Wellcompletionandstimulationslideshare PDF
Installing production
casing
Setting Production Casing
Installing the Tubing
Packer
Type of Well Completions
Liner Completions.
A liner is install across the
pay zone. Tubing
Can be divided into two:
Screen Liner and Perforated Production casing
Liner.
Screen Liner: Casing is set Packer
above the producing zone,
and an uncemented screen
and liner assembly is
installed across the pay zone
Screen and
liner
assembly
Type of Well Completions
Screen Liner
Completion
Type of Well Completions
Perforated Liner
Completion: Casing is set
Tubing
above the producing zone,
and a liner assembly is Production casing
installed across the pay zone
and cemented in place. The
liner is then perforated Packer
selectively for production.
Liner
Perforation
Type of Well Completions
Perforated Casing
Completions.
Production casing is Tubing
cemented through the
producing zone and the pay Production casing
section is selectively
perforated. Packer
Perforation
Perforated Casing Completions
Type of Flow