk meter complete wih one ayer At fare Fetorcerent ond ora No. 2] seroo} —resen} X ppprsinate 2280 x 300mm x Tn ik coer fob for silo metar wih one layer of AND abe Foleo a ormwor No. 2] ssro0} 70200} | th lowna fr sxuc vate chamber} lan coneeaate 1S.8desctd, | fommétinina seed spestandinwied ndersew sab | m2] 71 | as7co] 1887.09 mass concer 5 ascescbed, 1 |b source ve suppor. - m3 4] apsoo 114400} N [To base sod ma} 1 | zrac0} 30809 » [Towa ms} 25 | zra0] 6825.09 [Renocementin various amet, fsb to | 180 380) 6.14809 fen J} ma | 2250 360] 11,700.00) EXTERNAL WORKS Te Cotecn sara ‘COST ESTIMATE HOt 9RM2 oma WATER RETICULATION (ALL PROVISIONAL} Ba Desesipion Uni — ate Amount \WATER RETIGUL ATION (ALL PROVISIONAL} (Con's) {cogs E1 fommok fish, [To sides cfbase sib m2 n mM 241404] [To sides cf wat ma] 16 ms sara {990mm x 200mm x 75mm thick precast slab cover for | | |scouce valve chamber completo wih 2 nos of 75mm jiameter cng of 12mm itso bar No. a 00, 1.500 [A set of 20mm disater galvanised mid steal sagged at [300mm cr as stanged ste iron wih one end enbedded feonerot wa No. a 0000] 6800 | End of scource vai chamber) {Te folaning fr sca valve chamber) {Lean concrete oad [somm Binding exeed spread and eveled underbese seb | m2 n 2371 18709) conereto grade 35 a |As sluice vale support m3 4 esq) 1.14 36 }iorate reinforced ade as Ho base slab 3 " ‘z7a0q) 300300) [To wail m3 % ars0o) a: [Reinforcement in vrous dam, to, [sab a | 0 eq) 5,148.0) ja ig | 3250 aq) 11,7000) {cass 1 fomnkErish. [To sides of base slab me n san] 2414.09 To sides of wat me} 16 400] 5474.00 fete cng of 12mm risa ar tio. a $00.00, s1.000| EXTERNAL WORKS ToCotecton RM] 9052800] ‘GOST ESTINATE NOt 8RH2 era Basen \WATER RETICULATION (ALL PROVISIONAL) ie To ULATION| SIONAL (Con [A sot t en came gataisd mild steel sagged at Soden rsa tagged tp Fo wt one end erbeded to lorerae wal Ne End tice vave camber) Suactins |aow fr connasing to new 300 am dametr et kon (pet exsing war mins ncudng mt ontng and ober [necessary acessories and make good te road Ne Ist rm art bs class 9 pe spe and ah |naer wh Shodan absent arletnmdarar | ange, range cour rect stick SAMS fA Sle /.. pearseenetier sae Eeirmesecantc gO | nu [Aton fx tstng ofthe wile of he wats spy system fucg lying ar on compleon al as deserted ard rake food any detects and leave everyting inp wkrg larder t the eno satsiecton of We SO, and Local [rahecin. ew + | ssomoq 8 s00.09 3000 728001 0.09 EXTERNAL WORKS ‘COST ESTIMATE NO 4-92 errs. Te Cotacton i rasnan| WATER RETICULATION (ALL PROVISIONAL) z ese Tait Gy ate Aut TION, JONAL ‘couscron Page No EXT rose Page Ne EXT42 ‘7950420 Page No. EXT ‘413.09 Pogo No. EXT. sosznay Pogo No, ExT 200 WATER RETICULATION (ALL PROVISIONAL) [EXTERNAL WORKS. Carred a Summary] (COST ESTIMATE NOt 19RM2 eras sora) SEWERAGE WORKS (ALL PROVISIONAL) pean ae SEERA WORKS AL ROMIRONA) cae. ct onto cm a est (sna nme eee rec wn at Sena and cara ‘Trench, maxrum depth ret exceetng Odi deep and rege 17s doe lr pur Saree ep Poe ie Inno eos ee ptr mele ann cent ce ee [ea tr excatnexinceh ee Px ocmanieaximan eth exes 2008 deen [mtextedea oar hue m| | sof eae fea recto kin tech | s| sof aoa [sacking a described Facgipo Hr 7 om} ms] rae] rasco mf as | toe] ee 7a cv ec he 198 i pes cuniet aay soo c Le Ce fo. 4 cre cara rn oa stom onaee’s wes to mm Dante mato notecedng S10 mceep | oo ‘iownoo) — zasmon 210mm Dsante cesg 200 mdse | no somo] esamoy — Aes Boren bl Comecter pipe 40 Fridig, Moh] = finely Penled goed. extily mona i 2 Tie cta TERNAL WORKS Tocaieseni rei] ‘COST ESTIMATE NO -9R02 ers SEWERAGE WORKS (ALL PROVISIONAL) Ta ‘Oy Rate ‘eur Inspection Chamber (supe and_sonenet precast cons mantles (csseion chen ene wh —SOmm_ ties [ened nman Ai ck ol ode 27 bese wih eefocoment ond eowela erst nies See ee i nop abe snd PC 1200 mm Diameter manhole getxceedng( 0m deep) sini ant en cason manos, [240mm x wad am ea duty duciton manele cover | 'KOMBARAL wording ekg are ting deve ard [pss dia en tore iota coal ae ong 8 [Enainoes ruinge ri PANSEOS-TICISMDET.OGA > [spl sbour and mata frjning 225 mn daneter \Virted cay ge to external extng mara win end nclaig a nacessaryadional Weng, sooner, wer gp? eatng [Testing and comisoing [caning out CCTV test othe pasty rain as ected by {ne Cand to to requrement ofthe JPP. Theale sat include rhe equpmers, labour an preparation oo (2) [sa oftest reports a wo (2) ns. of of copes in CD. “Test he wile of te sewerage sytem inthe presence of tte win water or by oer rears, make geod any |otcsest on complaon and leave te hl peek jstang oder o he one eataton ofthe SO" 7 | 10228 280 000) 0004 70187 1090000 30.09 sono [EXTERNAL WORKS. (COST ESTINATE NO 1-082 ese Te Cotweson i sae] SEWERAGE WORKS (ALL PROVISIONAL) Dass oy Rate et | ‘SVERAGE WORKS (ALL PROVISIONAL (Cont) ‘couecTiOn Page No. EXSY ‘sme Page No. EXT ans ‘SEWERAGE WORKS (ALL PROVISIONAL) EXTERNAL WORKS ‘Caredo Sunmay Ful 16487409 “GOST ESTIMATENO 1-102 ers

You might also like